现场签证项目工程量计算表,,,,,,,

工程名称:滨海花园别墅标段二建安工程,,,,,,,

序号,项目名称及内容,签证编号,单位,计算式,单件数,构件数,合计工程量

一、,建筑装饰工程,,,,,,

1,4C1-2承台以上回填石屑,01,,,,,

(1),首层建筑面积,,,,,,

,①~②,,m2,(5.5+0.09)*(4.26+4.34+2.8+0.18)+(0.5+0.18)*0.42-1.4*0.8/2,64.46,,64.46

,②~④,,m2,(5.5*(4.26+4.34+2.8+0.18)+(0.5+0.18)*0.42-1.4*0.8/2)*2,126.83,,126.83

,④~⑤,,m2,(5.5+0.09)*(4.26+4.34+2.8+0.18)+(0.5+0.18)*0.42-1.4*0.8/2,64.46,,64.46

,小计,,m2,,,,255.75

(2),基础梁混凝土C25,,,,,,

,JL1(200*500),,m3,(4.34-0.09*2)*0.2*(0.5-0.12)*4,1.26,,1.26

,JL2(200*500),,m3,(2.8-0.09*2)*0.21*(0.5-0.1)*4,0.88,,0.88

,JL3(200*500),,m3,(2.8-0.09*2)*0.21*(0.5-0.1)*4,0.88,,0.88

,JKL1(180*500),,m3,(5.5-0.09-0.31)*0.2*(0.5-0.12)*1,0.39,,0.39

,JKL2(180*500),,m3,(5.5-0.09*2)*0.2*(0.5-0.12)*2,0.81,,0.81

,KL3(1)(180*500),,m3,(5.5-0.09-0.31)*0.2*(0.5-0.12)*1,0.39,,0.39

,KL4(1)(180*500),,m3,(5.5-0.09*2)*0.2*(0.5-0.12)*4,1.62,,1.62

,KL5(1)(180*500),,m3,(5.5-0.09*2)*0.2*(0.5-0.1)*4,1.70,,1.70

,KL6(1)(180*500),,m3,(5.5-0.09-0.31)*0.2*(0.5-0.1)*1,0.41,,0.41

,KL7(1)(180*500),,m3,(5.5-0.09*2)*0.2*(0.5-0.1)*1,0.43,,0.43

,KL7(180*500),,m3,(5.5-0.09*2)*0.2*(0.5-0.1)*2,0.85,,0.85

,JKL7(3B)(180*500),,m3,(1.33+4.26+4.34+2.8+1.32-0.4*4)*0.2*(0.5-0.12)*2,1.89,,1.89

,KL8(180*500),,m3,(1.33+4.26+4.34+2.8+1.32-0.4*4)*0.2*(0.5-0.12)*2,1.89,,1.89

,KL8(4B)(180*700),,m3,(1.33+1.32+3.2+2.8-0.09*2-0.6-0.7)*0.2*(0.5-0.1)+(4.26+4.34-0.51-0.61-0.7-0.09)*0.2*(0.5-0.12),1.08,,1.08

,小计,,,,,,14.48

(3),土石方回填(承台以上),,m3,255.75*0.45-14.48,100.61,,100.61

,4C1~4C2室内回填石屑合计,,m3,100.61/2,,,50.30

2,样板房装修外墙脚手架,02,,,,,

(1),单排脚手架,,,,,,

,3CS1-2,,m2,((3.4+3.6)*4+2.5*4+4*3+1.2+1.6*4+1.5*4+(1.2+2.8)*2+4)*(3.2+3+0.3),491.40,1.00,491.40

,3CS1-2(第二次搭设),,m2,同上,491.40,1.00,491.40

,4C1~2,,m2,(6*4+1.8+2.1+4.26+4.34+2.8+1.32+1.8*2+4)*(3.2+3+2.8+0.3),448.45,1.00,448.45

,5CL1~2,,m2,(2.8+0.81+3.3*2+2.8+0.9+0.6+3+1.5+1.9+4.8+4)*(0.3+3.2+3+2.8),276.30,1.00,276.30

