DL/T5190.3-××××
ICS
K
备案号:
中华人民共和国电力行业标准
DL/T5190.3-XXXX
P代替DL5190.3-2012
电力建设施工技术规范
第3部分:汽轮发电机组
Technicalspecificationforthermalpower
erectionandconstruction
Part3:steamturbinegeneratorunit
(征求意见稿)
XXX-XX-XX发布XXXX-XX-XX实施
国家能源局发布
DL5190.3—XXXX
II
DL5190.3—XXXX
目次
1总则................................................................................................1
2术语................................................................................................2
3基本规定........................................................................................5
3.1设备开箱检验及保管..............................................................................5
3.2土建工程..................................................................................................6
3.3设备及系统安装......................................................................................7
3.4试运行......................................................................................................9
4汽轮机本体..................................................................................12
4.1一般规定................................................................................................12
4.2本体基础................................................................................................12
4.3台板与垫铁............................................................................................14
4.4汽缸、轴承座及滑销系统....................................................................18
4.5轴承和油挡............................................................................................23
4.6整体供货的汽缸....................................................................................31
4.7汽轮机转子............................................................................................33
4.8通流部分设备安装................................................................................38
4.9减速器和盘车装置................................................................................44
4.10汽轮机扣大盖......................................................................................47
4.11基础二次灌浆及养护..........................................................................52
4.12质量验收应提交的项目文件..............................................................53
5汽轮机辅助设备..........................................................................57
5.1一般规定................................................................................................57
5.2凝汽器....................................................................................................58
5.3直接空冷凝汽器....................................................................................65
5.4间接空冷装置........................................................................................71
III
DL5190.3—XXXX
5.5热交换器................................................................................................74
5.6箱罐和除氧器........................................................................................76
5.7减温减压装置........................................................................................78
5.8抽气设备................................................................................................79
5.9汽水管道的吹扫和冲洗........................................................................81
5.10汽轮机真空系统严密性检查..............................................................82
5.11汽轮机辅助设备试运行......................................................................83
