第第页施工员:质检员:监理工程师:建设单位代表:水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)12020/10/196:532020/10/197:320.54.029.37-6.8710.90.50.57679P.O42.53939112178722020/10/197:342020/10/198:140.54.029.37-6.8710.90.50.57680P.O42.54040109177732020/10/198:162020/10/198:560.53.939.37-6.8710.80.50.56673P.O42.54040108176342020/10/198:582020/10/199:380.54.029.37-6.8710.90.50.56677P.O42.54040109177752020/10/199:402020/10/1910:200.53.979.37-6.8710.80.50.57682P.O42.54040108175762020/10/1910:222020/10/1911:000.54.029.37-6.8710.90.50.56676P.O42.53838115177472020/10/1911:012020/10/1911:400.54.029.37-6.8710.90.50.57679P.O42.53939112174982020/10/1911:422020/10/1912:210.54.029.37-6.8710.90.50.56677P.O42.53939112177792020/10/1913:212020/10/1913:590.54.029.37-6.8710.90.50.57680P.O42.538381151769102020/10/1914:012020/10/1914:400.54.009.37-6.8710.90.50.57678P.O42.539391111775112020/10/1914:422020/10/1915:210.53.969.37-6.8710.80.50.56677P.O42.539391111744122020/10/1915:222020/10/1916:000.53.949.37-6.8710.80.50.56674P.O42.538381141749132020/10/1916:022020/10/1916:410.53.989.37-6.8710.90.50.57679P.O42.539391111741142020/10/1916:422020/10/1917:210.53.999.37-6.8710.90.50.56676P.O42.539391111786152020/10/1917:232020/10/1918:020.54.009.37-6.8710.90.50.56676P.O42.539391111771162020/10/1918:232020/10/1919:020.53.939.37-6.8710.80.50.56674P.O42.539391111799172020/10/1919:042020/10/1919:440.53.979.37-6.8710.80.50.57680P.O42.540401081748182020/10/1919:462020/10/1920:250.53.939.37-6.8710.80.50.56674P.O42.539391111796192020/10/1920:272020/10/1921:060.53.939.37-6.8710.80.50.57679P.O42.539391111732202020/10/1921:072020/10/1921:45433.949.37-6.8710.80.50.56674P.O42.538381141788212020/10/1921:472020/10/1922:260.53.959.37-6.8710.80.50.57678P.O42.539391111733222020/10/1922:282020/10/1923:060.53.999.37-6.8710.90.50.56677P.O42.538381141759232020/10/1923:082020/10/1923:470.53.999.37-6.8710.90.50.57680P.O42.539391111776施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—A杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)242020/10/206:482020/10/207:270.53.959.37-6.8710.80.50.56674P.O42.539391111765252020/10/207:292020/10/208:080.53.979.37-6.8710.80.50.56676P.O42.539391111751262020/10/208:102020/10/208:490.53.959.37-6.8710.80.50.57678P.O42.539391111780272020/10/208:512020/10/209:290.53.939.37-6.8710.80.50.56672P.O42.538381141779282020/10/209:312020/10/2010:110.54.019.37-6.8710.90.50.57679P.O42.540401091763292020/10/2010:132020/10/2010:520.54.029.37-6.8710.90.50.57679P.O42.539391121794302020/10/2010:532020/10/2011:320.53.969.37-6.8710.80.50.57678P.O42.539391111752312020/10/2011:352020/10/2012:140.53.999.37-6.8710.90.50.56677P.O42.539391111787322020/10/2012:452020/10/2013:250.53.959.37-6.8710.80.50.56676P.O42.540401081755332020/10/2013:272020/10/2014:060.53.939.37-6.8710.80.50.56674P.O42.539391111784342020/10/2014:072020/10/2014:460.53.989.37-6.8710.90.50.56676P.O42.539391111744352020/10/2014:482020/10/2015:270.54.029.37-6.8710.90.50.56676P.O42.539391121744362020/10/2015:292020/10/2016:080.53.949.37-6.8710.80.50.56672P.O42.539391111768372020/10/2016:102020/10/2