文档简介
./r/nPAGE/r/n./r/nXX省/r/nXXX市/r/nXXX镇XXXX/r/n水电站增效扩容改造工程/r/n建设管理工作报告/r/n建设单位:/r/nXXX市XXX镇XXXX/r/n水电站/r/n二/r/n○/r/n一/r/n六/r/n年/r/n六/r/n月/r/n审定:/r/n审核:/r/n校核:/r/n主要编写人员:/r/n./r/nPAGE/r/n./r/n目录/r/n/r/n/r/n1/r/n工程概况/r/n/r/n6/r/n/r/n1.1/r/n工程位置/r/n/r/n6/r/n/r/n1.2/r/n立项、初设文件批复/r/n/r/n6/r/n/r/n1.3/r/n主要建设任务及设计标准/r/n/r/n7/r/n/r/n1.3.1/r/n工程建设任务/r/n/r/n7/r/n/r/n1.3.2/r/n设计标准/r/n/r/n7/r/n/r/n1.4/r/n主要技术特征指标/r/n/r/n7/r/n/r/n1.5/r/n工程主要建设内容/r/n/r/n11/r/n/r/n1.6/r/n工程布置/r/n/r/n13/r/n/r/n1.7/r/n工程投资/r/n/r/n13/r/n/r/n1.8/r/n主要工程量和总工期/r/n/r/n13/r/n/r/n2/r/n工程建设简况/r/n/r/n16/r/n/r/n2.1/r/n施工准备/r/n/r/n16/r/n/r/n2.2/r/n工程施工分标情况及参建单位/r/n/r/n16/r/n/r/n2.2.1/r/n施工分标情况/r/n/r/n16/r/n/r/n2.2.2/r/n参建单位/r/n/r/n16/r/n/r/n2.3/r/n工程开工报告及批复/r/n/r/n17/r/n/r/n2.4/r/n主要工程开完工日期/r/n/r/n17/r/n/r/n2.5/r/n主要工程施工过程/r/n/r/n17/r/n/r/n2.6/r/n主要设计变更和工程量变化/r/n/r/n18/r/n/r/n2.7/r/n重大技术问题处理/r/n/r/n18/r/n/r/n2.8/r/n施工期防汛度汛/r/n/r/n18/r/n/r/n3/r/n专项工程和工作/r/n/r/n19/r/n/r/n3.1/r/n征地补偿和移民安置/r/n/r/n19/r/n/r/n3.2/r/n环境保护工程/r/n/r/n19/r/n/r/n3.3/r/n水土保持设施/r/n/r/n19/r/n/r/n3.4/r/n工程建设档案/r/n/r/n19/r/n/r/n4/r/n项目管理/r/n/r/n21/r/n/r/n4.1/r/n机构设置及工作情况/r/n/r/n21/r/n/r/n4.1.1/r/n项目法人/r/n/r/n21/r/n/r/n4.1.2/r/n设计单位/r/n/r/n22/r/n/r/n4.1.3/r/n监理单位/r/n/r/n22/r/n/r/n4.1.4/r/n施工单位/r/n/r/n22/r/n/r/n4.1.5/r/n质量监督单位/r/n/r/n23/r/n/r/n4.1.6/r/n地方政府/r/n/r/n23/r/n/r/n4.2/r/n主要项目招标投标过程/r/n/r/n24/r/n/r/n4.3/r/n工程概算与投资计划/r/n/r/n25/r/n/r/n4.3.1/r/n批准概算与实际执行情况/r/n/r/n25/r/n/r/n4.3.2/r/n投资来源、投资到位及完成情况:/r/n/r/n25/r/n/r/n4.4/r/n合同管理/r/n/r/n26/r/n/r/n4.5/r/n材料及设备供应/r/n/r/n26/r/n/r/n4.6/r/n资金管理与合同价款结算/r/n/r/n26/r/n/r/n5/r/n工程质量/r/n/r/n28/r/n/r/n5.1/r/n工程质量管理体系和质量监督/r/n/r/n28/r/n/r/n5.1.1/r/n项目法人质量管理/r/n/r/n28/r/n/r/n5.1.2/r/n设计单位质量管理/r/n/r/n28/r/n/r/n5.1.3/r/n监理单位质量管理/r/n/r/n28/r/n/r/n5.1.4/r/n施工单位质量管理/r/n/r/n29/r/n/r/n5.1.5/r/n工程质量监督管理/r/n/r/n30/r/n/r/n5.2/r/n工程项目划分/r/n/r/n30/r/n/r/n5.3/r/n质量控制和检测/r/n/r/n31/r/n/r/n5.3.1/r/n原材料质量检测/r/n/r/n31/r/n/r/n5.3.2/r/n施工实体质量检测/r/n/r/n31/r/n/r/n5.3.3/r/n竣工验收工程质量抽样检测/r/n/r/n31/r/n/r/n5.4/r/n质量事故处理情况/r/n/r/n32/r/n/r/n5.5/r/n质量等级评定/r/n/r/n32/r/n/r/n6/r/n安全生产与文明工地/r/n/r/n33/r/n/r/n6.1/r/n安全管理机构/r/n/r/n33/r/n/r/n6.2/r/n安全生产目标/r/n/r/n33/r/n/r/n6.3/r/n安全保证措施/r/n/r/n33/r/n/r/n6.4/r/n文明工地/r/n/r/n34/r/n/r/n7/r/n工程验收/r/n/r/n35/r/n/r/n7.1/r/n单位工程验收/r/n/r/n35/r/n/r/n7.2/r/n工程建设档案验收/r/n/r/n35/r/n/r/n8/r/n竣工验收技术鉴定/r/n/r/n36/r/n/r/n9/r/n遗留问题及处理情况/r/n/r/n37/r/n/r/n10/r/n工程运行管理情况/r/n/r/n38/r/n/r/n10.1/r/n管理机构、人员和经费情况/r/n/r/n38/r/n/r/n10.2/r/n电站管理机构及岗位设置/r/n/r/n38/r/n/r/n11/r/n竣工财务决算编制/r/n/r/n39/r/n/r/n12/r/n工程尾工安排/r/n/r/n40/r/n/r/n13/r/n经验与建议/r/n/r/n41/r/n/r/n13.1/r/n经验/r/n/r/n41/r/n/r/n13.2/r/n建议/r/n/r/n41/r/n/r/n14/r/n附件/r/n/r/n42/r/n/r/n附件一:工程建设大事记/r/n/r/n42/r/n/r/n附件二:前期批复、投资计划、实施方案、招标投标批复文件/r/n/r/n45/r/n./r/nPAGE/r/n./r/n1/r/n工程概况/r/n1.1工程位置/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造工程/r/n〔简称/r/nXXXX/r/n电站增效扩容改造工程,/r/n项目法人是/r/nXXX市XXX镇XXXX/r/n水电站〔简称/r/nXXXX/r/n电站,站址/r/n位于/r/nXXX市XXX镇XXXX/r/n、托坪、龙江三村交界处的/r/nXXXX/r/n河畔,距/r/nXXX镇XXXX/r/n管理区2km。