5.12质量验收应提交的项目文件..............................................................85
6汽轮机附属机械..........................................................................88
6.1一般规定................................................................................................88
6.2一般离心泵............................................................................................95
6.3给水泵及其配套装置..........................................................................100
6.4立式泵..................................................................................................104
6.5深井泵..................................................................................................116
6.6空冷风机和水塔风机..........................................................................119
6.7旋转滤网..............................................................................................121
6.8真空泵安装..........................................................................................122
6.9附属机械分部试运行..........................................................................123
6.10质量验收应提交的项目文件............................................................129
7燃气轮机本体............................................................................132
7.1本体基础..............................................................................................132
7.2垫铁和可调固定器..............................................................................132
7.3台板和支撑装置..................................................................................132
7.4燃气轮机本体......................................................................................132
7.5燃气轮机进气、排气系统安装..........................................................136
7.6基础二次灌浆及养护..........................................................................138
7.7罩壳安装..............................................................................................138
7.8质量验收应提交的项目文件..............................................................138
8燃气轮机附属系统....................................................................141
IV
DL5190.3—XXXX
8.1设备及框架模块安装..........................................................................141
8.2附属系统管道安装..............................................................................143
8.3燃气轮机附属系统试运行..................................................................145
8.4质量验收应提交的项目文件..............................................................147
9发电机和励磁装置....................................................................149
9.1一般规定..............................................................................................149
9.2轴承座及轴承......................................................................................153
9.3定子......................................................................................................154
9.4发电机转子..........................................................................................158
9.5调整定子位置和封闭端盖..................................................................161
9.6氢冷和水氢氢冷发电机的轴密封装置及气体冷却系统..................163
9.7双水内冷发电机进出水支座和冷却器..............................................167
9.8冷却水系统..........................................................................................171
9.9励磁装置..............................................................................................173
