版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
设计说明说给水管网的设计与计算1、用水量的计算:用水量变化曲线如图:通过所给定的地形图,用水量指标,根据地均法:(1)最高日供水量:Qd=∑qiAi=120920.444m³/dKh=24×5.92/100=1.42(2)最高时供水量:Qh=Qd·1.42/86.4=1987.35L/S(3)供水泵站的流量为:Qd×4.97%×1000÷3600=1669.374L/s水塔的供水流量为:Qd×(5.92%-4.97%)×1000÷3600=319.096L/s(4)清水池、水塔的调节容积计算:清水池与水塔调节容积计算表小时给水处理供水量(%))供水泵站供水水量(%)清水池调节容容积计算(%)水塔调节容积积计算(%%)设置水塔不设水塔设置水塔不设水塔(1)(2)(3)(4)(2)-(33)∑(2)-(44)∑(3)-(44)∑0~14.172.221.921.951.952.252.250.300.301~24.172.221.701.953.902.474.720.520.822~34.162.221.771.945.842.397.110.451.273~44.172.222.451.957.791.728.83-0.231.044~54.172.222.871.959.741.3010.13-0.650.395~64.164.973.95-0.818.930.2110.341.021.416~74.174.974.11-0.808.130.0610.400.862.277~84.174.974.81-0.807.33-0.649.760.162.438~94.164.975.92-0.816.52-1.768.00-0.951.489~104.174.965.47-0.795.73-1.306.70-0.510.9710~114.174.975.40-0.804.93-1.235.47-0.430.5411~124.164.975.66-0.814.12-1.503.97-0.69-0.1512~134.174.975.08-0.803.32-0.913.06-0.11-0.2613~144.174.974.81-0.802.52-0.642.420.16-0.1014~154.164.964.62-0.801.72-0.461.960.340.2415~164.174.975.24-0.800.92-1.070.89-0.27-0.0316~174.174.975.57-0.800.12-1.40-0.51-0.60-0.6317~184.164.975.63-0.81-0.69-1.47-1.98-0.66-1.2918~194.174.965.28-0.79-1.48-1.11-3.09-0.32-1.6119~204.174.975.14-0.80-2.28-0.97-4.06-0.17-1.7820~214.164.974.11-0.81-3.090.05-4.010.86-0.9221~224.174.973.65-0.80-3.890.52-3.491.320.4022~234.172.222.831.95-1.941.34-2.15-0.61-0.2123~244.162.222.011.940.002.150.000.210.00累计100100100调节容积=113.63调节容积=114.466调节容积=44.21清水池的调节容积:W1=13.63%·Qd=16481.457m³W2=25×2×3600÷1000=180m³W3=6.5%·Qd=7859.829m³W4=5%·Qd=6046.002m³清水池设计有效容积:W=W1+W2+W3+W4=30567.308m³水塔的调节容积:W1=4.21%·Qd=5090.751m³W2=15×10×60÷1000=9m³水塔设计有效容积:W=W1+W2=5099.751m³2、管道定线:根据所给某市B区城市总体规划图进行管道定线,沿人行道,绿地和慢车道布置管道,尽量避免快车道,管道布置成环状,在离水厂较远处设水塔。3、计算Qj比流量:ql=(Qh-∑qni)/∑Ai=0.00034L/s·㎡最高时管段沿线流量分配与节点设计流量计算节点编号集中流量(LL/S)供水流量L//s沿线流量节点流量L//s10-1669..3740-1669..374190.32524.813325.1388270.00038.9938.9900797.513336.3399133.855280.000-319.00960-319.00961169.108837.5866107.7224200.23569.142269.37773069.315527.0296.33556104.755038.1222142.87721284.589933.6644119.26631968.717751.8322120.54493147.141131.938879.07995121.211948.5566169.77751384.964432.3111117.277518101.511424.3222125.8336281.671114.084495.7555365.121115.847781.9711472.366637.2055109.57711494.187725.7288119.91151781.814420.6366102.4550280.0008.2898.289260.00016.753316.753390.00012.234412.2344100.00010.068810.0688220.00016.437716.4377210.00021.391121.3911230.00014.643314.6433240.0004.3054.305250.0005.2395.239320.0001.0811.081330.0003.9513.951340.0006.0796.079150.0006.1486.148160.0006.1486.148合计0.0224、管段流量处分配qi:(1)管段的设计流量分配:如图38.9938.99(2)管段直径的设计:某城市B区管网设计数据管段编号设计流量L//s经济流速m//s计算管径mmm设计管径mmm11669.33742.5922.3000800×22960.4112.4713