距/r/nXXX市/r/n城区14km。坝址位于湘江水系/r/nXXXX/r/n干流上游,坝址地理位置为东经111/r/n°/r/n48/r/n′/r/n11/r/n″/r/n,北纬27/r/n°/r/n43/r/n′/r/n45/r/n″/r/n。水库大坝控制集雨面积580km/r/n2/r/n,坝址以上干流长度47.0km,水库总库容26.32万m/r/n3/r/n,正常库容14.0万m/r/n3/r/n,死库容12.32万m/r/n3/r/n,正常蓄水位122.50m。/r/n该工程项目/r/n从/r/n20XX/r/n6/r/n月开始/r/n在/r/nXXX市/r/n水务局的指导下,开始/r/n规划、论证。/r/n根据水利部《关于印发农村水电增效扩容改造项目验收指导意见的通知》〔水电〔2012〕329号,财政部、水利部关于印发《农村水电增效扩容改造财政补助资金管理暂行办法的通知》〔财建〔2011〕504号,水利部《关于印发农村水电改造项目机电设备选用指导意见的通知》〔水电[2011]438号,水利部、财政部《关于印发农村水电增效扩容改造项目建设管理指导意见的通知》〔水电[2011]441号等文件精神,对/r/nXXXX/r/n电站进行增效扩容改造。/r/n1.2/r/n立项、初设文件批复/r/n20XX7月29日,水利部、财政部以水规计〔2011〕392号文件,批复《XX省农村水电增效扩容改造试点实施方案》,批准XX省农村水电增效扩容改造项目启动,/r/nXXX市XXXX/r/n电站就在其中。/r/n20XX/r/n7-8/r/n月,由/r/nXXXX/r/n电站委托/r/nXXXX/r/n市水利水电勘测设计院对/r/nXXXX/r/n电站增效扩容改造工程/r/n的初步设计进行/r/n编写/r/n。/r/n20XX/r/n8/r/n月/r/n26/r/n日,/r/nXXX市/r/n水务局组织相关工程技术人员对《初步设计报告》进行了审查,/r/n20XX/r/n12/r/n月/r/n6/r/n日下发了《/r/n关于对/r/n〈/r/nXXXX/r/n电站增效扩容改造工程初步设计报告〉的批复》/r/n〔/r/nXXXX/r/n[20/r/n12/r/n]/r/n103/r/n号/r/n,对项目初步设计进行了批复,同时确定总投资/r/n175.79/r/n万元。/r/n1.3/r/n主要建设任务及设计标准/r/n1.3.1/r/n工程建设任务/r/nXXX镇XXXX/r/n水电站/r/n,装机/r/n3/r/n台,/r/n设计水头为4.2m,/r/n原/r/n总装机520kw〔2/r/n×/r/n160kw+1/r/n×/r/n200kw,多年平均发电量目前约为167万kwh,/r/n本次/r/nXXXX/r/n电站增效扩容改造的主要建设/r/n任务/r/n是:引水坝处理、导水槽清淤堵漏、尾水桶处理、机房美化装修;更换三台水轮发电机组、控制保护更新、更换变压器及所有电气设备改造;拦污栅处理、更换闸门的启闭设备。/r/n1.3.2/r/n设计标准/r/nXXXX/r/n电站增效扩容改造主要是改造机电设备部分,增加自动化程度,减少或降低劳动强度。/r/nXXXX/r/n电站装机520/r/nkW/r/n,以发电效益为单一目标,水库/r/n正常库容14.0万m/r/n3/r/n。根据《防洪标准》〔/r/nGB50201-94/r/n和《水利水电工程等级划分及洪水标准》〔/r/nSL252-2000/r/n规定,确定/r/nXXXX/r/n电站水库工程为/r/nⅣ/r/n等工程,相应主要建筑物大坝、发电厂房为/r/n4/r/n级建筑物,/r/nXXXX/r/n电站水库为浆砌石坝,本次洪水计算标准为/r/n30/r/n年一遇设计,/r/n200/r/n年一遇校核,消能防冲洪水标准为/r/n20/r/n年一遇。/r/n1.4/r/n主要技术特征指标/r/n电站总装机容量/r/n520/r/nKW/r/n〔/r/n1/r/n×/r/n2/r/n00KW+2/r/n×/r/n160/r/nKW/r/n,主要特性见/r/n下/r/n表。/r/nXXXX/r/n电站增效扩容改造工程特性表/r/n序号及名称/r/n单位/r/n数量/r/n备注/r/n改造前/r/n改造后/r/n一、水文/r/n气象/r/n1流域/r/n全流域面积/r/nkm/r/n2/r/n7155/r/n7155/r/n电站水库控制集雨面积/r/nkm/r/n2/r/n589/r/n589/r/n利用的水文系列年限/r/n年/r/n16/r/n53/r/n1959-2011/r/n2气象/r/n多年平均气温/r/n℃/r/n17.1/r/n17.1/r/n极端最高气温/r/n℃/r/n40.1/r/n40.1/r/n极端最低气温/r/n℃/r/n-12.9/r/n-12.9/r/n多年平均相对湿度/r/n℅/r/n82/r/n82/r/n多年平均降雨量/r/nmm/r/n1401/r/n1335/r/n多年平均迳流深度/r/nmm/r/n790/r/n786/r/n多年平均蒸发量/r/nmm/r/n1349/r/n1346/r/n多年平均平均风速/r/nm/r/n/s/r/n1.6/r/n1.6/r/n年平均日照总时数/r/nh/r/n1680/r/n1680/r/n无霜期/r/nd/r/n282/r/n282/r/n3径流/r/n多年平均年径流总量/r/n亿/r/nm/r/n3/r/n4.12/r/n4/r/n下泄流量及相应/r/n上/r/n下游水位/r/n上游/r/n下游/r/n设计洪水位时最大泄量/r/nm/r/n3/r/n/s/r/n1408/r/n1408/r/nP=3.33%/r/n相应水位/r/nm/r/n127.28/r/n125.20/r/n校核洪水位时最大泄量/r/nm/r/n3/r/n/s/r/n2220/r/n2220/r/nP=0.5%/r/n相应水位/r/nm/r/n128.80/r/n126.63/r/n5水位高程/r/n坝顶高程/r/nm/r/n122.50/r/n122.50/r/n设计上游最高水位/r/nm/r/n122.50/r/n122.50/r/n设计上游正常水位/r/nm/r/n122.50/r/n122.50/r/n设计下游最高尾水位/r/nm/r/n118.70/r/n118.70/r/n设计下游正常尾水位/r/nm/r/n118.50/r/n118.30/r/n设计下游最低尾水位/r/nm/r/n118.30/r/n118.10/r/n设计下游枯水位/r/nm/r/n118.00/r/n117.80/r/n6水头/r/n最大水头/r/nm/r/n4.5/r/n4.4/r/n设计水头/r/nm/r/n4.2/r/n4.2/r/n最小水头/r/nm/r/n3.5/r/n3.8/r/n二、水库/r/n校核洪水位/r/nm/r/n128.80/r/n<P=0.5%>/r/n设计洪水位/r/nm/r/n127.28/r/n<P=3.33%>/r/n正常蓄水位/r/nm/r/n122.50/r/n122.50/r/nXXXX/r/n电站增效扩容改造工程特性表/r/n序号及名称/r/n单位/r/n数量/r/n备注/r/n改造前/r/n改造后/r/n死水位/r/nm/r/n120.50/r/n120.50/r/n总库容/r/n万/r/nm/r/n3/r/n26.32/r/n26.32/r/n兴利库容/r/n万/r/nm/r/n3/r/n14.00/r/n14.00/r/n调洪库容/r/n万/r/nm/r/n3/r/n死库容/r/n万/r/nm/r/n3/r/n12.32/r/n12.32/r/n多年平均含沙量/r/nK/r/ng/m/r/n3/r/n0.259/r/n0.259/r/n年最大含沙量/r/nK/r/ng/m/r/n3/r/n9.51/r/n9.51/r/n多年平均输沙模数/r/nt/km/r/n2/r/n•/r/na/r/n174/r/n174/r/n多年平均输沙模数/r/nt/km/r/n2/r/n•/r/na/r/n623/r/n623/r/n年平均输沙量/r/n10/r/n4/r/nt/r/n10.092/r/n10.092/r/n年最大输沙量/r/n10/r/n4/r/nt/r/n36.134/r/n36.134/r/n三、工程效益指标/r/n1992年前/r/n2002/r/n~20XX/r/n装机容量/r/nk/r/nw/r/n480/r/n520/r/n520/r/n日保证出力<P=50/r/n℅/r/n时>/r/nk/r/nw/r/n160/r/n日保证出力<P=85/r/n℅/r/n时>/r/nk/r/nw/r/n50/r/n多年平均发电量/r/n万/r/nk/r/nw/r/n·h/r/n167.3/r/n141.1/r/n196/r/n近三年平均137.32/r/n年利用小时数/r/nh/r/n3485/r/n2713/r/n3769/r/n四、主要建筑物/r/n1/r/n厂房/r/n型式/r/n河床式/r/n河床式/r/n平面尺寸〔长/r/n×/r/n宽/r/nm×m/r/n19.3/r/n×/r/n8/r/n19.3/r/n×/r/n8/r/n水轮机安装高程/r/nm/r/n120.50/r/n120.50/r/n4/r/n升压站/r/n型式/r/n室内开关柜/r/n室内开关柜/r/n五主要机电设备/r/n〔/r/n1/r/n水轮机台数/r/n台/r/n3/r/n3/r/n型号/r/nZD760-LM-120/r/nZDK400-LM-120/r/n金城江、XX/r/n机组编号/r/n1#/r/n2#/r/n3#/r/n1#/r/n2#/r/n3#/r/n额定出力/r/nk/r/nw/r/n77/r/n~/r/n383/r/n210/r/n185/r/n210/r/n额定转速/r/nr/min/r/n193/r/n~/r/n385/r/n250/r/n250/r/n250/r/n飞逸转速/r/nr/min/r/n363/r/n~/r/n628/r/n553/r/n553/r/n553/r/n最高水头/r/nm/r/n4.4/r/n4.5/r/n4.4/r/n4.6/r/n设计水头</r/n额定水头/r/n>/r/nm/r/n3.8/r/n4.2/r/n3.8/r/n4.2/r/n最低水头/r/nm/r/n3.2/r/n3.8/r/n3.2/r/n3.8/r/n设计流量</r/n额定流量/r/n>/r/nm/r/n3/r/n/s/r/n4.57/r/n~/r/n7.95/r/n6.75/r/n5.7/r/n6.5/r/n浆叶安装角度</r/nф/r/n>/r/n+10/r/n°/r/n+15/r/n°/r/n+10/r/n°/r/n+15/r/n°/r/n吸出高程/r/nm/r/n+2.5/r/n+2.5/r/n+2.5/r/n+2.5/r/n〔/r/n2/r/n发电机台数/r/n台/r/n3/r/n3/r/n机组编号/r/n1#/r/n2#/r/n3#/r/n1#/r/n2#/r/n3#/r/n型号/r/nTSN74/32-8/r/nTS173/17-24/r/nSF160-24/1730/r/nSF200-24/1730/r/n金城江、XX/r/n额定功率/r/nkw/r/n160/r/n200/r/n160/r/n200/r/n额定转速/r/nr/min/r/n750/r/n250/r/n250/r/n250/r/n飞逸转速/r/nr/min/r/n1800/r/n553/r/n553/r/n553/r/nXXXX/r/n电站增效扩容改造工程特性表/r/n序号及名称/r/n单位/r/n数量/r/n备注/r/n改造前/r/n改造后/r/n发电机功率因数/r/n0.8/r/n0.8/r/n0.8/r/n0.8/r/n额定电压/r/nk/r/nv/r/n0.4/r/n0.4/r/n0.4/r/n0.4/r/n额定电/r/n流/r/nA/r/n288/r/n361/r/n290/r/n361/r/n额定/r/n励磁/r/n电压/r/nV/r/n31/r/n83/r/n83/r/n83/r/n额定/r/n励磁/r/n电/r/n流/r/nA/r/n116.5/r/n121/r/n113/r/n121/r/n〔/r/n3/r/n厂房内起重机/r/nT/t/r/n8T/5t/r/n〔/r/n4/r/n主变压器/r/n台/r/n1/r/n1/r/n型号/r/nSJ-560/6.3kv/r/nS/r/n11/r/n-630/10.5kv/r/n额定容量/r/nkva/r/n560/r/n630/r/n额定电压比/r/nK/r/nv/kv/r/n6.3/0.4/r/n10.5/0.4/r/n额定电流比/r/nA/A/r/n49.7/808/r/n36.4/909/r/n阻抗电压/r/n4.0/r/n℅/r/n4.7/r/n℅/r/n〔/r/n5/r/n输电线路/r/n并网点/r/n斗笠山煤矿柑子山/r/n35kv/r/n变/r/n涟源双车110kv变/r/n回路数/r/n1/r/n1/r/n线路线型及长度/r/nmm/km/r/nLGJ-50/5.7/r/nLGJ-50/9.0/r/n输电线路电压等级/r/nkv/r/n6/r/n10/r/n〔/r/n6/r/n进水控制闸门/r/n扇/r/n3/r/n3/r/n〔/r/n7/r/n进水控制闸门起闭机/r/n台/r/n1/r/n六、施工/r/n1/r/n主体工程数量/r/n混凝土拆除/r/nm/r/n3/r/n24.84/r/n混凝土凿除/r/nm/r/n3/r/n21.6/r/n水泥注浆/r/nm/r/n164/r/n混凝土/r/nm/r/n3/r/n109.5/r/n钢筋制作安装/r/nt/r/n10.5