9.10质量验收应提交的项目文件............................................................174
10调节保安装置和油系统..........................................................177
10.1一般规定................................................................................177
10.2电液调节保安装置............................................................................180
10.3汽门及其传动机构............................................................................183
10.4离心式主油泵..........................................................................188
10.5调节油系统................................................................................190
10.6润滑油系统................................................................................192
10.7氢冷发电机的密封油系统................................................................197
10.8油循环和油系统试运........................................................................199
10.9质量验收应提交的项目文件............................................................203
11汽轮机本体范围的管道..........................................................205
11.1一般规定............................................................................................205
11.2阀门安装............................................................................................205
11.3管道安装............................................................................................206
V
DL5190.3—XXXX
11.4质量验收应提交的项目文件............................................................209
12起重设施..................................................................................210
12.1桥式起重机........................................................................................210
12.2电动(手动)葫芦............................................................................218
12.3质量验收应提交的项目文件............................................................219
13汽轮机化妆板、平台、梯子和盖板.....................................221
13.1汽轮机化妆板....................................................................................221
13.2平台、梯子和盖板............................................................................221
附录A汽轮机台板砂浆垫块施工规定......................................223
附录B汽缸密封涂料..................................................................225
附录C常用密封材料品种及适用范围......................................226
附录D常用油脂品种及适用范围..............................................228
附录E汽轮机螺栓常用材料物理性能......................................231
附录F用钢丝找中心垂弧计算公式..........................................232
附录G机组振动标准..................................................................233
附录H油质等级标准..................................................................234
标准用词说明..................................................................................237
引用标准名录..................................................................................238
条文说明..........................................................................................240
VI
DL5190.3—XXXX
Contents
1Generalprovisions························································1
2Terms·······································································2
3Basicrequirement·························································5
3.1Equipmentumpackingandstorage······································5
3.2Civilworks······························································7
3.3Equipmentandsystemerection·········································7