.9883423874.48882.37685.59957004378.13341.2633.57747005215.40020.86564.8660600614.44330.3247.64473007319.09960.97647.3551600×2812.23440.3227.9223200910.06880.2253.23342501016.08220.35241.93363001170.22330.5422.988045012122.31190.7471.8006450136.1480.2197.8887200146.1480.2197.88872001518.48550.4242.63302501638.56770.4350.4664350176.4940.2203.37792501821.39110.3301.38843001916.43770.3264.19902502014.64330.3249.3556250214.3050.2165.5991200225.2310.2117875330.34250.5337250248.2890.27197.75582002570.710.5424.44444502614.96770.3252.099930027202.42210.82560.777260028100.71110.7428.100940029104.13370.7435.333045030110.15540.72441.466845031168.24410.8517.599050032103.11190.7433.199745033310.62261629.044870034221.32230.86572.577160035215.40020.86564.866055036150.22230.78495.322050037612.12281.7677.277070038380.3661.2635.433665039132.32220.8459.0225450401.0810.282.9788150413.9510.2158.6337150426.0790.2196.7773200(3)设计工况水力分析:为了满足水力分析前提条件,将管段[1]暂时删除,其管段流量并到节点(2)上得Q2=-1669.374+95.755=-1573.619L/s,同时,假定节点(20)为控制点,其节点水头等于服务水头,即H20=31.00m,用哈代-克罗斯平差;哈代-克罗斯平差平差次数:11管道粗糙系数:0.014水损闭合差:0.01小数位数:3管段号管长m管径mm流量L/s小环号大环号摩阻系数水头损失m流速M/SS1Q1值2489700-837.5504-706.603-4.6311-2.17665.533656700-751.5582-708.858-5.0044-1.95336.6574941700-264.5546-7812.7066-0.8899-0.68773.3615842600-183.557-4525.8566-0.8711-0.64994.7466759300-18.9555-12937.5226-0.3377-0.268817.7711108053002.896-23994.34460.0080.0412.8811837450-72.9774-56119.0997-0.6344-0.45998.69112936450-117.1189-89133.1884-1.8299-0.737715.608815933250-14.2997-903045.5506-0.6233-0.291143.541116823350-34.9336-60447.0008-0.5466-0.363315.617717873250-13.0777-302849.6653-0.4877-0.266637.26552557720016.1722106187.00551.6180.515100.05562663845078.59331090.78110.5610.4947.13527805600214.81162024.721.1410.765.312859840094.128830159.41111.4120.74915.005529709450112.02210100.88841.2660.70411.3011301199450-134.9983-14170.6006-3.1099-0.849923.029931748500-156.7726-2560.7-1.4911-0.79889.51332502450-113.3333-3671.43-0.9177-0.71338.09533789700343.33384010.65441.2560.8923.658341174600-311.5517-4736.0511-3.4999-1.102211.231135707550-223.884-5834.5211-1.73-0.94227.72736512500-155.991-6841.5499-1.01-0.79446.47837963700735.03347013.00337.0251.919.55838654650-371.0042-8013.1088-1.8055-1.11884.86439517450-128.1134-9073.5644-1.2088-0.80669.426各环的信息如下:环号 水损闭合差 S|Q|的和 本环校正流量[L/S]第1环:-0.001 159.292 0.002第2环:-0.005 35.474 0.071第3环:-0.001 63.245 0.006第4环:-0.005 42.664 0.063第6环:-0.004 38.881 0.05第7环:0 36.337 0.005第8环:-0.005 38.038 0.064第9环:-0.001 68.575 