/r/n2/r/n施工期限/r/n总工期/r/n月/r/n6/r/n七、经济指标/r/n1/r/n静态总投资/r/n万元/r/n157.12/r/n2/r/n总投资/r/n万元/r/n158.86/r/n建筑工程/r/n万元/r/n12.11/r/n机电设备及安装工程/r/n万元/r/n101.23/r/n金属结构设备及安装工程/r/n万元/r/n17.72/r/n临时工程/r/n万元/r/n2.29/r/n环保及水保工程/r/n万元/r/n2.00/r/n独立费用/r/n万元/r/n11.38/r/n基本预备费/r/n万元/r/n10.39/r/n建设期贷款利息/r/n万元/r/n1.74/r/n3/r/n综合利用经济指标/r/n装机容量/r/nkw/r/n520/r/n520/r/n年均发电量/r/nkw/r/n·/r/nh/r/n141.1/r/n196/r/n年利用小时数/r/nh/r/n2713/r/n3769/r/n单位千瓦投资/r/n元/r/n/k/r/nw/r/n3055/r/n单位电度投资/r/n元/r/n/kwh/r/n0.86/r/n经济内部收益率/r/n%/r/n18.90/r/n财务内部收益率/r/n%/r/n7.41/r/n上网电价/r/n元/r/n/kwh/r/n0.32/r/n筹款偿还年限/r/n年/r/n5/r/n./r/nPAGE/r/n./r/n1.5/r/n工程主要建设内容/r/nXXXX/r/n电站增效扩容改造工程/r/n整个工程项目的主要建设内容包括:/r/n引水坝和导水槽改造、发电厂房装修美化、3台水轮发电机组/r/n更新改造/r/n、控制保护及所有机电设备改造、闸门和拦污栅改造、升压站改造等内容。/r/n项目设计建设内容及实际完成情况见/r/n下/r/n表。/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造工程/r/n建设项目一览表/r/nI/r/n工程名称:/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造工程/r/n序号/r/n一级项目〔分部工程/r/n二级项目〔单元工程/r/n施工位置/r/n设计建设内容/r/n备注/r/n1/r/n1/r/n1/r/n水轮机安装/r/n尾水管里衬单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n2/r/n转轮室、基础环、座环单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n3/r/n蜗壳单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n4/r/n机坑里衬及接力器基础单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n5/r/n转轮装配单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n6/r/n导水机构单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n7/r/n接力器单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n8/r/n转动部件单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n9/r/n水导轴承及主轴密封单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n10/r/n附件单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n2/r/n1/r/n发电机安装/r/n上、下机架单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n2/r/n定子单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n3/r/n转子〔转子部件单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n4/r/n制动器单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n5/r/n推力轴承和导轴承单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n6/r/n机组轴线调整单元工程/r/n〔3个/r/n机房内部/r/n安装、试验/r/n3/r/n1/r/n调速器安装/r/n1#调速器安装及调试/r/n〔1个/r/n机房内部/r/n安装、试验/r/n2/r/n2#调速器安装及调试/r/n〔1个/r/n机房内部/r/n安装、试验/r/n3/r/n3#调速器安装及调试/r/n〔1个/r/n机房内部/r/n安装、试验/r/n4/r/n1/r/n电气设备安装/r/n1#机组控制保护〔三合一屏安装/r/n〔1个/r/n机房内部/r/n安装、试验/r/n2/r/n2#机组控制保护〔三合一屏安装/r/n〔1个/r/n机房内部/r/n安装、试验/r/n3/r/n3#机组控制保护〔三合一屏安装/r/n〔1个/r/n机房内部/r/n安装、试验/r/n4/r/n主变测控保护屏安装/r/n〔1个/r/n机房内部/r/n安装、试验/r/n5/r/n1/r/n附件及进水闸阀设备改造/r/n1#机组附件及进水闸门改造安装/r/n〔1个/r/n机房内部、进水口/r/n安装、试验/r/n2/r/n2#机组附件及进水闸门改造安装/r/n〔1个/r/n机房内部、进水口/r/n安装、试验/r/n3/r/n3#机组附件及进水闸门改造安装/r/n〔1个/r/n机房内部、进水口/r/n安装、试验/r/n6/r/n1/r/n建筑安装工程/r/n机组基础混凝土浇筑/r/n〔1个/r/n机房内部/r/n凿除、浇筑/r/n2/r/n墙漆喷刷工程/r/n〔1个/r/n机房内部/r/n油漆、美化/r/n3/r/n门窗安装工程/r/n〔1个/r/n机房内部/r/n更新、改造/r/n1.6/r/n工程布置/r/n所有工程均按原来的布局、位置不变。三台水轮机组,原来是间联形式改为直联形式。/r/n1.7/r/n工程投资/r/n20XX12月6日,/r/nXXX市/r/n水务局以"/r/nXXXX/r/n[2012]103号文关于对《/r/nXXXX/r/n电站增效扩容改造工程初步设计报告》的批复"文件,该项目下达投资计划:中央财政资金52万元,省级配套资金26万元,自筹资金97.79万元。/r/n1.8/r/n主要工程量和总工期/r/n各单位工程主要工程项目及工程量见/r/n下表/r/n。