3.4Trialrunofturbogenerators·············································9
4Steamturbine····························································12
4.1Generalrequirement···················································12
4.2Requirementsforfoundation···········································12
4.3Soleplateandshims····················································14
4.4Casing,bearingpedestalsandslidingkeysystem······················18
4.5Bearingandoilbaffle··················································23
4.6Integralcylinder·······················································31
4.7Steamturbinerotor····················································33
4.8Installationofequipmentinflowpassage······························38
4.9Turninggearandspeedreducer········································44
4.10Coveringofsteamturbine············································47
4.11Secondarygroutingandcuring·······································52
4.12Projectdocumentstobeprovidedbeforequalityacceptance·········53
5Auxiliaryequipments···················································57
5.1Generalrequirement···················································57
5.2Condenser······························································58
5.3Aircooleddevice······················································65
5.4Indirectairdevice······················································71
VII
DL5190.3—XXXX
5.5Heatexchanger························································74
5.6Tanksanddeaerator····················································76
5.7Attemperatorandpressurereducingdevice····························78
5.8Extractionequipments·················································79
5.9Purgingandflushingofsteam-waterpipelines·························80
5.10Leakagecheckofsteamturbinevacuumsystem·····················82
5.11Trialrunofsteamturbineauxiliaryequipment·······················83
5.12Projectdocumentstobeprovidedbeforequalityacceptance········85
6Accessorymachinery···················································88
6.1Generalrequirement··················································88
6.2Commoncentrifugalpumps············································95
6.3Feedwaterpumpunitsandtheirassociateddevices··················100
6.4Verticalpumps························································104
6.5Deepwellpumps·····················································116
6.6Aircoolingandwatercoolingfans···································119
6.7Rotatingfiter·························································121
6.8Vacuumpump························································122
6.9Trialrunofaccessorymachinery·····································123
6.10Projectdocumentstobeprovidedbeforequalityacceptance········219
7Gasturbine······························································132
7.1Requirementsforfoundation········································132
7.2Shimandfixator·····················································132
7.3Soleplateandsupportdevice·········································132
7.4Gasturbine···························································132
7.5Airintakeandexhaustsystems············································136
7.6Secondarygroutingandcuring······································138
7.7Enclosureofgasturbine····················································138