0.009设计工况水力分析结果管段或节点编编号管内流量L//s管内流速m//s管段压降m节点水头m地面标高m自由水压m2960.40052.1764.63145.2799342.27993874.48831.9535.00440.6488337.64884378.19930.6870.88935.6444332.64445215.36650.6490.87134.7555331.7555614.51220.2680.33733.8899330.88997319.09960.860.40633.5533330.5533812.23440.30.12833.9599330.9599910.06880.20.03633.4255330.42551016.01770.0410.00832.3766329.37661170.24770.4590.63432.4122329.412212122.26640.7371.82931.3766328.3766136.1480.20.07532.01329.01146.1480.20.09233.8399330.83991518.47660.2910.62333.7644330.76441638.51770.3630.54632.5399329.5399176.4880.2660.48732.6311329.63111821.39110.30.08632.0088329.00881916.43770.30.09331.4622328.46222014.64330.30.0965531328214.3050.20.0297730.9144327.9144225.2310.210.0401130.9077327.90772316.75330.340.0939931.36555328.36555248.2890.270.07331.97883328.978832570.71220.5151.61832.59009329.590092614.96990.4940.56134.02001331.0200127202.49920.761.14134.1144331.114428100.71170.7491.41235.6599332.659929104.13390.7041.26635.7322332.732230110.21150.8493.10936.9988333.998831168.19960.7981.49138.2544335.254432103.16630.7130.91745.26552342.2655233310.68890.8921.25640.4799337.479934221.26651.1023.49935.56993332.5699335215.4440.9421.73-3-36150.23370.7941.01-3-37612.13331.917.025-3-38380.29961.1181.805-3-39132.31130.8061.208-3-401.0810.20.01388-3-413.9510.20.169-3-426.0790.20.07477-3-(4)确定控制点在水力分析时,假定节点(20)为控制点,经过水力分析后,比较节点水头和服务水头,节点(20)是真正的控制点,不需要调整节点水头,过程见表:节点编号节点水头m服务水头m供压差额m自由水压m245.279931-14.277945.2799340.648831-9.648840.6488435.644431-4.644435.6444534.755531-3.755534.7555633.889931-2.889933.8899733.5533--30.5533833.959931-2.959933.95991132.412231-1.412229.41221231.376631-0.376628.37661332.0131-1.0129.011433.839931-2.839930.83991821.8399319.16121.8399198.8393122.16118.8392031310312734.114431-3.114434.11442935.732231-4.732235.73223036.998831-5.998836.99883138.254431-7.254438.25445、供水泵站扬程,水塔高度的计算及选泵;①泵站扬程:hp1=(H1-Z1)+10.67×(q1/2)1.852l1/CW1.852D14.87=(44.269-3)+10.67×(1.669374/2)1.852L1/1101.8520.84.87=42.807m为了选泵,估计泵站内部水头损失,一般水泵吸压水管道设计流速为1.2~2.0m/s,局部阻力系数按5.0~8.0考虑,沿程水头损失较小,可忽略不计,则泵站内部水头损失约为:hp1=8.0×2.02/2/9.81=1.63m则泵站的扬程应为:hp=42.807+1.63=44.437m按两台泵并联工作考虑,单台泵流量为:Qp=1669.374÷2=834.687L/s=3004.109(t/h)取3000(t/h)查水泵样本,选取28SA-10B型水泵三台,2台工作,一台备用②水塔高度Ht8=H8-Z8=33.959m-3m=30.959m结果标于图中:38.9938.996、消防工况校核:本管网消防按同时一处火灾考虑,认为火灾发生在控制点处,在控制点(20)节点流量加上15L/S,确定节点(29)加上10L/s,消防流量从水厂流出,经管段[1]、[2]、[3]、[38]、[39]、[15]、[16]、[17]流到节点(20),每个管段流量加上15L/s,经管段[37]、[33]、[29],每个管段流量加上15L/s,流量分配如图:38.9938.99消防流量分配图进行工况水力分析,结果如下:设计工况水力分析计算结果管段号管长[M]管径[MM]]流量[L/SS]小号侧大号侧摩阻系数水头损失[MM]流速[M/SS]S|Q|值2489700-848.8842-706.603-4.7588-2.20665.6053656700-762.992-708.858-5.1566-1.98226.7584941700-272.3368-7812.7066-0.9433-0.70883.4615842600-189.9936-4525.8566-0.9333-0.67224.9116759300-21.6664-12937.5226-0.44-0.306620.3110805300-5.54-23994.3446-0.0311-0.07885.50911837450-77.6995-56119.0997-0.7199-0.48999.25312936450-119.9906-89133.1884-1.9155-0.754415.969915933250-15.0997-903045.5506-0.6944-0.308845.977716823350-38.177-60447.0008-0.6511-