,小计,,,,,,1707.55

(2),综合脚手架面积,,m2,(0.9+2.8+3.3*2+2.8+0.81+4)*(0.3+3.2+3+2.5),161.19,1.00,161.19

,小计,,,,,,161.19

3,修补CL型别墅采光棚与围护墙缝隙,03,,,,,

(1),1:2水泥砂浆填缝,,m,2.04*2+3.4,7.48,24.00,179.52

(2),变形缝,,m,2.04*2+3.4,7.48,24.00,179.52

(3),砖砌体,,m3,(2.04*2+3.4)*0.15*0.15,0.17,24.00,4.04

(4),墙面抹灰,,m2,(2.04*2+3.4)*(0.15+0.15),2.24,24.00,53.86

(5),外墙涂料,,m2,(2.04*2+3.4)*(0.15+0.15),2.24,24.00,53.86

4,拆除5CL3后花园钢筋混凝土,04,,,,,

(1),拆除钢筋混凝土,,m3,签证工程量(2.3*1.13*0.2),,,0.52

5,第二次补强加固CS入户平台板,05,,,,,

(1),飘板陶粒混凝土拆除,,m3,3.8*2.4*0.35+3.2*2.1*0.15,4.20,9.00,37.80

(2),浇筑混凝土,,m3,1.92*3.8*((0.21+0.12)/2)*2,1.20,9.00,10.84

(3),钢筋制作安装,,t,,,,0.944

(4),钢筋植筋,,根,Φ14:225根,Φ8:180根,,,405.00

(5),模板制作安装、拆除,,m2,(3.8*0.12+1.92*((0.21+0.12)/2)*2),1.09,9.00,9.81

6,人工凿低窗台水泥砂浆,06,,,,,

(1),CS型别墅,,m2,1.2*0.13*2+2.1*0.13*3+0.6*0.13,1.209,12.00,14.51

(2),C型别墅,,m2,0.9*0.13+1.2*0.13*2,0.429,29.00,12.44

(3),CL型别墅,,m2,2.6*0.13+1.8*0.13+2.1*0.65+2.5*0.65*2,5.187,24.00,124.49

7,入户防盗门改尺寸后修补缝隙,07,,,,,

(1),混凝土浇筑,,m3,0.1*1.2*0.2,0.024,65.00,1.56

(2),模板制安,,m2,(0.1+0.12)*1.2,0.264,65.00,17.16

(3),门头钢筋制安,,kg,1.25*2*0.395,0.9875,65.00,64.19

(4),零星项目抹灰,,m2,1.2*0.2*2,0.48,65.00,31.20

8,修补CL型别墅采光棚与分户墙缝隙,08,,,,,

(1),墙面一般抹灰,,m2,3.2*23*0.3,,,22.08

(2),水泥砂浆填补坑槽,,m,3.2*23,,,73.60

(3),内墙涂料,,m2,3.2*23*0.15,,,11.04

(4),外墙涂料,,m2,3.2*23*0.15,,,11.04

(5),脚手架(满堂脚手架),,m2,3.2*2*6+3.2*2*17*40%,,,81.92

9,厨房该门后修复吊顶天棚及墙面砖,09,,,,,

(1),天棚铝扣板天花拆除,,m2,2.65*2.1,5.57,28.00,155.82

(2),墙面砖拆除,,m2,2.8*(1.6+0.3+0.3),6.16,28.00,172.48

(3),墙面抹灰,,m2,2.8*(1.6+0.3+0.3),6.16,28.00,172.48

(4),天棚铝扣板天花(拆出重新安装增补量),,m2,2.65*2.1*30%,1.67,28.00,46.75

(5),墙面重新贴面砖,,m2,(2.8*(1.6+0.3+0.3)+5.45*0.05*2,6.71,28.00,187.74

(6),建筑垃圾清理,,套,28.00,,,28.00

10,5CL2改楼梯地面砖,10,,,,,

(1),人工凿除楼梯地面砖,,,,,,

,楼梯间踢脚线,,m2,(3+1.6+2.8*2+1.9)*0.2+(3+3.7+1.7+0.66+0.29+0.41+3.5)*0.1,,,3.75

,首层平台,,m2,1.08*1.7,,,1.84

,走道平台(二层),,m2,1.7*1.6+2.3*1.3,,,5.71

,天面平台,,m2,1.9*0.9,,,1.71

,转角平台,,m2,0.5*0.5*0.5*4,,,0.50

,步级砖,,m2,(0.168+0.26)*0.85*37+(0.168+0.26)*0.7*3,,,14.36