7.8Projectdocumentstobeprovidedbeforequalityacceptance··········138
8Gasturbineaccessorysystems·············································141
VIII
DL5190.3—XXXX
8.1Equipmentsandmoduleerection··········································141
8.2Pipingerectionofaccessorysystems·····································143
8.3Trialrunofaccessorymachinery··········································145
8.4Projectdocumentstobeprovidedbeforequalityacceptance··········147
9Generatorandexcitationdevice·····································149
9.1Generalrequirement··················································149
9.2Bearingseatandbearing·············································153
9.3Stator·································································154
9.4Generatorrotor·······················································158
9.5Statorpositionadjustmentandcoverclosing·························161
9.6Shaftsealingandgascoolingsystemofhydrogen-
cooledandwater-hydrogen-hydrogen-cooledgenerator············163
9.7Waterinlet/outletpedestalsandcooler·······························167
9.8Coolingwatersystem·················································171
9.9Excitationdevice·····················································173
9.10Projectdocumentstobeprovidedbeforequalityacceptance········174
10Control-protectingdeviceandoilsystem·························177
10.1Generalrequirement················································177
10.2Electro-hydrauliccontrolandprotectingdevice·····················180
10.3Steamvalveanditsdrivingadevice································183
10.4Centrifugalmainoilpump··········································188
10.5Controloilsystem···················································190
10.6Lubricatingoilsystem··············································192
10.7Sealingoilsystemofhydrogen-cooledgenerator···················197
10.8Trialrunofoilsystemandoilflushing······························199
10.9Projectdocumentstobeprovidedbeforequalityacceptance······203
11Pipingofsteamturbine············································205
11.1Generalrequirement···············································205
11.2Valvesandspecialparts·············································205
IX
DL5190.3—XXXX
11.3Installationofpiping················································206
11.4Projectdocumentstobeprovidedbeforequalityacceptance········209
12hoistingequipmentofthemainpowerhouse····················210
12.1Bridgecrane·························································210
12.2Electric(manual)hoist··············································218
12.3Projectdocumentstobeprovidedbeforequalityacceptance········219
13Enclosure,platformladderandcoverofsteamturbine·········221
13.1Enclosureofsteamturbine··········································221
13.2platformladderandcoverofsteamturbine·························221
AppendixARequirementsforconstructionofmortarand
padsforS/Tsoleplate····································223
AppendixBcylindercoating···········································225
AppendixCCommonsealingmaterialtypesandscope
ofapplication··············································226
AppendixDCommongreasetypesandscope
ofapplication··············································228
AppendixEPhysicalperformanceofcommonS/T
boltingmaterials··········································231