0.397717.062217873250-17.2999-302849.6653-0.8533-0.352249.29772557720015.8055106187.00551.5450.50397.78552663845078.22661090.78110.5560.4927.10127805600217.15572024.721.1660.7685.36828598400104.900630159.41111.7540.83516.723329709450121.655310100.88841.4930.76512.2733301199450-136.0029-14170.6006-3.1577-0.855523.207731748500-161.4429-2560.7-1.5822-0.82229.79932502450-114.3321-3671.43-0.9344-0.71998.16633789700354.01174010.65441.3350.923.772341174600-314.55-4736.0511-3.5666-1.112211.338835707550-228.2279-5834.5211-1.7999-0.96117.8836512500-155.6628-6841.5499-1.0066-0.79336.46637963700748.69967013.00337.2891.9459.73538654650-374.5558-8013.1088-1.8399-1.12994.9139517450-128.9934-9073.5644-1.2233-0.81119.485灭火处节点服务水头按低压消防考虑,即10m的自由水压,通过平差后的管段压降,可以从水厂的节点水头,得到控制点的节点水头为42.447m,减去地面标高3m,结果为39.447m,大于10m,节点(29)的节点水头为47.289m,减去地面标高3m,结果为44.289m,大于10m,满足要求;消防校核结果结果如图:38.9938.997、事故工况校核:(1)把事故管段从管网中删除,调低节点流量,即:事故工况各节点流量=事故工况供水比例(我国规定70%)×最高时工况各节点流量(2)重新分配管段流量(3)平差结果及节点水头比较:管段号管长[M]管径[MM]]流量[L/SS]小号侧大号侧摩阻系数水头损失[MM]节点水头m2489700-798.8814-706.6034.21347.84883656700-738.6669-708.8584.83343.63554941700-367.8874-7812.70661.7238.80225842600-3.5422-4525.8566037.08226759300-20.1554-12937.52260.38137.082210805300-6.1488-23994.34460.03836.006611837450-47.6775-56119.09970.27136.206612936450-105.6614-89133.18841.48636.244415933250-16.2996-903045.55060.80937.401116823350-29.3662-60447.00080.38536.934417873250-10.2557-302849.66530.337.02552557720038.8511106187.00552.33937.0126638450-0.16991090.7811032.006627805600141.09932024.720.49232.17772859840064.787730159.41110.66934.23772970945062.2510100.88840.39134.5166301199450-234.1111-14170.60069.35134.907731748500-117.4487-2560.70.83836.317732502450-75.5229-3671.430.40745.245533789700363.79944010.65441.4141.9866341174600-546.4452-4736.05110.76538.487735707550-128.3318-5834.52110.56836512500-84.1774-6841.54990.29438654650-289.5598-8013.10881.09939517450-95.9882-9073.56440.678通过平差以及计算后的不在环内管段的压降,可计算出每个节点的水头损失都大于服务水头31m,满足要求;结果标于图中:8、转输工况校核:(1)最大转输时各节点流量Q转j=Qj×3.65/5.92(2)将第一次平差后的管段流量也同样乘以3.65除以5.92(3)将最大转输量加到水厂到水塔的一条干管上,Q输=泵站供水量-用户用水量=Qd×4.97%-Qd×3.65%=443.375L/s路线为[1],[2],[3],[4],[5],[6],[7],进行平差平差结果为::管段号管长m管径mm流量L/s小环号大环号摩阻系数水头损失m流速M/SS1Q1值2489700-634.5529-706.603-2.6599-1.64994.193656700-569.4437-708.858-2.8722-1.485.0444941700-200.3311-7812.7066-0.51-0.522.5455842600-139.0044-4525.8566-0.5-0.49223.5956759300-14.2336-12937.5226-0.19-0.201113.3466108053002.063-23994.34460.0040.0292.05211837450-55.3115-56119.0997-0.3644-0.34886.58812936450-88.8996-89133.1884-1.0522-0.559911.839915933250-10.8775-903045.5506-0.36-0.222233.1216823350-26.5997-60447.0008-0.3166-0.276611.889917873250-9.9366-302849.6653-0.2811-0.202228.31332557720012.2177106187.00550.9230.38975.58882663845059