,小计,,,,,,27.86

(2),重新铺贴楼梯地面砖,,m2,同(1),,,27.86

(3),场地清理,,工日,签证工程量,,,8.00

11,5CL2型别墅改内庭院沉池,"11,12",,,,,

(1),人工凿除沉池地面砖,,m2,1.95*2.5,4.88,1.00,4.88

(2),水泥砂浆楼地面,,m2,1.95*2.5,4.88,22.00,107.25

(3),人工清理,,工日,2,2.00,1.00,2.00

12,修补采光井护栏墙面孔洞,13,,,,,

(1),1:2水泥砂浆填补孔洞,,m3,0.2*0.2*4*0.07,0.011,24.00,0.27

(2),墙面煽灰刷乳胶漆,,m2,0.4*1.2*2,0.96,24.00,23.04

(3),场地清理,,工日,8.4(签证工日),,,8.40

13,清运3CS2门前地坪,,,,,,

(1),平整场地,,工日,签证工日,,,3.00

,,,,,,,,

二,给排水、电气安装工程,,,,,,

1,样板房临时水电安装,15,,,,,

(1),电缆沟槽土方挖填,,m3,17.8*0.3*0.5,3.56,1.00,3.56

(2),电气配管,,m,签证工程量,,,17.80

(3),立木电杆,,根,签证工程量,,,5.00

(4),导线架设,,m,签证工程量,,,347.10

(5),电气配线,,m,签证工程量,,,57.60

(6),配电箱安装,,套,签证工程量,,,1.00

(7),控制开关安装,,个,签证工程量,,,1.00

(8),漏电空气开关安装,,个,签证工程量,,,2.00

(9),电表安装,,台,签证工程量,,,1.00

(10),PPR给水管,,m,签证工程量,,,72.00

(11),水表,,组,签证工程量,,,1.00

(12),水龙头,,个,签证工程量,,,4.00

2,更换地下排水、排污管道,16,,,,,

,拆除工程,,,,,,

,CL型别墅(共24套),,,,,,

(1),人工凿孔(洞)钢筋砼结构(洞口截面㎜)300*300以外,,m2,1*0.8*6,4.800,24.000,115.200

(2),"人工挖土方(单管按60㎝宽,多管按100㎝宽,深度按80㎝计)",,m3,(4.5+1.5+3+3.5+1)*0.6*0.8+(2+1.9+4)*1*0.8,12.800,24.00,307.200

(3),余土弃置(石方外运50米),,m3,(1*0.8*0.11)*6,0.528,24.00,12.672

(4),余土弃置(土方外运50米),,m3,(4.5+1.5+3+3.5+1)*0.6*0.8+(2+1.9+4)*1*0.8,12.800,24.00,307.200

(5),地下管道拆除,,,,,,

,DN100PVC-U波纹管,,m,(6+6.5+1+2+2.5+0.8)+2,20.80,24.00,499.200

,DN75PVC-U波纹管,,m,(4+4+6+1+2+9+1+1.5+4+1.5)+2,36.00,24.00,864.000

,CS型别墅(共12套),,,,,,

(1),人工凿孔(洞)钢筋砼结构(洞口截面㎜)300*300以外,,m2,1*0.8*5,4.000,12.00,48.000

(2),"人工挖土方(单管按60㎝宽,多管按100㎝宽,深度按80㎝计)",,m3,(8+1+2.5+2.5+2+3)*0.6*0.8+2*1*0.8,10.72,12.00,128.640

(3),余土弃置(石方外运50米),,m3,(1*0.8*0.11)*5,0.440,12.00,5.280

(4),余土弃置(土方外运50米),,m3,(8+1+2.5+2.5+2+3)*0.6*0.8+2*1*0.8,10.72,12.00,128.640

(5),地下管道拆除,,,,,,

,DN100PVC-U波纹管,,m,8+1+2+2.5+1.5+3+1.2,19.20,12.00,230.400

,DN75PVC-U波纹管,,m,1.80,1.80,12.00,21.600

,DN50PVC-U波纹管,,m,3+2.5,5.50,12.00,66.000

,C型别墅(共29套),,,,,,

(1),人工凿孔(洞)钢筋砼结构(洞口截面㎜)300*300以外,,m2,1*0.8*6,4.800,29.000,139.200

(2),"人工挖土方(单管按60㎝宽,多管按100㎝宽,深度按80㎝计)",,m3,(12+10.5+7+5.5+3.2+1.5+2.5+2.5)*0.6*0.8,21.456,29.00,622.224