/r/n./r/nPAGE/r/n./r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造工程/r/n完工结算表/r/n序号/r/n项目名称/r/n单位/r/n合同工程量/r/n合同单价〔元/r/n申报/r/n备注/r/n工程量/r/n金额〔元/r/n1/r/n办公、差旅、补助等费用/r/n40,753.00/r/n2/r/n引水设施等改造/r/n24,475.00/r/n3/r/n低耗等开支/r/n48,931.50/r/n4/r/n机房、办公房改造费用/r/n54,480.00/r/n①/r/n厂房、办公房改造/r/n19,955.00/r/n总价承包/r/n②/r/n铝合金门窗改造/r/nm/r/n2/r/n93.16/r/n155.00/r/n93.16/r/n14,440.00/r/n按实结算/r/n③/r/n机房改造/r/n20,085.00/r/n总价承包/r/n5/r/n设计费/r/n22,000.00/r/n6/r/n监理费/r/n11,300.00/r/n7/r/n发电设备费/r/n755,000.00/r/n实付71.5万/r/n①/r/n发电机维修〔SF200-24/1730/r/n台/r/n1/r/n21,000.00/r/n1/r/n21,000.00/r/n合同单价/r/n②/r/n发电机〔SF200-24/1180/r/n台/r/n1/r/n144,000.00/r/n1/r/n144,000.00/r/n合同单价/r/n③/r/n发电机〔SF160-24/1180/r/n台/r/n1/r/n128,000.00/r/n1/r/n128,000.00/r/n合同单价/r/n④/r/n水轮机〔ZDK400-LM-120/r/n台/r/n3/r/n114,000.00/r/n3/r/n342,000.00/r/n合同单价/r/n⑤/r/n三合一配电屏/r/n台/r/n3/r/n23,000.00/r/n3/r/n69,000.00/r/n合同单价/r/n⑥/r/n手电两用调速器〔YWT-100/r/n台/r/n3/r/n12,000.00/r/n3/r/n36,000.00/r/n合同单价/r/n⑦/r/n进水闸门/r/n台/r/n3/r/n5,000.00/r/n3/r/n15,000.00/r/n合同单价/r/n8/r/n安装费用/r/n153,819.10/r/n①/r/n水轮机/r/n台/r/n3/r/n26,720.00/r/n80,160.00/r/n合同单价/r/n②/r/n发电机/r/n台/r/n3/r/n21,502.00/r/n64,506.00/r/n合同单价/r/n③/r/n电缆安装/r/n100m/r/n0.20/r/n3,021.00/r/n604.20/r/n合同单价/r/n④/r/n电缆安装/r/n100m/r/n0.40/r/n3,021.00/r/n1,208.40/r/n合同单价/r/n⑤/r/n主变压器S11-630/r/n台/r/n1/r/n6,115.00/r/n6,115.00/r/n合同单价/r/n⑥/r/n手电两用螺杆起闭机QL-10/r/n台/r/n3/r/n408.50/r/n3.0/r/n1,225.50/r/n合同单价/r/n总计/r/n1,110,758.60/r/n因发电设备费实付71.5万元,帐列总投资:/r/n1,070,758.6元/r/n。/r/n./r/nPAGE/r/n./r/n整个工程项目/r/n完成配电屏柜安装/r/n4套/r/n,发电机组安装调试/r/n3/r/n台,变压器安装调试/r/n1/r/n台及其它配套设施。/r/n该工程批复建设总工期为6个月,20XX10月开始动工建设,20XX3月完工。/r/n实际施工时间是:20XX11月开始,将不影响发电部分的机房装修等设施就已经开始施工。2015年7月开始机电设备的安装调试,至2015年12月安装调试完成,总施工期14个月。/r/n./r/n./r/n2/r/n工程建设简况/r/n2.1/r/n施工准备/r/n在工程开工前,/r/n20XX6月/r/n,/r/nXXX市/r/n人民政府/r/n授权/r/nXXX市/r/n水务部门为主,成立了/r/nXXX市/r/n农村水电增效扩容改造工作领导小组;/r/n20XX7/r/n月,委托/r/nXXXX/r/n市水利水电勘测设计院完成了初设工作;/r/n20XX12/r/n月/r/n6/r/n日,/r/nXXX市/r/n水务局以"/r/nXXXX/r/n[2012]103/r/n号文关于对《/r/nXXXX/r/n电站增效扩容改造工程初步设计报告》的批复"文件,批复同意/r/nXXXX/r/n电站增效扩容改造;/r/n20XX6/r/n月/r/n16/r/n日,/r/nXXX镇/r/n人民政府以"石政发/r/n[2014]40/r/n号文关于明确/r/nXXX市XXX镇XXXX/r/n水电站为/r/nXXXX/r/n电站增效扩容改造项目法人的通知"文件,成立了/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造项目法人;/r/n20XX7/r/n月,/r/nXXXX/r/n电站与"XX/r/nXXXX/r/n工程项目管理有限公司"签订了/r/nXXXX/r/n电站增效扩容改造工程建设招标代理合同。/r/n项目/r/n单位涉及到的/r/n国土、林业、旅游、环保等/r/n部门,因为是在原来的基础上进行改造,不需重新办理相关手续,因此/r/n开工条件已基本具备。/r/n2.2/r/n工程施工分标情况及参建单位/r/n2.2.1/r/n施工分标情况/r/n根据增效扩容相关政策文件规定,该项目定为一个单项工程进行招标施工。/r/n2.2.2/r/n参建单位/r/n项目法人:/r/nXXX市XXX镇XXXX/r/n水电站/r/n监理单位:/r/nXXXX/r/n市水利水电工程建设监理有限责任公司/r/n质监单位:/r/nXXX市/r/n水务局水利工程建设质量监督站/r/n安监单位:/r/nXXX市/r/n水务局安委办/r/n设计单位:/r/nXXXX/r/n市水利水电勘测设计院/r/n施工单位:/r/nXX/r/nXXXX/r/n水电设备制造有限公司/r/n运管单位:/r/nXXX市XXX镇XXXX/r/n水电站/r/n2.3/r/n工程开工报告及批复/r/nXXXX/r/n电站增效扩容改造工程/r/n项目从/r/n20XX/r/n6/r/n月启动以来,/r/n只有少部分的土建工程,主要是以机电设备更新改造为主,因此相关手续不需重新办理。/r/n20XX1/r/n0/r/n月/r/n在/r/n具备开工条件的情况下,项目建设办公室/r/n向/r/nXXX市/r/n水务局申请办理了/r/n"/r/nXX省水利工程开工备案表/r/n",20XX1/r/n1/r/n月,施工方开始进驻施工工地,/r/n201/r/n5/r/n年/r/n1/r/n月/r/n25/r/n日,/r/nXXXX/r/n电站增效扩容改造/r/n项目监理部下达开工令。