.50551090.78110.3210.3745.40227805600162.5882024.720.6530.5754.0192859840071.2830159.41110.810.56711.36332970945084.829910100.88840.7260.5338.558301199450-102.1156-14170.6006-1.78-0.642217.428831748500-118.7728-2560.7-0.8566-0.60557.20732502450-85.7556-3671.43-0.5255-0.53996.12633789700259.96664010.65440.720.6762.77341174600-236.008-4736.0511-2.0099-0.83558.51135707550-169.5579-5834.5211-0.9933-0.71445.85436512500-118.0084-6841.5499-0.5799-0.60114.90637963700556.78877013.00334.0311.4477.2438654650-281.2252-8013.1088-1.0377-0.84883.68739517450-97.1115-9073.5644-0.6944-0.61117.144水厂的节点水水头为H1=48..924mmH7=48..924mm-1.0076-22.6599-2.8872-00.51--0.5--0.199=41.1117mH8=H77-地面标高-水塔高度度=41.1117-3--30.9959=77.1588m由hi=AllQ2A=3.144×D2/4=00.0411Q2=hii/A·LL=518..259LL/s>4443.3375L//s,满足要求求。二、污水管网网的设计与与计算:污水管段设计计流量计算算管段编号居民生活污水水日平均流流量分配管段设计流量量计算本段流量(LL/S)转输流量(LL/s)合计流量(LL/s)总变化系数沿线流量(LL/s)集中流量(LL/s)设计流量(L/s)本段转输1234567891~214.8622-14.86332.00629.8222--29.82227~8------124.4124.48~9------126.5331126.53319~10------143.177143.17710~2------218.1004218.10042~314.693314.862229.55551.86054.9833218.1004273.088711~12------63.134463.134412~13------72.038872.038813~14------135.3666135.366614~15------143.7115143.711515~16------249.6557249.655716~3------340.8448340.84483~4-29.555529.55551.86054.983324.3811558.9552638.31164~511.067729.555540.62221.79672.97331.312583.3333657.611817~18------52.891152.891118~19------120.011120.01119~20------141.7228141.722820~21------291.5337291.533721~22------312.3115312.311522~23------383.699383.69923~5------417.7551417.75515~630.042229.555559.59771.722102.63391001.00841103.7723污水管网主干干管水力计计算表管段编号管段长度L(m)设计流量(LL/s)管径管段坡度I管内流速v(m/s))充满度降落量I·LL(m)h/Dh(m)1234567891~250029.82223000.002440.740.550.1651.27~8355124.46000.0010.670.610.3660.3558~9593126.53316000.0010.680.610.3660.5939~10815143.1776000.0010.70.660.3960.81510~2735218.10047000.0010.780.670.4690.7352~3602273.08878000.000880.760.660.5280.4816611~1233963.13445000.001550.670.680.340.5085512~1360172.03885000.001550.710.530.2650.9015513~14435135.36666000.0010.690.640.3840.43514~15408143.71156000.0010.70.660.3960.40815~16311249.65578000.000880.760.630.5040.2488816~3443340.84489000.000880.810.640.5760.354443~4784638.311611000.000660.840.750.8250.470444~5576657.611811000.000990.810.650.7150.5184417~1837352.89114000.001550.650.620.2480.5595518~19307120.0116000.0010.680.610.3660.30719~20626141.72286000.0010.70.660.3960.62620~21409291.53378000.000880.770.670.5360.3272221~22419312.31159000.000880.810.590.5310.3352222~23358383.6999000.000880.840.660.5940.2864423~5530417.755110000.000660.770.670.670.3185~61751103.772314000.000660.970.70.980.105标高(m)埋设深度地面水面管内底(m)上端上端下端上端下端上端下端1011121314151617332.1650.96520.812.2332.3662.01121.64511.355332.0