016:490.53.939.37-6.8710.80.50.56673P.O42.539391111774382020/10/2016:522020/10/2017:310.53.999.37-6.8710.90.50.57679P.O42.539391111757392020/10/2018:332020/10/2019:120.53.939.37-6.8710.80.50.56674P.O42.539391111787402020/10/2019:142020/10/2019:530.53.989.37-6.8710.90.50.57683P.O42.539391111747412020/10/2019:552020/10/2020:350.53.939.37-6.8710.80.50.56674P.O42.540401081785422020/10/2020:372020/10/2021:160.54.009.37-6.8710.90.50.56674P.O42.539391111717432020/10/2021:172020/10/2021:57433.999.37-6.8710.90.50.56676P.O42.540401091787442020/10/2021:592020/10/2022:380.53.999.37-6.8710.90.50.57678P.O42.539391111740452020/10/2022:402020/10/2023:190.53.939.37-6.8710.80.50.56674P.O42.539391111758462020/10/2023:212020/10/2023:590.54.009.37-6.8710.90.50.57680P.O42.538381141768施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—A杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)472020/10/217:002020/10/217:380.54.019.37-6.8710.90.50.57679P.O42.538381151753482020/10/217:402020/10/218:180.53.959.37-6.8710.80.50.56673P.O42.538381141764492020/10/218:202020/10/218:590.54.019.37-6.8710.90.50.57678P.O42.539391121742502020/10/219:012020/10/219:390.53.959.37-6.8710.80.50.56674P.O42.538381141784512020/10/219:412020/10/2110:200.53.949.37-6.8710.80.50.56677P.O42.539391111769522020/10/2110:222020/10/2111:010.54.029.37-6.8710.90.50.56677P.O42.539391121780532020/10/2111:022020/10/2111:410.54.029.37-6.8710.90.50.57679P.O42.539391121752542020/10/2111:432020/10/2112:210.53.959.37-6.8710.80.50.56677P.O42.538381141790552020/10/2112:552020/10/2113:350.54.019.37-6.8710.90.50.57679P.O42.540401091751562020/10/2113:362020/10/2114:160.54.019.37-6.8710.90.50.56677P.O42.540401091781572020/10/2114:182020/10/2114:580.53.949.37-6.8710.80.50.56674P.O42.540401081744582020/10/2115:002020/10/2115:400.54.009.37-6.8710.90.50.57678P.O42.540401091761592020/10/2115:422020/10/2116:220.53.999.37-6.8710.90.50.57682P.O42.540401091744602020/10/2116:242020/10/2117:020.53.949.37-6.8710.80.50.56676P.O42.538381141756612020/10/2117:042020/10/2117:430.53.949.37-6.8710.80.50.56671P.O42.539391111767622020/10/2117:442020/10/2118:240.53.939.37-6.8710.80.50.56674P.O42.540401081779632020/10/2118:582020/10/2119:360.53.999.37-6.8710.90.50.57679P.O42.538381141753642020/10/2119:382020/10/2120:180.53.959.37-6.8710.80.50.56677P.O42.540401081776652020/10/2120:212020/10/2120:590.53.979.37-6.8710.80.50.56676P.O42.538381141717662020/10/2121:002020/10/2121:40433.959.37-6.8710.80.50.56677P.O42.540401081786672020/10/2121:412020/10/2122:210.54.029.37-6.8710.90.50.56677P.O42.540401091736682020/10/2122:232020/10/2123:020.54.009.37-6.8710.90.50.56677P.O42.539391111744施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—A杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)1372020/10/226:032020/10/226:410.54.009.37-6.8710.90.50.56677P.O42.5383811417541382020/10/226:432020/10/227:230.53.949.37-6.8710.80.50.56677P.O42.5404010817791392020/10/227:252020/10/228:040.54.029.37-6.8710.90.50.57682P.O42.5393911217781402020/10/228:062020/10/228:460.54.029.37-6.8710.90.50.57679P.O42.5404010917691412020