/r/n2.4/r/n主要工程开完工日期/r/nXXXX/r/n电站增效扩容改造项目/r/n启动/r/n后/r/n,/r/n引水坝、导水槽及机房的装修从20XX11月开始施工,2015年2月完工;机电设备安装从2015年7月开始进行,至2015年12月/r/n机电安装、调试完成。/r/n2.5/r/n主要工程施工过程/r/nXXXX/r/n电站增效扩容改造项目/r/n开工以来,/r/n历时14个月,因为考虑到不浪费水源,只能在枯水期和停发电时节施工/r/n。/r/n主要施工的内容有:引水坝和导水槽的清淤堵漏;机房基座处理和尾水桶的改造;机房美化装修;3台发电机组安装调试;升压站改造;闸门和拦污栅施工改造等建设内容。/r/n2.6/r/n主要设计变更和工程量变化/r/n工程施工中,/r/n因准备工作充分,没有发生设计变更事宜。/r/n2.7/r/n重大技术问题处理/r/n因设计单位在设计阶段对工程设计进行了充分论证,施工单位进行了充分的准备,在项目部和监理现场的精心组织和安排下,工程施工按设计要求顺利进行,没出现重大技术问题。/r/n2.8/r/n施工期防汛度汛/r/n防汛度汛是水管部门天大的事情,虽然/r/n该项目/r/n无大的水利枢纽,但是作好防汛度汛工作是保证工程建设顺利进行的前提和保障,在整个施工期,制订了完善的防汛预案、落实各种防汛措施,做到有备无患。/r/n./r/n./r/n3/r/n专项工程和工作/r/n3.1/r/n征地补偿和移民安置/r/n本项目没有/r/n征地和/r/n移民问题。/r/n3.2/r/n环境保护工程/r/n遵照《建设项目环境保护设计规定》等国家有关法律法规的要求,施工过程中对废水进行了有效处理,尽量防止空气污染和噪音污染,对污染源进行了控制,施工人员生活垃圾也进行了处理。工程实施以后能够改造项目区环境状况,将在发电、改善项目区/r/n卫生等/r/n方面发挥良好作用。/r/n3.3/r/n水土保持设施/r/n本工程项目建设区扰动地表植被和土壤的地方主要包括料场、弃渣场,因施工场地全部位于/r/nXXXX/r/n电站增效扩容项目区内/r/n,/r/n只有少部分的河道沉积物、垃圾和凿除的砼块,/r/n对环境影响较小,但是也采取了/r/n相关措施,废弃物指定专门的堆放场地,河道沉积物和垃圾,风干后进行了处理,没有发生/r/n水土流失/r/n现象/r/n。/r/n3.4/r/n工程建设档案/r/n为了加强档案工作的系统化、规范化、标准化管理,提高管理水平,强化管理职能,/r/n该/r/n项目办公室根据《档案法》,按照水利部《水利工程建设项目档案管理规定》〔水办/r/n[2005]480/r/n号要求,本项目工程档案建立了分类方案、归档范围、保管期限的/r/n"/r/n三合一/r/n"/r/n制度,配备了档案管理兼职人员,设立了专门的档案柜,确保工程档案管理的规范化。/r/n截至/r/n201/r/n6/r/n年/r/n7/r/n月,完成了工程涉及的各门类档案资料的归档任务,对工程建设过程中形成的文字、图表、声像、光盘等不同形式、不同载体的档案资料,按照档案规范要求进行了分类、归档和管理。/r/nXXXX/r/n电站增效扩容改造/r/n工程项目共形成档案文字资料/r/n22/r/n卷,其中综合类/r/n5/r/n卷,建设管理类/r/n9/r/n卷,设计类/r/n4/r/n卷,施工类/r/n3/r/n卷,监理类/r/n1/r/n卷;竣工图/r/n15/r/n张,照片/r/n45/r/n张。/r/n./r/n./r/n4/r/n项目管理/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造工程/r/n建设管理机构和职能设置遵循国家基本建设总体要求,严格执行/r/n《水电水利工程项目建设管理规范》〔DLT5432-2009、《小型水电站建设工程验收规程》〔SL168-2012、《水利水电工程施工质量检验与评定规程》〔SL176-2007等文件要求,/r/n项目建设实行项目法人负责制、招标投标制、建设监理制和合同管理制等各项制度。/r/n4.1/r/n机构设置及工作情况/r/n4.1.1/r/n项目法人/r/n项目法人:/r/nXXX市XXX镇XXXX/r/n水电站/r/n。/r/n按照建设管理办法要求,在项目建设刚刚进入实施阶段前,/r/n20XX/r/n6/r/n月,/r/n成立了/r/nXXX市/r/n农村水电增效扩容改造工作领导小组,市政府办、市财政局、市水务局相关人员为成员组成。/r/n20XX6/r/n月/r/n16/r/n日,/r/nXXX镇/r/n人民政府以"石政发/r/n[2014]40/r/n号文关于明确/r/nXXX市XXX镇XXXX/r/n水电站为/r/nXXXX/r/n电站增效扩容改造项目法人的通知"文件,成立了/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造项目法人,项目法人代表/r/nXXXX/r/n。/r/n按照/r/n《水电水利工程项目建设管理规范》/r/n规定的职责范围开展建设管理工作,制订了《项目法人职责》、《技术负责人职责》、《财务管理制度》、《质量管理制度》、《工程结算管理制度》、《安全管理制度》和《施工安全管理措施》。/r/nXXXX/r/n电站增效扩容/r/n改造工程/r/n项目下设综合组、/r/n计划财务组、工程/r/n技术组、/r/n质量监督组、安全管理组。各组/r/n主要职责为:落实工程建设计划和资金,负责对工程计划、质量、进度、资金等进行管理、检查和监督,负责协调项目的外部关系。/r/n建设期间/r/n,项目法人加强领导,各组分工明确,照章办事,较好地完成了/r/nXXXX/r/n电站增效扩容/r/n改造/r/n工程建设管理工作。/r/n4.1.2/r/n设计单位/r/n设计单位:/r/nXXXX/r/n市水利水电勘测设计院。/r/nXXXX/r/n市水利水电勘测设计院于/r/n20XX/r/n7/r/n月先后完成了《XX省/r/nXXX市XXX镇XXXX/r/n水电站/r/n增效扩容改造/r/n工程初步设计报告》、《XX省/r/nXXX市XXX镇XXXX/r/n水电站/r/n增效扩容改造/r/n工程初步设计概算》、《XX省/r/nXXX市XXX镇XXXX/r/n水电站/r/n增效扩容改造/r/n工程初步设计图册》的审查审定。/r/n施工期间设计人员进驻施工工地了解工程建设情况,进行设计交底,解决施工过程中遇见的技术问题。针对实际情况及时进行设计变更,工程完工后参与工程各项验收,较好的完成了设计工作,保障了工程质量,为工程的顺利进行发挥了重要的作用。