(3),余土弃置(石方外运50米),,m3,(1*0.8*0.11)*6,0.528,29.00,15.312

(4),余土弃置(土方外运50米),,m3,(12+10.5+7+5.5+3.2+1.5+2.5+2.5)*0.6*0.8,21.456,29.00,622.224

(5),地下管道拆除,,,,,,

,DN100PVC-U波纹管,,m,3+10.5+1.5+11.5+1+4+7+3+2+2,45.500,29.00,1319.500

,DN75PVC-U波纹管,,m,5+0.5,5.500,29.00,159.500

,拆除项目工程量合计,,,,,,

(1),人工凿孔(洞)钢筋砼结构(洞口截面㎜)300*300以外,,m3,(115.2+48+139.2)*0.11,,,33.264

(2),"人工挖土方(单管按60㎝宽,多管按100㎝宽,深度按80㎝计)",,m3,,,,1058.064

(3),余土弃置(石方外运50米),,m3,,,,33.264

(4),余土弃置(土方外运50米),,m3,,,,1058.064

(5),地下管道拆除,,,,,,

,DN100PVC-U波纹管,,m,,,,2049.100

,DN75PVC-U波纹管,,m,,,,1045.100

,DN50PVC-U波纹管,,m,,,,66.000

,重新吊装管道,,,,,,

,CL型别墅(共24套),,,,,,

(1),重新安装DN100PVC-U波纹管,,m,(6+6.5+1+2+2.5+0.8)+2,20.80,24.00,499.200

(2),重新安装DN75PVC-U波纹管,,m,(4+4+6+1+2+9+1+1.5+4+1.5)+2,36.00,24.00,864.000

(3),膨胀螺栓Φ10,,个,(20.8+36)/1,57.00,24.00,1368.000

(4),吊杆钢筋Φ10,,kg,1*57*0.0617,3.517,24.00,84.406

(5),楼板钢筋制安,,kg,(1+0.8)/0.15*0.6*0.395*6,17.064,24.00,409.536

(6),管箍(加厚型)Φ110,,套,20.8/1,20.00,24.00,480.000

(7),管箍(加厚型)Φ75,,套,36/1,36.00,24.00,864.000

(8),18㎜厚夹板,,m2,1*0.8*6,4.80,24.00,115.200

(9),细石混凝土C25,,m3,(1*0.8*0.11)*6,0.528,24.00,12.672

,CS型别墅(共12套),,,,,,

(1),重新安装DN100PVC-U波纹管,,m,8+1+2+2.5+1.5+3+1.2,19.20,12.00,230.400

(2),重新安装DN75PVC-U波纹管,,m,1.80,1.80,12.00,21.600

(3),重新安装DN50PVC-U波纹管,,m,3+2.5,5.50,12.00,66.000

(4),膨胀螺栓Φ10,,个,(19.2+1.8+5.5)/1,26.00,12.00,312.000

(5),吊杆钢筋Φ10,,kg,1*26*0.0617,1.604,12.00,19.248

(6),楼板钢筋制安,,kg,(1+0.8)/0.15*0.6*0.395*5,14.220,12.00,170.640

(7),管箍(加厚型)Φ110,,套,19.2/1,19.00,12.00,228.000

(8),管箍(加厚型)Φ75,,套,1.8/1,2.00,12.00,24.000

(9),管箍(加厚型)Φ50,,套,5.5/1,5.00,12.00,60.000

(10),18㎜厚夹板,,m2,1*0.8*6,4.00,12.00,48.000

(11),细石混凝土C25,,m3,(1*0.8*0.11)*5,0.440,12.00,5.280

,C型别墅(共29套),,,,,,

(1),重新安装DN100PVC-U波纹管,,m,3+10.5+1.5+11.5+1+4+7+3+2+2,45.50,29.00,1319.500

(2),重新安装DN75PVC-U波纹管,,m,5+0.5,5.50,29.00,159.500

(3),膨胀螺栓Φ10,,个,(45.5+5.5)/1,50.00,29.00,1450.000