111.4181.6451.0521.3551.948331.4180.6031.0220.2071.9782.793330.576-0.15990.107-0.62882.8933.628330.8280.346440.3-0.181162.73.18166332.341.8315521.4915511.50855331.831550.931.566550.6651.433552.335330.9490.5140.5650.132.4352.87330.5140.1060.118-0.292.8823.29330.014-0.23448-0.49-0.738883.493.7388833-0.26228-0.61772-0.83888-1.193323.838884.19322330.34344-0.1277-0.48116-0.95223.481663.95233-0.1277-0.64554-0.9522-1.360043.8424.36044332.2481.6885521.4405511.55955331.606551.299551.240550.933551.759552.06655331.299550.673550.903550.277552.096552.72255330.613550.286330.07755-0.249972.922553.24977330.18133-0.15339-0.34997-0.684493.349773.6849933-0.15339-0.44003-0.74779-1.034433.747994.0343333-0.46443-0.78223-1.13443-1.452234.134334.4523333-0.68004-0.78554-1.66004-1.765544.660444.76544三、雨水管网网设计与计计算雨水的的暴雨雨强度中的的系数按照照南京的算算q=167AA1(1+CllgP)//(t1+mt2+b)n=167××16.9962×((1+111.9144lg1))/(10+2tt2+13..228))0.7775=28322.65//(2tt2+23.2228)00.7755雨水干管水力力计算表::设计管段编号号管长L(m)汇水面积F(ha)管内雨水流行行时间(min)单位面积径流流量q0(LL/s·hha)设计流量Q(L/s)管径D(mmm)坡度It2=∑L//VL/v1234567891~259911.607.68148.4991722.44413000.001442~363239.77.685.57100.1993977.77216400.001224~57651609.17148.4992375.77715000.001115~6603449.174.2694.584161.55815000.001116~736271.913.432.0681.855885.22416000.001998~9583708.83148.4991039.44011000.001119~3581148.830.9595.801341.11711000.0019910~1138235.102.45148.4995211.88516000.0039912~133057.505.08148.4991113.66412000.0009913~1442625.35.082.83112.0992835.88412000.0011114~1550548.27.913.1199.274784.88415000.0016615~1641183.211.021.9688.547366.55116400.0017717~1861328.305.13148.4994202.11516400.0022218~1920572.95.130.88111.8338152.33516400.0016620~212311702.67148.4992524.22615000.0013322~232249.403.78148.4991395.77713500.0007723~2441936.23.782.83119.3664320.77315000.0011124~2550070.96.612.36104.7227424.33616400.0017725~26362122.48.981.6295.2711661..5420000.0023327~2862427.605.35148.4994098.22116400.0017728~2946281.85.352.16110.7009055.55518000.0021129~3682108.47.510.39100.88810935..0720000.0023330~3122013.302.45148.4991974.88613000.0017731~3240934.52.4
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 九年级英语教学设计:基于语义网络的中考核心词汇分层建构与迁移应用策略研究
- 小学六年级综合实践活动教学设计:带着问题去春游 快乐的春天
- 初中八年级英语Unit 1 Happy Holiday大单元教学设计-基于语境的假期话题听说读写整合实践
- 初中七年级英语下册Unit 7 Grammar Focus现在时语法聚焦教案
- 心中有规矩 行为定方圆-初中八年级道德与法治主题班会教学设计
- 高中劳动教育高一年级《荆芥捞面制作与面食文化传承》教学设计
- 高中地理选择性必修3 教学设计 矿产资源与国家安全
- 初中八年级数学“勾股定理的逆定理”教学设计
- 高三地理一轮复习教学设计 世界航运咽喉-巴拿马运河
- 基建领域开拓者:豪赫蒂夫如何借助人工智能把握增长机遇
- 2026年保安员考试题库及答案(1000题)
- 郑克鲁外国文学史课件
- 口腔出血的局部止血与感染预防
- 七年级数学上学期数轴上的动点问题40题含答案
- 吴亚丽公开课
- GB/T 9989.2-2025搪瓷耐化学侵蚀的测定第2部分:耐沸腾酸、沸腾中性液体、碱性液体及其蒸气化学侵蚀的测定
- DB3302∕T 001-2018 名优绿茶生产技术规程
- 【《龙力生物业绩预告造假的案例分析报告》8900字】
- 施工环保知识培训课件
- GB/T 45878-2025金属材料疲劳试验轴向平面弯曲方法
- 企业车队维修管理制度
评论
0/150
提交评论