/r/n4.1.3/r/n监理单位/r/n监理单位:/r/nXXXX/r/n市水利水电工程建设监理有限公司/r/n。/r/n根据工作需要,该公司严格按照有关规定,编制了各项监理规划、监理实施细则。开工前认真审批施工组织设计方案,修改不合理的施工方案;对工程实施全工程监理,并参与了各分部工程验收。由于监理处认真履行其工作职责,对工程进度、质量、投资进行了有效的控制。/r/n4.1.4/r/n施工单位/r/nXXXX/r/n电站增效扩容改造工程项目/r/n,/r/n主要/r/n施工单位/r/n为中标单位/r/n——/r/nXX/r/nXXXX/r/n水电设备制造有限公司。/r/n中标单位在施工过程中/r/n建立了规范的质量保证体系,牢固树立/r/n"/r/n百年大计、质量第一/r/n"/r/n的质量意识,精心组织,科学施工,克服诸多不利因素,高效、圆满地完成了施工建设任务。/r/n施工单位的具体作法是:/r/n<1>、建立了以项目经理为第一责任人的各岗位责任制;/r/n<2>、建立健全质量安全体系,实行了以施工质量、进度、安全为主体的分配机制;/r/n<3>、明确了现场责任区域,实现了目标管理制度;/r/n<4>、项目部及时召开班组长情况讨论会,解决疑难问题/r/n;/r/n〔/r/n5/r/n及时协调与地方的关系,做到文明施工。/r/n4.1.5/r/n质量监督单位/r/n本工程的质监单位是:/r/nXXX市/r/n水务局水利工程建设质量监督站/r/n。/r/n本工程的质量监督由/r/nXXX市/r/n水务局水利工程建设质量监督站/r/n承担,根据国家有关规定及规范要求,在整个项目实施过程中/r/nXXX市/r/n水务局水利工程建设质量监督站/r/n行使质量监督权。在本单位工程的质量监督过程中,质监站对工程项目划分进行了审批,对施工过程进行了全程跟踪监督检查,不定时抽检并参加了重要隐蔽工程和分部工程验收,外观质量评定,为确保工程质量发挥了不可替代的作用。/r/n4.1.6/r/n地方政府/r/n地方政府:/r/nXXX市/r/n人民政府。/r/n20XX/r/n6/r/n月,/r/nXXX市/r/n人民政府/r/n以/r/n市/r/n政府/r/n、财政、水务等相关部门成立了"/r/nXXX市/r/n农村水电增效扩容改造工作领导小组/r/n",负责领导/r/n该/r/n项目建设、筹措配套资金、协调交通、通讯、林木砍伐以及周边治安环境、防汛度汛、安全文明施工等方面为工程排忧解难。/r/n4.2/r/n主要项目招标投标过程/r/nXXX市XXX镇XXXX/r/n水电站增效扩容改造工程/r/n,/r/n20XX7/r/n月,/r/nXXXX/r/n电站与"XX/r/nXXXX/r/n工程项目管理有限公司"签订了/r/nXXXX/r/n电站增效扩容改造工程建设招标代理合同;/r/n20XX7/r/n月/r/n15/r/n日,/r/nXXXX/r/n电站与"/r/nXXXX/r/n市水利水电工程项目招标投标领导小组办公室"进行了招投标备案登记;/r/n20XX9/r/n月/r/n3/r/n日,电站增效扩容改造工程项目进行了开标、评标工作/r/n。/r/n评标委员会组成成员见/r/n下/r/n表。/r/n评标委员会组成人员详表/r/n姓名/r/n职称/r/n评标专业/r/n工作单位/r/n招标人代表/r/nXXXX/r/n工程师/r/n水工/r/nXXX市XXXX/r/n电站/r/n专家库抽取评标专家/r/n工程师/r/n机电/r/nXXXX/r/n市经开区/r/n高级工程师/r/n电气/r/n涟钢设计院/r/n教授/r/n电气/r/nXXXX/r/n职院/r/n工程师/r/n水工/r/nXXXX/r/n市水利局/r/n投标单位和评标结果详细情况见/r/n下/r/n表。/r/n投标单位和评标结果一览表/r/n序号/r/n投标人名称/r/n资质/r/n投标报价〔万元/r/n综合/r/n评分/r/n结果/r/n排序/r/n推荐中标/r/n候选人/r/n1/r/nXX省莲花水轮机厂有限公司/r/n98.68/r/n87.79/r/n2/r/n√/r/n2/r/nXX天成机电设备制造有限公司/r/n92.77/r/n82.79/r/n3/r/n3/r/nXX/r/nXXXX/r/n水电设备制造有限公司/r/n108.52/r/n95.26/r/n1/r/n√/r/n20XX/r/n9/r/n月/r/n15/r/n日,确定"XX/r/nXXXX/r/n水电设备制造有限公司"为/r/nXXXX/r/n电站改造项目中标单位;/r/n20XX10/r/n月/r/n15/r/n日,/r/nXXXX/r/n电站与"XX/r/nXXXX/r/n水电设备制造有限公司"根据相关法律法规和本项目招标文件规定,签订了电站增效扩容改造工程合同协议书,合同总价款7/r/n5/r/n.5万元。/r/n4.3/r/n工程概算与投资计划/r/n4.3.1/r/n批准概算与实际执行情况/r/n20XX12/r/n月/r/n6/r/n日,/r/nXXX市/r/n水务局以"/r/nXXXX/r/n[2012]103/r/n号文关于对《/r/nXXXX/r/n电站增效扩容改造工程初步设计报告》的批复"文件,/r/n对项目初步设计进行了评审批复,/r/n确定总投资175.79万元/r/n。/r/n完成投资具体情况是/r/n:/r/n完成总投资为:/r/n107.0758万/r/n元;/r/n其中:土建部分5/r/n./r/n761/r/n4万/r/n元;/r/n机电设备94/r/n./r/n802/r/n8万/r/n元;/r/n金属结构2/r/n./r/n5883/r/n万/r/n元;/r/n其他3/r/n./r/n9233/r/n万/r/n元;/r/n4.3.2/r/n投资来源、投资到位及完成情况:/r/n截止到/r/n201/r/n6/r/n年/r/n3/r/n月3/r/n1/r/n日,/r/nXXXX/r/n电站增效扩容改造/r/n工程项目累计到位资金/r/n112.6/r/n513/r/n万元。其中中央投资/r/n47/r/n万元,省级配套/r/n1/r/n0/r/n万元,/r/n地方政府配套36.6/r/n513/r/n万元,项目单位/r/n自筹/r/n19/r/n万元/r/n。/r/n./r/n./r/n4.4/r/n合同管理/r/n项目办始终将合同管理作为项目管理的重要内容,均以合同形式明确甲乙双方的权利和义务。为确保工程质量,加强合同管理,规范操作、明确双方的义务和责任,项目办公室与施工单位签订了施工合同,施工合同类型有总价承包合同,也有单价承包合同。与设计单位和监理单位签订的工程勘测设计合同和工程建设监理合同均为总价承包合同。合同签订后,合同双方严格按合同条款约束自己行为,认真履行责任和义务,各项合同目标圆满实现,在所有合同执行中未出现任何合同纠纷和合同违约现象。