AppendixFSagcalculationformulaforcentering
withsteelwire············································232
AppendixGUnitvibrationcriterion··································233
AppendixHOilqualityratingcriterion······························234
Explanationofwordinginthiscode·····································237
Normativestandard························································238
Addition:Explanationofprovisions·····································240
X
DL5190.3—XXXX
1总则
1.0.1为了加强汽轮发电机组工程施工技术管理,进一步提高工
程施工质量,修订DL5190.3—2012《电力建设施工技术规范》第
三部分。
1.0.2本部分适用于火力发电厂汽轮发电机组、燃气-蒸汽联合
循环发电机组、单循环燃气发电机组、辅助设备及附属机械的施
工。
1.0.3汽轮发电机组的施工应依据经批准的设计和设备制造厂技
术文件,如需修改或变更,应由设计单位、设备制造厂出具相应
的证明文件,办理相关的审批手续。发电厂土建工程除满足本规
范《电力建设施工技术规范第1部分:土建工程》的规定外,
特殊要求按本部分相关规定执行。
1.0.4汽轮发电机组的施工应按设备订货合同、技术协议及制造
厂有效技术文件的要求执行,如合同协议及制造厂技术文件无明
确要求或要求不全面时,按本部分规定执行。
1.0.5汽轮发电机组的施工,除应符合本部分规定外,还应执行
国家、行业现行有关标准规定。
1
DL5190.3—XXXX
2术语
2.0.1椭圆度ellipticity
圆柱形轴或者孔在某一横剖面的不圆度,其数值为该横剖面
最大直径与最小直径之差。
2.0.2不柱度non-cylindricity
圆柱形轴或孔通过轴中心线的轴向剖面上下线与平行线的偏
差。其数值为该轴或孔在轴向剖面上最大与最小直径之差。要求
为正圆柱体的部件,不柱度表示偏离正圆柱要求的程度。
2.0.3锥度taper
圆锥、圆台形状回转面与基准面的倾斜程度。对于圆锥形状
其数值为圆锥基准面直径与圆锥高度的比值,对于圆台形状其数
值为上下直径之差与圆台高度的比值。
2.0.4倾斜度tilt/(坡度)tilt(gradient)
直线或平面与基准线或基准面相交的倾斜程度。其数值为给
定的基准面或线长度内该面或线与基准面或线的最小距离与给定
长度的比值。
2.0.5平面度flatness
实际表面偏离标准平面的程度。其数值用实际平面距离标准
平面最远点的距离值表示。
2.0.6不平行度non-parallelism
两个相互平行的线或面间的不平行的程度。其数值为该二要
素间最大与最小垂直距离之差。
2.0.7不垂直度non-perpendicularity
两条轴线、轴线与平面或两平面之间所形成的角度与标准直
角之差。以单位长度内标准垂直线或面与所测线或面的最小距离
△表示,单位△/m。
2.0.8径向晃度radialrunout
2
DL5190.3—XXXX
径向晃度表示测量断面所在的轴表面到轴中心线距离的偏离
程度。用百分表垂直指向被测断面的轴中心线,转子轴颈在支持
面上盘动,被测表面上各点读数的最大与最小值之差,为轴颈在
该截面的径向晃度。
2.0.9端面瓢偏endingrunout
端面瓢偏表示该端面与轴中心线不垂直的程度。在被测端面
接近直径的周边部位,相对180°位置各安放一个垂直于端面的百
分表,盘动转子,两表同时指示的最大差值减去最小差值的1/2
即为端面瓢偏值。
2.0.10大型水泵largepumps
出口公称直径大于400mm的高压离心泵,以及入口公称直
径大于700mm的低压泵。
2.0.11高速水泵high-speedpumps
额定转速高于1500r/min的水泵。
2.0.12可调式汽封adjustablesteamseal
可调式汽封是一种随着启动过程中蒸汽压力的逐渐增大而分
段闭合的汽封。其主要特点:启动时,汽封块张开,使动静部分
达到最大间隙,避免了启动过程中由于振动及变形而导致的碰磨。
随着机组升速加负荷,汽封块端部闭合,使动静间隙减小,以减
少汽封的漏汽量从而提高机组的效率。
2.0.13空冷凝汽器air-cooledcondenser(ACC)
空冷凝汽器简称为ACC,指以空气作为冷却介质,使汽轮机
排汽凝结成水的表面式换热器。
2.0.14相对振动relativevibration
相对振动是指转轴和相应结构(例如轴承座或机壳)之间的
径向位移量的测量值,如无特别说明,本部分中的“轴振动”均
指相对振动。
2.0.15绝对振动absolutevibration
绝对振动是指转轴相对于某一惯性参考系的位移量的测量值。
3
DL5190.3—XXXX
2.0.16辅机故障减负荷试验runbacktest
当发生部分主要辅机故障停运,机组最大出力低于给定负荷
时,测试控制系统将机组负荷快速降低到实际所能达到的出力,
并控制机组在允许参数范围内继续运行能力的过程,称为辅机故
障减负荷试验。
4
DL5190.3—XXXX
3基本规定
3.1设备开箱检验及保管
3.1.1设备到达现场后,应由建设、制造、监理、总包、施工、
设备保管等相关单位共同开箱查验并记录签证。有缺陷的设备应
按合同约定进行处理。
3.1.2设备开箱检验时,装箱单、说明书、质量证明文件、图纸
等技术文件应齐全。
3.1.3设备装卸和搬运应符合下列规定:
1应按箱上标识部位绑扎吊索及加衬垫物,并防止重心偏
移;
2对刚度较差的设备,应采取措施防止变形;
3应核实设备搬运途中经过的路面、桥梁等承载能力;
4碳钢吊索不得与奥氏体不锈钢材质的设备接触。
3.1.4设备开箱检查应符合下列规定:
1在开箱检查时,应防止损伤和损坏设备及零部件。对装有
精密设备的箱件,应注意对精密设备妥善保护;
2设备防腐涂料未清理前,不得转动和滑动,清理检查后应
用原防腐涂料进行防腐处理;
3需要添加润滑剂等特殊要求的转动设备,开箱检查时不得
盘动;
4设备开箱检查后暂不安装时应重新封闭;露天放置的箱
件,应采取有效的防护措施;
5装箱设备的配件及专用工具应成套保管。
3.1.5设备保管人员应熟悉设备保管规程,汽轮发电机组设备的
特殊保管要求,并做好保管记录。
3.1.6设备安装前保管应符合DL/T855《电力基本建设火电设备
5
DL5190.3—XXXX
维护保管规程》的规定。
3.1.7设备和器材应分区、分类存放,标识清晰,并应符合下列
规定:
1存放区域应有明显的区界和消防通道,并具备可靠的消防
设施和有效的照明;
2大件设备的存放位置应根据施工顺序和运输条件,按照施
工组织设计的规定合理布置,以减少二次搬运;
3设备应支垫稳固、可靠,存放场地排水应畅通,并应采取
防撞、防冻、防潮、防尘和防倾倒等措施;
4存放地点和货架应具备足够的承载能力;
5海滨盐雾地区和含有腐蚀性的环境,应采取特殊措施,防
止设备锈蚀;
6仪器、仪表及精密部件应存放在货架上或按要求放置在保
温库内;
7管材、管件和部件应标识明确、分类存放,避免混淆;
8充氮保护的设备,应定期检查记录氮气压力及设备密封情
况。当压力低于3.5kPa时,应及时补充氮气;
9燃气轮机滤芯保管应有防潮措施。
3.1.8随设备提供的材料应有质量证明文件,在核查中对材料质
量有质疑时,应进行复检。
3.1.9外委加工和现场加工配制的成品或半成品,应按本部分的