(4),吊杆钢筋Φ10,,kg,1*50*0.0617,3.085,29.00,89.465

(5),楼板钢筋制安,,kg,(1+0.8)/0.15*0.6*0.395*6,17.064,29.00,494.856

(6),管箍(加厚型)Φ110,,套,45.5/1,45.00,29.00,1305.000

(7),管箍(加厚型)Φ75,,套,5.5/1,5.00,29.00,145.000

(8),18㎜厚夹板,,m2,1*0.8*6,4.80,29.00,139.200

(9),细石混凝土C25,,m3,(1*0.8*0.11)*6,0.528,29.00,15.312

,重新吊装管道工程量合计,,,,,,

(1),重新安装DN100PVC-U波纹管,,m,,,,2049.100

(2),重新安装DN75PVC-U波纹管,,m,,,,1045.100

(3),重新安装DN50PVC-U波纹管,,m,,,,66.000

(4),膨胀螺栓Φ10,,个,,,,3130.000

(5),吊杆钢筋Φ10,,kg,,,,193.119

(6),楼板钢筋制安,,kg,,,,1075.032

(7),管箍(加厚型)Φ110,,套,,,,2013.000

(8),管箍(加厚型)Φ75,,套,,,,1033.000

(9),管箍(加厚型)Φ50,,套,,,,60.000

(10),18㎜厚夹板,,m2,,,,302.400

(11),细石混凝土C25,,m3,,,,33.26

,抽水台班费,,,,,,

(1),潜水泵出口直径100㎜,,台班,1.00,1.000,65.00,65.00

3,更改室外排水管,17,,,,,

(1),排水管拆除,,m,签证工程量,,,101.00

(2),HDPE塑料排水管安装,,m,签证工程量,,,101.00

(3),砌筑检查井(污水检查井),,座,签证工程量,,,11.00

(4),砌筑检查井(雨水井),,座,签证工程量,,,11.00

4,更改室外水表,18,,,,,

(1),挖土方,,m3,0.6*0.5*0.4,0.12,65.00,7.80

(2),土方回填,,m3,签证工程量,,,7.00

(3),PPR给水管,,m,签证工程量,0.700,65.00,45.50

5,更改室外电缆(按现场签证单统计数据),19,,,,,

(1),3CS1-12,,,,,,

,人工挖电缆管线沟槽土方,,m3,3.5*0.5*0.4,0.70,12.00,8.40

,拆除原埋设旧电缆,,m,13*1,13.00,12.00,156.00

,重新埋设线管Φ50PVC管,,m,15*1,15.00,12.00,180.00

,重新管内穿线,,m,15+1.2,16.20,12.00,194.40

,人工回填土方夯实,,m3,3.5*0.5*0.4,0.70,12.00,8.40

(2),4C1-12,,,,,,

,人工挖电缆管线沟槽土方,,m3,1*0.5*0.4+4.6*0.5*0.4,1.12,12.00,13.44

,拆除原埋设旧电缆,,m,5.8*1,5.80,12.00,69.60

,重新埋设线管Φ50PVC管,,m,4.6*1,4.60,12.00,55.20

,重新管内穿线,,m,4.6+1.2,5.80,12.00,69.60

,人工回填土方夯实,,m3,1*0.5*0.4+4.6*0.5*0.4,1.12,12.00,13.44

(3),7C1-17,,,,,,

,人工挖电缆管线沟槽土方,,m3,1*0.5*0.4+4.8*0.5*0.4,1.16,17.00,19.72

,拆除原埋设旧电缆,,m,6*1,6.00,17.00,102.00

,重新埋设线管Φ50PVC管,,m,4.8*1,4.80,17.00,81.60

,重新管内穿线,,m,4.8+1.2,6.00,17.00,102.00

,人工回填土方夯实,,m3,1*0.5*0.4+4.6*0.5*0.4,1.12,17.00,19.04

,合计,,,,,,

,人工挖电缆管线沟槽土方,,m3,,,,41.56

,拆除原埋设旧电缆,,m,,,,327.60

,重新埋设线管Φ50PVC管,,m,,,,316.80

,"管内穿线

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论