/r/n4.5/r/n材料及设备供应/r/n根据施工合同规定,为完成本合同内容需采购的水泥、砂、碎石、块石、监测仪器等设备,均由施工承包人自行采购供应,其质量必须满足合同规定的要求,并经监理工程师抽检合格后用于本工程,工程完工后做到工完料清。/r/n本单位工程所用汽油、柴油和主要设备:挖掘机、拌和机、振捣器、钢筋弯曲机、钢筋切断机、钢筋调直机、电焊机、机动翻斗车等均由施工单位自购;电力供应主要采取就近搭接农网及由电站直供相结合的方式解决。/r/n4.6/r/n资金管理与合同价款结算/r/n在资金管理方面:项目机构设立专门财务,实行专户、专账、专人管理,建立了严格的资金使用审批制度和严密的资金支付程序,严格依合同办事,规范建设资金的使用,确保了资金安全。/r/n合同价款结算方面:坚持资金使用层层审核,多级把关,工程款的支付实行四级把关,即首先由施工方提出申请,现场监理审核签字,再提交总监审核签字;然后报项目办复审签字;最后由项目法人代表终审签字支付,实行谁审核谁负责的管理制度。/r/n在上级有关部门的关心支持下,加固工程资金到位及时,为工程建设顺利进行提供了重要保障。同时在工程建设过程中,从未发生过因工程款支付延误引起承包商索赔的情况,工程款项都按合同规定的时间支付。/r/n./r/nPAGE/r/n./r/n5/r/n工程质量/r/n5.1/r/n工程质量管理体系和质量监督/r/n在项目整个实施过程中,始终贯彻/r/n"/r/n项目法人负总责,设计单位督促,监理单位控制,施工单位保证、政府部门监督/r/n"/r/n的质量保证体系。/r/n5.1.1/r/n项目法人质量管理/r/n建设单位设有质量专管机构,由技术负责人负责,建设单位的质量监督员与监理工程师、监理员一起全过程监督承包商的工作人员、施工设备、使用材料、工艺方法,施工环境及时制止不按规定的行为,避免发生工程质量事故。/r/n在工程建设过程中遇到技术问题,根据具体情况,及时召集各方联席会议,统一认识,群策群力,以设计为主研究有效解决办法,最后通过设计修改,交由监理和施工单位执行,保证工程的安全与完善;加强检验工作,督促监理要求施工单位将各种材料送指定部门进行核验;督促严格按规程规范验收核查各单元工程。/r/n5.1.2/r/n设计单位质量管理/r/n设计单位在设计文件的编制过程中,严格按照/r/nIS09001/r/n质量保证体系运作,各相关专业根据工作大纲明确本专业的工作任务和控制进度,针对具体任务制定详细的质量要求,严格审核制度,确保设计成果。设计单位虽然派遣现场设计代表,当施工中出现设计不明或需要变更时及时解决施工中出现的问题,确保了设计与施工的有机结合。/r/n5.1.3/r/n监理单位质量管理/r/n监理单位由总监〔副总监、监理工程师、监理员组成。/r/n监理单位在工程开工前,认真编制了监理规划、监理实施细则,明确质量控制程序和方法,及时进行项目划分并报质量监督站核定。在审查施工单位上报的施工组织设计的基础上,重点就质量保证体系的组织机构、人员资质进行审查,确定合理的施工程序与施工方法。在施工过程中,严把每道工序的质量关。监理单位实行了施工全过程的旁站监理。坚持每道工序首先由施工单位自检,监理抽检,抽检不合格的,及时纠正。上一道工序未经检查验收前不准下一道工序施工。所有工程原材料成品、半成品必须经取样试验并经监理工程师检查合格后方准使用。/r/n5.1.4/r/n施工单位质量管理/r/n施工单位设有专管机构质检部,都制定了严格的质量保证技术措施和质量保证组织措施。对资源配置和实施操作进行全方位、全过程的质量控制。/r/n施工单位严格质量控制,做到事前控制与过程控制、事后控制。/r/n事前控制:控制重点时作好施工准备工作,且施工准备工作贯穿于施工的全过程中。/r/n过程控制:全面控制施工过程,重点控制工序质量。/r/n事后控制:按国家有关的质量评定标准和办法,对完成的单项工程及时进行检查、验收。/r/n施工单位为确保工程质量制定了严格的检查与管理制度。实行/r/n"/r/n班组自检、施工队复检、项目部质安部终检/r/n"/r/n的/r/n"/r/n三检制/r/n"/r/n,并向监理工程师负责;持证上岗,执行质量一票否决制,质安部对质量管理有一票否决权,坚持上道工序不合格不准进入下道工序施工,单项工程不合格不验收签证;坚持技术交底制度;执行质量奖惩制度。由于施工单位严格了上述措施,工程质量从而得到了保证。/r/n5.1.5/r/n工程质量监督管理/r/n本工程由/r/nXXX市/r/n水务局水利工程建设质量监督站/r/n负责监督。质监单位负责监察督促建设、监理、设计、施工单位建立健全质量管理体系;按照相关法规、技术标准和设计文件实施工程质量监督,对施工现场影响工程质量的行为进行监督整改。/r/n一是严格要求施工单位按施工工序施工,施工工序由监理单位按设计要求进行监督和验收,每道工序合格后方可进入下一工序施工。/r/n二是项目部工程技术人员常年驻扎工地,每天都到施工现场检查工作和了解情况,在施工的重要工序和重要环节上派员参与旁站,掌握工程建设动态变化,及时发现问题,提出处理意见,并协调有关事宜。/r/n三是在工程建设中遇有突发性技术问题,根据具体情况,及时召集施工、监理、设计和质监部门举行会议,统一认识,群策群力,以设计为主研究有效解决办法,并按照程序通过设计修改,交由监理和施工单位执行,保证工程的安全和完善。/r/n四是对施工单位采购的各种原材料和中间产品及时督促监理部门进行抽样检查,并送交有关部门进行核检。/r/n五是每一单元工程完工后即督促有关部门严格按规程规范进行单元工程验收,同时核查各单元工程的质量情况。/r/n5.2/r/n工程项目划分/r/n在/r/nXXXX/r/n电站增效扩容改造/r/n工程项目实施过程中,/r/nXXX市/r/n水务局水利工程建设质量监督站/r/n对沙河小水电代燃料工程项目划分进行了确认,该项目共划分/r/n1/r/n个
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 棋谱仓库文员培训总结
- 三违安全知识培训
- 新生儿红臀的预防与护理常规考核试题
- 城市交通规划合同终止咨询重点基础知识点
- 轧钢厂租赁合同协议
- 辅导机构学员协议合同
- 暂时离职协议书
- 智联招聘协议书
- 健康养生服务提供协议
- 智力障碍协议书
- 膝关节体格检查
- 《小学生新能源科普》
- 义务教育(新课标)初中物理实验目录
- 人民币教具正反面完美打印版
- 国际投标条款
- 6.1 根结、标本的上下关系
- GB/T 13928-2002微型往复活塞空气压缩机
- GB/T 12224-2005钢制阀门一般要求
- GB/T 11022-2020高压交流开关设备和控制设备标准的共用技术要求
- GA/T 1073-2013生物样品血液、尿液中乙醇、甲醇、正丙醇、乙醛、丙酮、异丙醇和正丁醇的顶空-气相色谱检验方法
- 象鼻岭无盖重固结灌浆试验大纲修定稿
评论
0/150
提交评论