有关规定进行检验,合格后方可使用。
3.1.10安装就位的设备应加强成品保护,防止设备在安装期间损
伤、锈蚀、冻裂;经过试运行的主要设备,应根据制造厂对设备
的有关要求,制定维护保养措施,经监理审定后,妥善保管。
3.2土建工程
3.2.1汽轮发电机组安装前期,由监理组织土建专业、安装专业
6
DL5190.3—XXXX
进行图纸会检。
3.2.2土建施工期间,安装专业应做如下工作:
1施工准备时,对预留孔洞、预埋件、汽轮发电机组基座及
主要附属设备基础等标高、中心线、地脚螺栓孔位置等重要几何尺
寸应进行校核;
2浇灌前,安装单位应参加基座浇灌前的中间核查工作;
3起吊重型设备需要的起吊设施的基础、锚固点及为超负荷
起吊而对建筑结构进行的加固方案,应在土建施工前与设计单位、
监理单位和土建施工单位确定;
4因吊装大型设备而预留的钢结构、基础或墙体,应在土建
施工前由设计单位、监理单位和土建施工单位等有关单位确认。
3.2.3交付安装的土建工程应具备下列条件:
1行车轨道安装完毕,二次灌浆的混凝土已达到设计强度,
并经验收合格;
2主辅设备基础、基座混凝土已达到设计强度的70%以上,
模板已拆除;
3厂房封闭,屋面止水;
4厂房内的各基础纵横中心线、标高标识和基础沉降观测点
清晰、齐全;
5各层平台、通道、梯子、栏杆、踢脚板装设完毕且焊接牢
固,主机周边孔洞有可靠的临时盖板或围栏;
6厂房内的管沟、泵坑、排水沟及集水井等清洁,排水畅通;
7消防设施可靠;
8建筑物和基础上的基准线与基准点标识清晰、齐全。
3.3设备及系统安装
3.3.1设备安装应根据下列技术文件进行:
1制造厂设备质量证明书、说明书、图纸等;
7
DL5190.3—XXXX
2专业施工组织设计及作业指导书;
3绿色施工专项措施。
3.3.2施工前,工程技术人员应对施工人员进行技术交底。
3.3.3汽轮发电机组的施工场地应符合下列规定:
1临时放置设备和材料的场地应满足相应载荷要求;
2施工地点环境温度宜保持在5℃以上;
3水、电等力能供应应满足施工需求,照明充足;
4基建施工和生产运行区域的隔离设施应有明显标识;
5起重设备应具备使用条件。
3.3.4设备安装时,建筑物的保护应符合下列规定:
1不得任意变更或损坏建筑物结构;
2禁止在建筑物金属结构上任意施焊、切割;
3不得随意在建筑混凝土结构上锤击、开孔,不得凿开混凝
土保护层在钢筋上焊接、切割。
3.3.5设备安装前,如发现有损坏或质量缺陷,应及时通知有关
单位共同检查确认,并进行处理。
3.3.6设备中的零部件和紧固件安装前应按DL/T438《火力发电
厂金属技术监督规程》和DL/T439《火力发电厂高温紧固件技术
导则》规定进行光谱、无损探伤、金相、硬度等检验,并与制造
厂技术文件要求相符。
3.3.7设备及部件的清理应符合下列规定:
1设备部件内部的杂物、油垢、锈迹应清理干净并及时封闭;
2设备的精密加工面不应用铲刀、锉刀除锈,不得用火焰除
油;
3用蒸汽吹扫的部件应及时去除水分;
4清理轴颈和轴瓦时不得损伤其表面;
5清理后的设备及零部件应分类存放,并防止二次污染。
3.3.8汽轮发电机组施工应符合下列规定:
1设备的解体检查、测量和调整应符合制造厂的技术文件要
8
DL5190.3—XXXX
求;
2拆卸设备部套时应做好标记、使用专用工器具,并不得强
行拆装;
3拆下的零部件应妥善保管。
3.3.9隐蔽工程的安装检查应符合下列规定:
1进入隐蔽区域、设备内部清理和检查的人员,应穿无纽扣
的专用工作服,鞋底无铁钉并擦拭干净;
2设备及管道封闭前,应指定专人检查,确认内部无杂物后
办理签证;
3设备及管道的封闭应明显,牢固、可靠;
4不得在已最终封闭的设备或管道上施焊、开孔、拆封。
3.4试运行
3.4.1汽轮发电机及其附属机械、辅助设备试运时现场应具备下
列条件:
1厂区场地平整,道路畅通;
2试运范围内的施工临时设施应拆除并清理干净,现场沟
道、孔洞盖板齐全,临时孔洞应装设护栏或盖板,平台的楼梯、
通道、栏杆及护板应安装完毕;
3消防器材满足试运要求,消防系统具备投用条件,事故排
油系统具备使用条件;
4试运机组范围内的各层地面施工完毕;
5生活用的上下水道畅通,卫生设施能正常使用;
6厂房和厂区的排水系统、工业废水处理系统应正常投用;
7照明系统应正常投用,事故照明系统完整、可靠并处于备
用状态;
8试运时室内温度宜保持5℃以上;
9电话等通信设备安装完毕,应正常投用;
9
DL5190.3—XXXX
10与试运有关的空调系统应正常投用。
3.4.2汽轮发电机组及附属机械、辅助设备和系统,在试运前应
具备下列条件:
1设备及系统按规定安装完毕,并验收合格,安装技术记录
齐全;
2设备及管道的保温工作已完成,管道支吊架已调整结束;
3基础混凝土及二次灌浆层达到设计强度;
4操作电源、动力电源、压缩空气气源可靠;
5水位计和油位计标识清晰、显示正确;
6转动机械已按要求加润滑油、脂,油位正常;
7工业水系统具备投用条件且冲洗洁净;
8阀门应逐个检查调整完毕,全行程启闭(停)灵活、开
度准确且无卡涩;
9试运范围内的容器,已按要求清理和冲洗;
10各指示和记录仪表及信号、声光报警装置已装设齐全,
并经校验调整准确;
11试运设备或系统已挂牌并标识清晰,表计指示正确且在
有效期内;
12启动用汽源应充足并稳定,其压力和温度应能符合轴封
供汽、汽动给水泵、除氧器等用汽的要求;
13自动控制部分及精密部套的通风、空调装置应投用;
14试运设备的保护装置已校验合格并投用。
3.4.3汽轮发电机组的分部试运调试措施已批准。
3.4.4汽轮发电机组整套启动前应完成下列工作:
1汽水管道的吹扫和冲洗;
2冷却水系统通水试验和冲洗;
3化学水系统冲洗、充填药剂、调整试运行,并能供给足量
合格的除盐水;
4真空系统严密性检查;
10
DL5190.3—XXXX
5除氧器、热交换器、蒸发器、减压装置等的检查调整;
6各附属机械分部试运调整;
7润滑、调节和密封油系统及净化装置试运调整,油质合格;
8调节、保安系统静态整定和试验;
9顶轴装置和盘车装置调整试验,校对大轴晃度指示表;
10抽汽止回阀与传动装置的调整试验;
11汽封系统调整试运行;
12热工、电气有关保护、连锁装置,远方操作装置和电动、
气动、液动阀的调整试验,开、闭、富余行程及开闭时间已作记
录,并投运正常;
13中间再热机组旁路系统的调整试验;
14抽真空试验;
15低压缸喷水试验;
16发电机氢气冷却系统、绕组冷却水系统的冲洗与调整。
11
DL5190.3—XXXX
4汽轮机本体
4.1一般规定
4.1.1本章适用于汽轮机本体的台板、轴承座、轴承、汽缸、隔
板、汽封、转子、盘车装置及连通管道等部件的施工。
4.1.2汽轮机本体的设备吊装,除应按第3.1
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2023年5月中考道法重要时政
- 《第4单元 表内乘法(一):6的乘法口诀》说课稿、课堂教学实录、教学设计
- 电子商务系统分析与设计 课件 第5章 电子商务系统规划
- 保险公司协议存款合同-中国银行
- 石油地震勘探工中级试题预测三
- 在线网课知道《财务会计(常德职院)》单元测试答案
- 房屋转租合同参考模板
- 2023北京西城区高一下学期期末历史试题及答案
- 2023北京密云区高二下学期期末数学试题及答案
- 2024技术合作开发合同
- 大食物观与粮食安全专题讲座课件
- 俄乌的冲突课件
- 履带吊车安全使用及维护保养
- 寝室安全知识竞赛活动总结
- 建筑节能工程监理细则
- 第24课《石壕吏》课件(共28张)
- 生物分子的生命演义智慧树知到期末考试答案2024年
- 人力资源管理-基于创新创业视角智慧树知到期末考试答案2024年
- 供水管道巡检应急预案方案
- 2024版食源性疾病培训完整
- 售楼处客服礼仪培训
评论
0/150
提交评论