标准解读

《GB/T 48155-2026 分段桥塞与分簇射孔联合作业技术规范》是一项国家标准,旨在为油气田开发中采用的分段桥塞技术和分簇射孔技术相结合的操作提供指导。该标准详细规定了从作业准备到完成整个过程的技术要求、安全措施及质量控制方法,适用于陆上和海上油田的完井与增产改造工程。

在作业前准备阶段,标准明确了所需设备、工具及其性能参数的选择依据;对参与人员提出了专业技能要求,并强调了培训的重要性。同时,还规定了环境条件评估、风险分析以及应急预案制定等前期准备工作内容。

对于实际操作流程,《GB/T 48155-2026》给出了详细的步骤说明,包括但不限于桥塞定位、安装、固井材料选择与配比、射孔枪下入方式、引爆顺序等关键环节的具体实施方法。此外,还特别指出了不同地质条件下可能遇到的问题及应对策略。

在质量管理方面,该标准强调了全过程监控的重要性,要求通过实时监测数据来调整施工方案以确保最终效果达到预期目标。同时,也对验收标准进行了明确规定,确保每一项工作都符合既定的技术指标。

安全是贯穿整个标准的重要主题之一。除了常规的安全防护措施外,《GB/T 48155-2026》还特别针对高压作业环境下的特殊安全要求做出了具体指示,比如如何正确处理易燃易爆物质、防止井喷事故的发生等方面都有详尽的规定。


如需获取更多详尽信息,请直接参考下方经官方授权发布的权威标准文档。

....

查看全部

  • 即将实施
  • 暂未开始实施
  • 2026-08-28 颁布
  • 2027-03-01 实施
©正版授权
GB/T 48155-2026分段桥塞与分簇射孔联合作业技术规范_第1页
GB/T 48155-2026分段桥塞与分簇射孔联合作业技术规范_第2页
GB/T 48155-2026分段桥塞与分簇射孔联合作业技术规范_第3页
GB/T 48155-2026分段桥塞与分簇射孔联合作业技术规范_第4页
GB/T 48155-2026分段桥塞与分簇射孔联合作业技术规范_第5页
免费预览已结束,剩余15页可下载查看

下载本文档

GB/T 48155-2026分段桥塞与分簇射孔联合作业技术规范-免费下载试读页

文档简介

ICS73.020

CCSE12

中华人民共和国国家标准

GB/T48155—2026

分段桥塞与分簇射孔联合作业技术规范

Technicalspecificationforbridgeplugsettingandclusterperforatingoperation

2026⁃08⁃28发布2027⁃03⁃01实施

国家市场监督管理总局

国家标准化管理委员会发布

GB/T48155—2026

目次

前言··························································································································Ⅲ

1范围·······················································································································1

2规范性引用文件········································································································1

3术语和定义··············································································································1

4作业条件要求···········································································································2

4.1井场要求···········································································································2

4.2井筒要求···········································································································2

4.3井口要求···········································································································2

4.4桥塞射孔联作主要设备要求···················································································2

5施工设计要求···········································································································3

5.1概述·················································································································3

5.2井的基本信息·····································································································3

5.3施工工序···········································································································3

5.4射孔器材、工具及设备选择·····················································································3

5.5桥塞和坐封工具选择····························································································4

5.6工具串弱点设置··································································································4

5.7泵送参数和泵送程序设计······················································································4

5.8风险分析及处置措施····························································································4

5.9施工设计HSE要求······························································································4

6现场施工要求···········································································································5

6.1施工准备···········································································································5

6.2安装电缆防喷装置和试压······················································································5

6.3组装射孔器········································································································5

6.4组装桥塞坐封工具及桥塞或泵送环··········································································5

6.5连接入井工具串··································································································5

6.6工具串入井········································································································6

6.7校深定位···········································································································6

6.8点火作业···········································································································6

6.9起出入井工具串··································································································6

7资料记录与归档········································································································6

8HSE要求················································································································7

附录A(资料性)常用电缆防喷装置配置图·······································································8

附录B(资料性)射孔器类型选择推荐表···········································································9

GB/T48155—2026

B.1射孔器类型选择推荐表·························································································9

B.2射孔器炸药类型选择推荐表···················································································9

B.3套管变形井段射孔枪型选择推荐表··········································································9

附录C(资料性)工具串配重计算方法············································································10

附录D(资料性)桥塞射孔联作现场施工报告格式·····························································11

参考文献····················································································································12

GB/T48155—2026

前言

本文件按照GB/T1.1—2020《标准化工作导则第1部分:标准化文件的结构和起草规则》的规

定起草。

请注意本文件的某些内容可能涉及专利。本文件的发布机构不承担识别专利的责任。

本文件由全国石油天然气标准化技术委员会(SAC/TC355)提出并归口。

本文件起草单位:中国石油集团测井有限公司、中国石油天然气股份有限公司西南油气田分公司、

中石化经纬有限公司、中国石油集团川庆钻探工程有限公司、大庆油田有限责任公司、中海油田服务股

份有限公司、北京石油机械有限公司、西南石油大学。

本文件主要起草人:唐凯、马自强、曾波、叶亮、张平、赵容容、蔡山、盛廷强、任国辉、杨登波、

董明达、宋毅、刘子平、俞海、张勇、胡刚、董拥军、石化国、张清彬、陆应辉、孙志忠、扈勇。

GB/T48155—2026

分段桥塞与分簇射孔联合作业技术规范

1范围

本文件规定了分段桥塞与分簇射孔联合作业条件、施工设计、现场施工、资料记录与归档及健康安

全环保(HSE)的要求。

本文件适用于油气井分段桥塞与分簇射孔联合作业,分簇射孔单项作业参照执行。

2规范性引用文件

下列文件中的内容通过文中的规范性引用而构成本文件必不可少的条款。其中,注日期的引用文

件,仅该日期对应的版本适用于本文件;不注日期的引用文件,其最新版本(包括所有的修改单)适用于

本文件。

GB

温馨提示

  • 1. 本站所提供的标准文本仅供个人学习、研究之用,未经授权,严禁复制、发行、汇编、翻译或网络传播等,侵权必究。
  • 2. 本站所提供的标准均为PDF格式电子版文本(可阅读打印),因数字商品的特殊性,一经售出,不提供退换货服务。
  • 3. 标准文档要求电子版与印刷版保持一致,所以下载的文档中可能包含空白页,非文档质量问题。

评论

0/150

提交评论