/10/228:482020/10/229:280.53.969.37-6.8710.80.50.56674P.O42.5404010817701422020/10/229:302020/10/2210:080.53.989.37-6.8710.90.50.56676P.O42.5383811417931432020/10/2210:102020/10/2210:500.53.979.37-6.8710.80.50.57678P.O42.5404010817521442020/10/2210:522020/10/2211:300.53.959.37-6.8710.80.50.56673P.O42.5383811417801452020/10/2212:312020/10/2213:090.53.949.37-6.8710.80.50.56674P.O42.5383811417571462020/10/2213:102020/10/2213:490.53.949.37-6.8710.80.50.56674P.O42.5393911117881472020/10/2213:512020/10/2214:290.53.989.37-6.8710.90.50.57680P.O42.5383811417451482020/10/2214:312020/10/2215:100.53.949.37-6.8710.80.50.56677P.O42.5393911117401492020/10/2215:122020/10/2215:510.54.029.37-6.8710.90.50.57679P.O42.5393911217701502020/10/2215:532020/10/2216:320.54.029.37-6.8710.90.50.57678P.O42.5393911217641512020/10/2216:342020/10/2217:140.53.949.37-6.8710.80.50.56674P.O42.5404010817601522020/10/2217:152020/10/2217:550.54.029.37-6.8710.90.50.57680P.O42.5404010917861532020/10/2218:362020/10/2219:140.53.959.37-6.8710.80.50.57678P.O42.5383811417481542020/10/2219:162020/10/2219:560.53.939.37-6.8710.80.50.56673P.O42.5404010817961552020/10/2219:592020/10/2220:380.53.999.37-6.8710.90.50.56676P.O42.5393911117311562020/10/2220:392020/10/2221:17433.949.37-6.8710.80.50.56674P.O42.5383811417831572020/10/2221:182020/10/2221:570.53.969.37-6.8710.80.50.57678P.O42.5393911117451582020/10/2221:592020/10/2222:390.54.029.37-6.8710.90.50.57682P.O42.5404010917401592020/10/2222:412020/10/2223:200.53.969.37-6.8710.80.50.57678P.O42.5393911117711602020/10/2223:222020/10/230:020.53.989.37-6.8710.90.50.57679P.O42.540401091763施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—A杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)1612020/10/236:032020/10/236:420.53.999.37-6.8710.90.50.57678P.O42.5393911117751622020/10/236:442020/10/237:230.54.029.37-6.8710.90.50.57680P.O42.5393911217401632020/10/237:252020/10/238:050.53.959.37-6.8710.80.50.56672P.O42.5404010817801642020/10/238:072020/10/238:470.54.029.37-6.8710.90.50.56676P.O42.5404010917551652020/10/238:482020/10/239:270.53.959.37-6.8710.80.50.56674P.O42.5393911117711662020/10/239:292020/10/2310:070.53.939.37-6.8710.80.50.57678P.O42.5383811417781672020/10/2310:082020/10/2310:460.53.969.37-6.8710.80.50.56676P.O42.5383811417501682020/10/2310:482020/10/2311:270.53.989.37-6.8710.90.50.56677P.O42.5393911118001692020/10/2312:302020/10/2313:100.53.999.37-6.8710.90.50.57678P.O42.5404010917491702020/10/2313:122020/10/2313:510.53.949.37-6.8710.80.50.56676P.O42.5393911117851712020/10/2313:532020/10/2314:320.53.999.37-6.8710.90.50.57679P.O42.5393911117421722020/10/2314:342020/10/2315:130.53.989.37-6.8710.90.50.56677P.O42.5393911117521732020/10/2315:152020/10/2315:550.53.959.37-6.8710.80.50.57678P.O42.5404010817481742020/10/2315:572020/10/2316:360.53.999.37-6.8710.90.50.57680P.O42.5393911117621752020/10/2316:382020/10/2317:170.54.009.37-6.8710.90.50.57682P.O42.5393911117701762020/10/2317:182020/10/2317:570.54.029.37-6.8710.90.50.57679P.O42.5393911217901772020/10/2318:342020/10/2319:130.53.999.37-6.8710.90.50.57678