版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、in which we have developed our knowledge and learn our skills.,恶劣气候下我们的施工设备经受了考验,NRS 公司的挂蓝,MSS造桥机,LG预制拼装系统以其高效,经济闻名于世,我们已经为全世界各地300多座大型桥梁提供了施工设备。,挪威NRS公司,挪威NRS公司以其丰富的经验为世界各地大型桥梁施工项目提供服务。,挪威NRS公司,我们的主要产品:,挂蓝(建桥者) 现浇混凝土及预制节块桥梁. 造桥机 (MSS) 现浇混凝土桥梁(上行式及下行式) 预制节块拼装系统 (LG) 预制节块施工 上行式及下行式,挂 蓝,预制节块拼装用挂蓝,上行式M
2、SS造桥机,下行式MSS造桥机,上行式预制拼装系统,下行式预制拼装系统,适用范围,MSS 造桥机 跨度 15 - 80 m 一般适用长度 500m 以上 施工周期/孔6 10 天,适用范围,LG 预制拼装系统 跨径: 20 100m 一般施工长度: 最少 600 - 800 节块 一般施工周期/孔1-2 天 / 孔,适用范围,BB 建桥者挂蓝 跨度: 60 300m 一般施工周期:2 x 1 节段 / 周,建桥者挂蓝,现浇混凝土桥梁用挂蓝,标准建桥者挂蓝每次浇注节段长度为5米,荷载(混凝土+模板)为100-600吨,用钢量为25吨-110吨。 标准建桥者可适用于几乎各种桥梁断面。当桥梁宽度,节
3、段高度,翼板厚度发生变化时调整十分方便。,一般适用节块长度为3-5米,重量100-400吨。使用液压系统推进。横坡纵坡均可调整。 预制节块拼装挂蓝几乎可适用于未来项目的任何断面。,预制节块拼装用挂蓝,世界跨度最长的混凝土悬臂梁桥,重量轻:The use of rectangular hollow sections in the main structural components and recoverable high strength bars in all stays and ties reduces the total steel weight to a minimum. 使用灵活:T
4、he Bridgebuilder may be adapted to almost any cross-section and is easily adjustable during operation to variations in segment length, box height, web thickness, deck width and road alignment (gradient, curvature, super-elevations). 挠度小:The vertical deflection at the front of the Bridgebuilder is le
5、ss than 25 mm at maximum load. Formwork beams are designed for a maximum deflection of L/400 of their length. 安装快捷:One Bridgebuilder may be assembled in one week. Rolling forward on rails, the reset time is short.,建桥者挂蓝主要特点:,现浇混凝土建桥者,主轨,液压油缸,建桥者主要组成部分,前后工作车,主轨,液压油缸,建桥者挂蓝,前后工作车,主轨,液压油缸,建桥者挂蓝的主要组成部分,N
6、RS AS,主框架,前后工作车,主轨,液压油缸,建桥者的主要组成部分,NRS AS,主框架,前后框架,底框架,横梁,内模,前后工作车,主轨,液压油缸,建桥者的主要组成部分,NRS AS,主框架,前后框架,底框架,横臂,内模,外模,底模,内模,前后工作车,主轨,液压油缸,The Bridgebuilder - Components,NRS AS,主框架,前后工作车,底框架,横梁,液压油缸,内模,外模,底模,内模,端模,工作平台,建桥者挂蓝,建桥者挂蓝施工程序:,挂蓝除内模部分移动到新的混凝土浇注位置。 调整外模,并将其固定。 底板及翼板钢筋绑扎 内模推进 顶板钢筋绑扎 底板及翼板混凝土浇注,顶板
7、混凝土在间隔一定时间后浇注,也可在第二天浇注。 养护完成后张拉。 松开模板,推进挂蓝。多数情况下施工周期为1周,也有4-5天的实例。,用于小墩顶施工的建桥者,在墩顶长度仅为3米的情况下用挂蓝施工的方法。,第一步: 在3米长的墩顶上安装,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantileveri
8、ng from pier heads as small as 3 m. The procedure is illustrated through the above 4 phases.,第二步: 在墩顶两侧浇注混凝土,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from p
9、ier heads as small as 3 m. The procedure is illustrated through the above 4 phases.,第三步: 将建桥者分开,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as
10、small as 3 m. The procedure is illustrated through the above 4 phases.,第三步: 将建桥者分开,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m.
11、 The procedure is illustrated through the above 4 phases.,第四步: 完成12米墩顶混凝土,可进行标准挂蓝施工,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m
12、. The procedure is illustrated through the above 4 phases.,第四步 完成12米墩顶混凝土,可进行标准挂蓝施工,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m
13、. The procedure is illustrated through the above 4 phases.,第四步 完成12米墩顶混凝土,可进行标准挂蓝施工,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m
14、. The procedure is illustrated through the above 4 phases.,第四步 完成12米墩顶混凝土,可进行标准挂蓝施工,建桥者用于小墩顶施工,When the pier head is too small to allow normal assembly of the Bridgebuilder, our patented Cross-member solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m
15、. The procedure is illustrated through the above 4 phases.,第四步 完成12米墩顶混凝土,可进行标准挂蓝施工,Stolmasundet Bridge, Norway 目前世界挂蓝施工的跨度最长的混凝土桥梁 主孔: 301 m 桥宽: 12,1 m 最大荷载 :160 tons 施工周期:2 x 1 segment per week,Puente Internacional sobre el Rio Guadiana, Spain/Portugal 最大荷载 :155 tons 最大桥梁宽度: 18 m 最大箱梁宽度:11 m 最大浇注长度:4,5 m,Varodd Bridge, 挪威,Seo Hae, 韩国,Wadi Akbara Bridge, 以色列 最大跨度:80 m 最大荷载 :150 tons 最大桥宽: 13,7 m 最大箱梁宽度:5,5 m 最大节段长度:4,5
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年教师职称考试(特殊教育)历年参考题库含答案详解
- 2025康复医学科三基考试题库及答案
- 2025年安全生产事故案例分析及事故处理流程培训试卷及答案
- 消防安全工作自查报告
- 2025年安全生产月电气测试试题及答案
- 工业机器人系统操作员(三级)职业鉴定理论考试题及答案(新版)
- 2025年人工智能应用技术考试试卷及答案
- 建设工程施工合同纠纷要素式起诉状模板要素清晰无混淆
- 2026年动物园管理提升
- 2026 年无子女离婚协议书正规模板
- 上海建桥学院简介招生宣传
- 《智慧教育黑板技术规范》
- 《电力建设安全工作规程》-第1部分火力发电厂
- 歌曲《我会等》歌词
- 八年级物理上册期末测试试卷-附带答案
- 小学英语五年级上册Unit 5 Part B Let's talk 教学设计
- 老年痴呆科普课件整理
- 学生校服供应服务实施方案
- GB/T 22900-2022科学技术研究项目评价通则
- 自动控制系统的类型和组成
- GB/T 15171-1994软包装件密封性能试验方法
评论
0/150
提交评论