P.O42.5393911117521782020/10/2319:152020/10/2319:550.53.989.37-6.8710.90.50.57678P.O42.5404010917951792020/10/2319:572020/10/2320:350.54.009.37-6.8710.90.50.56676P.O42.5383811417361802020/10/2320:362020/10/2321:16433.949.37-6.8710.80.50.56674P.O42.5404010817771812020/10/2321:182020/10/2321:570.54.029.37-6.8710.90.50.57679P.O42.5393911217321822020/10/2321:592020/10/2322:380.54.029.37-6.8710.90.50.57678P.O42.5393911217431832020/10/2322:402020/10/2323:190.54.029.37-6.8710.90.50.57683P.O42.5393911217531842020/10/2323:212020/10/240:000.53.949.37-6.8710.80.50.56677P.O42.539391111768施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—A杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)1852020/10/246:012020/10/246:390.54.029.37-6.8710.90.50.57682P.O42.5383811517501862020/10/246:412020/10/247:200.53.949.37-6.8710.80.50.56672P.O42.5393911117521872020/10/247:222020/10/248:010.54.029.37-6.8710.90.50.57679P.O42.5393911217741882020/10/248:032020/10/248:420.53.949.37-6.8710.80.50.56677P.O42.5393911117781892020/10/248:432020/10/249:210.53.979.37-6.8710.80.50.56676P.O42.5383811417571902020/10/249:232020/10/2410:020.53.979.37-6.8710.80.50.56677P.O42.5393911117931912020/10/2410:042020/10/2410:430.53.959.37-6.8710.80.50.56674P.O42.5393911117511922020/10/2410:452020/10/2411:250.53.959.37-6.8710.80.50.56671P.O42.5404010817851932020/10/2412:272020/10/2413:070.54.019.37-6.8710.90.50.56674P.O42.5404010917701942020/10/2413:082020/10/2413:460.53.959.37-6.8710.80.50.56671P.O42.5383811417801952020/10/2413:482020/10/2414:270.53.969.37-6.8710.80.50.56674P.O42.5393911117351962020/10/2414:292020/10/2415:090.53.969.37-6.8710.80.50.56674P.O42.5404010817531972020/10/2415:112020/10/2415:500.53.969.37-6.8710.80.50.56674P.O42.5393911117581982020/10/2415:522020/10/2416:310.53.949.37-6.8710.80.50.56677P.O42.5393911117751992020/10/2416:332020/10/2417:110.53.969.37-6.8710.80.50.56676P.O42.5383811417642002020/10/2418:132020/10/2418:520.54.019.37-6.8710.90.50.57678P.O42.5393911217832012020/10/2418:542020/10/2419:340.53.989.37-6.8710.90.50.56677P.O42.5404010917512022020/10/2419:362020/10/2420:140.54.029.37-6.8710.90.50.56674P.O42.5383811517932032020/10/2420:172020/10/2420:560.54.029.37-6.8710.90.50.57678P.O42.5393911217262042020/10/2420:572020/10/2421:36434.029.37-6.8710.90.50.57679P.O42.539391121787施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—A杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)692020/10/196:532020/10/197:320.54.029.37-6.8710.90.50.57679P.O42.539391121783702020/10/197:342020/10/198:140.54.029.37-6.8710.90.50.56677P.O42.540401091762712020/10/198:162020/10/198:560.53.939.37-6.8710.80.50.56676P.O42.540401081743722020/10/198:582020/10/199:380.54.029.37-6.8710.90.50.57680P.O42.540401091762732020/10/199:402020/10/1910:200.53.979.37-6.8710.80.50.56676P.O42.540401081756742020/10/1910:222020/10/1911:000.54.029.37-6.8710.90.50.57680P.O42.538381151774752020/10/1911:012020/10/1911:400.54.029.37-6.8710.90.50.57682P.O42.539391121746762020/10/1911:422020/10/1912:210.54.029.37-6.8710.90.50.57679P.O42.539391121778772020/10/1913:212020/10/1913:590.54.029.37-6.8710.90.50.57684P.O42.538381151749782020/10/1914:012020/10/1914:400.54.009.37-6.8710.90.50.57679P.O42.539391111778792020/10/1914:422020/10/1915:210.53.969.37-6.8710.80.50.56676P.O42.539391111742802020/10/1915:222020/10/1916:000.53.949.37-6.8710.80.50.56674P.O42.538381141755812020/10/1916:022020/10/1916:410.53.989.37-6.8710.90.50.57679P.O42.539391111755822020/10/1916:422020/10/1917:210.53.999.37-6.8710.90.50.56676P.O42.539391111773832020/10/1917:232020/10/1918:020.54.009.37-6.8710.90.50.57678P.O42.539391111761842020/10/1918:232020/10/1919:020.53.939.37-6.8710.80.50.56671P.O42.539391111778852020/10/1919:042020/10/1919:440.53.979.37-6.8710.80.50.56676P.O42.540401081753862020/10/1919:462020/10/1920:250.53.939.37-6.8710.80.50.56677P.O42.539391111779872020/10/1920:272020/10/1921:060.53.939.37-6.8710.80.50.57682P.O42.539391111719882020/10/1921:072020/10/1921:45433.949.37-6.8710.80.50.56673P.O42.538381141784892020/10/1921:472020/10/1922:260.53.959.37-6.8710.80.50.56677P.O42.539391111743902020/10/1922:282020/10/1923:060.53.999.37-6.8710.90.50.57679P.O42.538381141740912020/10/1923:082020/10/1923:470.53.999.37-6.8710.90.50.56676P.O42.539391111765施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—B杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)922020/10/206:482020/10/207:270.53.959.37-6.8710.80.50.57678P.O42.539391111780932020/10/207:292020/10/208:080.53.979.37-6.8710.80.50.56674P.O42.539391111780942020/10/208:102020/10/208:490.53.959.37-6.8710.80.50.56676P.O42.539391111738952020/10/208:512020/10/209:290.53.939.37-6.8710.80.50.56676P.O42.538381141772962020/10/209:312020/10/2010:110.54.019.37-6.8710.90.50.57679P.O42.540401091765972020/10/2010:132020/10/2010:520.54.029.37-6.8710.90.50.57679P.O42.539391121799982020/10/2010:532020/10/2011:320.53.969.37-6.8710.80.50.56676P.O42.539391111748992020/10/2011:342020/10/2012:130.53.999.37-6.8710.90.50.56676P.O42.5393911117861002020/10/2012:452020/10/2013:250.53.959.37-6.8710.80.50.56674P.O42.5404010817601012020/10/2013:272020/10/2014:060.53.939.37-6.8710.80.50.56677P.O42.5393911117761022020/10/2014:072020/10/2014:460.53.989.37-6.8710.90.50.56673P.O42.5393911117321032020/10/2014:482020/10/2015:270.54.029.37-6.8710.90.50.57678P.O42.5393911217781042020/10/2015:292020/10/2016:080.53.949.37-6.8710.80.50.56673P.O42.5393911117661052020/10/2016:102020/10/2016:490.53.939.37-6.8710.80.50.56677P.O42.5393911117881062020/10/2016:522020/10/2017:310.53.999.37-6.8710.90.50.57679P.O42.5393911117671072020/10/2018:332020/10/2019:120.53.939.37-6.8710.80.50.56674P.O42.5393911117771082020/10/2019:142020/10/2019:530.53.989.37-6.8710.90.50.57678P.O42.5393911117531092020/10/2019:552020/10/2020:350.53.939.37-6.8710.80.50.57678P.O42.5404010817821102020/10/2020:372020/10/2021:160.54.009.37-6.8710.90.50.56677P.O42.5393911117221112020/10/2021:172020/10/2021:57433.999.37-6.8710.90.50.57679P.O42.5404010917831122020/10/2021:582020/10/2022:370.53.999.37-6.8710.90.50.57678P.O42.5393911117401132020/10/2022:392020/10/2023:180.53.939.37-6.8710.80.50.56672P.O42.5393911117501142020/10/2023:212020/10/2023:590.54.009.37-6.8710.90.50.57682P.O42.538381141769施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—B杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)1152020/10/217:002020/10/217:380.54.019.37-6.8710.90.50.56673P.O42.5383811517511162020/10/217:402020/10/218:180.53.959.37-6.8710.80.50.56676P.O42.5383811417791172020/10/218:202020/10/218:590.54.019.37-6.8710.90.50.57680P.O42.5393911217421182020/10/219:012020/10/219:390.53.959.37-6.8710.80.50.56677P.O42.5383811417661192020/10/219:412020/10/2110:200.53.949.37-6.8710.80.50.56677P.O42.5393911117711202020/10/2110:222020/10/2111:010.54.029.37-6.8710.90.50.57678P.O42.5393911217991212020/10/2111:022020/10/2111:410.54.029.37-6.8710.90.50.57680P.O42.5393911217521222020/10/2111:432020/10/2112:210.53.959.37-6.8710.80.50.56676P.O42.5383811417991232020/10/2112:552020/10/2113:350.54.019.37-6.8710.90.50.57683P.O42.5404010917531242020/10/2113:372020/10/2114:170.54.019.37-6.8710.90.50.57679P.O42.5404010917751252020/10/2114:182020/10/2114:580.53.949.37-6.8710.80.50.56672P.O42.5404010817351262020/10/2115:002020/10/2115:400.54.009.37-6.8710.90.50.57678P.O42.5404010917551272020/10/2115:422020/10/2116:220.53.999.37-6.8710.90.50.57678P.O42.5404010917491282020/10/2116:242020/10/2117:020.53.949.37-6.8710.80.50.56674P.O42.5383811417641292020/10/2117:042020/10/2117:430.53.949.37-6.8710.80.50.56674P.O42.5393911117611302020/10/2117:452020/10/2118:250.53.939.37-6.8710.80.50.56671P.O42.5404010817871312020/10/2118:592020/10/2119:370.53.999.37-6.8710.90.50.57682P.O42.5383811417531322020/10/2119:392020/10/2120:190.53.959.37-6.8710.80.50.56672P.O42.5404010817881332020/10/2120:212020/10/2120:590.53.979.37-6.8710.80.50.56676P.O42.5383811417161342020/10/2121:002020/10/2121:40433.959.37-6.8710.80.50.57679P.O42.5404010817811352020/10/2121:422020/10/2122:220.54.029.37-6.8710.90.50.57683P.O42.5404010917351362020/10/2122:242020/10/2123:030.54.009.37-6.8710.90.50.56677P.O42.539391111754施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—B杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)2052020/10/226:032020/10/226:410.54.009.37-6.8710.90.50.57678P.O42.5383811417572062020/10/226:432020/10/227:230.53.949.37-6.8710.80.50.56674P.O42.5404010817632072020/10/227:252020/10/228:040.54.029.37-6.8710.90.50.57678P.O42.5393911217692082020/10/228:062020/10/228:460.54.029.37-6.8710.90.50.57679P.O42.5404010917532092020/10/228:482020/10/229:280.53.969.37-6.8710.80.50.57678P.O42.5404010817592102020/10/229:302020/10/2210:080.53.989.37-6.8710.90.50.56676P.O42.5383811418002112020/10/2210:092020/10/2210:490.53.979.37-6.8710.80.50.56677P.O42.5404010817542122020/10/2210:522020/10/2211:300.53.959.37-6.8710.80.50.56674P.O42.5383811417882132020/10/2212:312020/10/2213:090.53.949.37-6.8710.80.50.56674P.O42.5383811417682142020/10/2213:102020/10/2213:490.53.949.37-6.8710.80.50.56677P.O42.5393911117832152020/10/2213:512020/10/2214:290.53.989.37-6.8710.90.50.56677P.O42.5383811417362162020/10/2214:312020/10/2215:100.53.949.37-6.8710.80.50.56676P.O42.5393911117472172020/10/2215:122020/10/2215:510.54.029.37-6.8710.90.50.57678P.O42.5393911217732182020/10/2215:532020/10/2216:320.54.029.37-6.8710.90.50.57678P.O42.5393911217472192020/10/2216:342020/10/2217:140.53.949.37-6.8710.80.50.56674P.O42.5404010817692202020/10/2217:152020/10/2217:550.54.029.37-6.8710.90.50.57680P.O42.5404010917892212020/10/2218:362020/10/2219:140.53.959.37-6.8710.80.50.56677P.O42.5383811417512222020/10/2219:162020/10/2219:560.53.939.37-6.8710.80.50.56673P.O42.5404010817962232020/10/2219:582020/10/2220:370.53.999.37-6.8710.90.50.57680P.O42.5393911117372242020/10/2220:382020/10/2221:16433.949.37-6.8710.80.50.56674P.O42.5383811417772252020/10/2221:182020/10/2221:570.53.969.37-6.8710.80.50.56674P.O42.5393911117452262020/10/2221:592020/10/2222:390.54.029.37-6.8710.90.50.57678P.O42.5404010917582272020/10/2222:412020/10/2223:200.53.969.37-6.8710.80.50.56676P.O42.5393911117812282020/10/2223:222020/10/230:020.53.989.37-6.8710.90.50.56676P.O42.540401091749施工区域或里程:K1+525~K1+625左岸桩顶高程:2.50m桩基编号:4#桩机—B杆水泥土搅拌桩施工记录表工程名称:汕头市潮阳区谷饶涝区官田坑(大坑桥~省道段)综合治理工程桩号开始时间结束时间桩径(m)地面高程(m)有效桩长(m)桩底高程(m)施工桩长(m)水灰比水泥浆体积(m3)水泥用量(kg)水泥品种及等级施工时间(min)喷浆时间(min)下沉速度(cm/min)泥浆比重(kg/m3)2292020/10/236:032020/10/236:420.53.999.37-6.8710.90.50.56677P.O42.5393911117592302020/10/236:442020/10/237:230.54.029.37-6.8710.90.50.57679P.O42.5393911217752312020/10/237:252020/10/238:050.53.959.37-6.8710.80.50.56677P.O42.5404010817512322020/10/238:072020/10/238:470.54.029.37-6.8710.90.50.57679P.O42.5404010917462332020/10/238:482020/10/239:270.53.959.37-6.8710.80.50.56677P.O42.5393911117682342020/10/239:292020/10/2310:070.53.939.37-6.8710.80.50.56671P.O42.5383811417892352020/10/2310:092020/10/2310:470.53.969.37-6.8710.80.50.56676P.O42.5383811417482362020/10/2310:492020/10/2311:280.53.989.37-6.8710.90.50.57679P.O42.5393911117772372020/10/2312:312020/10/2313:110.53.999.37-6.8710.90.50.57678P.O42.5404010917712382020/10/2313:122020/10/2313:510.53.949.37-6.8710.80.50.56676P.O42.5393911117872392020/10/2313:532020/10/2314:320.53.999.37-6.8710.90.50.56677P.O42.5393911117432402020/10/2314:342020/10/2315:130.53.989.37-6.8710.90.50.57678P.O42.5393911117672412020/10/2315:152020/10/2315:550.53.959.37-6.8710.80.50.57678P.O42.5404010817602422020/10/2315:572020/10/2316:360.53.999.37-6.8710.90.50.57678P.O42.5393911117682432020/10/2316:382020/10/2317:170.54.009.37-6.8710.90.50.56677P.O42.5393911117572442020/10/2317:182020/10/2317:570.54.029.37-6.8710.90.50.57682P.O42.5393911217792452020/10/2318:342020/10/2319:130.53.999.37-6.8710.90.50.57680P.O42.5393911117502462020/10/2319:1
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 吉安市井开区保育院2026年招聘夜班安保员笔试题库含答案详解(完整版)
- 护理人员针头刺伤的急救知识
- 2026湖北恩施州鹤峰巧才劳务派遣有限公司招聘工作人员11人备考题库附参考答案详解(完整版)
- 四川护理职业学院2026年7月编外工作人员招聘启事笔试题库含答案详解【黄金题型】
- 护理沟通中的信息管理
- 氧疗在呼吸系统疾病中的应用
- (2026年)降低手术患者呼吸功能锻炼的不规范率课件
- 护理信息技术培训
- 护理实践中的临床决策
- 护理课件软件特色功能介绍
- 办公自动化技术(Windows10+Office2016+AI)-教学教案
- 青海省西宁市2024-2025学年七年级下学期期末历史试题 (含答案)
- 清远岭南文化课件下载
- 2024年内蒙古呼伦贝尔农垦集团有限公司招聘真题
- 夏季脑血管病预防
- DL-T5181-2017水电水利工程锚喷支护施工规范
- 《职业卫生》模拟考试题与参考答案
- 【课件】半偏法测量电表内阻(课件)
- 重庆市国企招聘考试真题及答案
- 碧桂园-物业保洁综合技能培训课件
- 《美国1787年宪法》实用的教学设计
评论
0/150
提交评论