英文版新能源发电系统.ppt_第1页
英文版新能源发电系统.ppt_第2页
英文版新能源发电系统.ppt_第3页
英文版新能源发电系统.ppt_第4页
英文版新能源发电系统.ppt_第5页
已阅读5页,还剩10页未读, 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、 Design hybrid renewable Power System Prepared for: Robert McIntosh (Chisholm Institute)Prepared by: Name :Hui RongHUI (2512118 Jim)Name :Wang ChaoJie(2512119Jack)Date:18 March 2014Xian Electric Power CollegeClass 25121 Teacher: Robert 罗伯特Design Hybrid Power Systems UEENEEK033B1.0 TABLE OF CONTENTS

2、1.0 TABLE OF CONTENTS22.0 ABSTRACT3.0 INTRODUCTION3.1 Aim3.2 Authorisation3.3 Scope3.4 The problem4.0 DESIGN OF HYBRID POWER SYSTEM64.1 Output Requirements for the Power System64.1.1 Block diagram for the hybrid design64.1.2 Battery storage size required64.2 Input Generation available74.2.1 Converti

3、ng available solar insolation into kWhr/day74.2.2 Converting available wind energy into kWhr/day94.2.3 Converting available hydro power into kWhr/day104.2.4 Sizing a genset to provide kWhr/day104.2.5 Energy available at each position kWhr/day114.4 The favoured generation Mix4.4.1 Chosen Input Genera

4、tion and Energy available in kWhr/day4.4.2 System sizing of generation4.5 Other required components4.5.1 Control system4.5.2 Battery Storage5.0 CONCLUSION6.0 RECOMMENDATIONS7.0 REFEREENCES8.0 APPENDICES8.1 APPENDIX ABattery Storage8.2 APPENDIX BSolar Panel8.3 APPENDIX CWind Generation Diagram AimIn

5、order to deal with commuters to have reliable mobile telecommunication networks that they across the railway, We need wind power .solar power and water power to design hybrid renewable power systems.IntroduceAccording to research. We need wind. and equipment are 1KW Wind Turbine Generator Controller

6、 Tower mountingsolar: equipment includes high quality solar modules with 25 year warranty. And solar module mounting frames in addition LCD display with data logging maximum power point tracking solar booster solar module tracking frames.ScopeDepending on the new railway lines, And the hybrid renewa

7、ble power systems lives near here.The problem Difficult to control the climate and exhaust noise.Conventional hydro requires the flooding of lacking large areas of land, and battery cost and inverter cost. According to research, we can learn that Remote districts use electricity the load not to be a

8、ll big generally, therefore is uneconomical with the electrical network power transmission, directly generates electricity commonly used in the locality uses the diesel electric engine. But the diesel oil storage and transport too is high to the remote districts cost, therefore the diesel electric e

9、ngine only can take one kind of short-time emergency power supply, Must solve the long-term stability reliable power supply problem, only can rely on local the natural energy source. The solar energy gentle breeze can be most universal and the water power, Solar power Accord to solar data, we use so

10、lar power in summer from eleven oclock to fourteen every day and winter time is from eleven oclock to thirteen In order to good use of wind power, We learn that sometimes the wind speed is the highest in Autumn, on the contrary, the wind have the least spring The water system transmits power from th

11、e turbine shaft to the generator shaft or the shaft powering another device, and as the voltage is very high wiring can be kept to a minimum and the wiring can be run over a longer distance due to the higher voltage 4.0 DESIGN OF HYBRID POWER SYSTEM 4.1 Output Requirements for the Power SystemThe ma

12、ximum total energy requirements by the telecommunication transmitter site is 1kWhr / day.Typically most telecommunictions infrastructure works on 48VDCThe maximum current for thie output equipment would be under 10 AmpsThe design will incorporate storage of energy for 3 days in the case for lack of

13、generation from all of the inputs4.1.1 Block diagram for the hybrid design4.1.2 Battery storage size requiredTo calculate the size of the battery bank required we converted the toatal daily energy consumption in Watt-hours to Amp-hours. Then multiply this by the required number of days storage plus

14、one additional days energy useFor this location we factor 3 days storageSee appendix A for typicl battery types to be usedPosition on MountainEnergy Resource AvailableResources available summerResources available winterTop (point E)Solar power350Wh/m2 for 7 hours /day450Wh/m2 for 6hours /dayWind Pow

15、er8m/s for 3 hours / day10 m/s for 4 hours / dayMid (point F)Solar power240Wh/m2 for 5 hours /day2110Wh/m2 for 6 hours /dayWind Power10m/s for 3 hours / day14 m/s for 4 hours / day Lower (point G)Solar power220Wh/m2 for 5 hours /day30Wh/m2 for 1 hours /dayWind Power3m/s for 3 hours / day2 m/s for 4

16、hours / dayHydro power 300L/min300L/min10L/min*4.2 Input Generation available* for 2 months the flow is reduced to 10L/min Diesel generation can / cannot be used as backup power source.4.2.1 Converting available solar insolation into kWhr/dayConverting the values of Wh/m2 into kWh/daySUMMER40Wh/m2 f

17、or 5 hours per day(5/24 hours = 0.2days)The amount of energy available for solar power depends upon the area (m2) of the PV arraySo at 40Wh/m2 for 5 hours per dayFor the solar PV array to provide all of the energy for one day (1kWh/day) will require 50 m2 of solar panels (about half a size of a hous

18、e)WINTER 50Wh/m2 for 1 hour per day(1/24 hours = 0.04days)For the solar PV array to provide all of the energy for one day (1kWh/day) will require 500 m2 of solar panels (about 4-5 house sizes)4.2.2 Converting available wind energy into kWhr/dayWind energy per day that is available at each site is ca

19、lculated using the following equation Co=0.3 for a 3 blade turbine A = area of bladesv= average velocity of the windrair = 1.21 kg/m3= (Air density)For a wind generator in 10 m/s wind (3 hours per day) to produce 1kWh/day the Area of the blades needs to be as followsRadius / diameter of blade A 7.5

20、m diameter blade wind turbine (approximately 7.5kW) can supply enough energy to the system for one day operation4.2.3 Converting available hydro power into kWhr/dayQ = flow rate L/sG = gravity 9.81 (m/s)H is usable head (m)A the stream flow of 300L/min is available 24 hours a day except in the winte

21、r months where two months of flow is heavily reduced to 10L/minThere is plenty of head and power available from the water resource in the summerIn the winter4.2.4 Sizing a genset to provide kWhr/day38 MJ/LPosition on MountainSize of Energy converter neededEnergy available summerEnergy available wint

22、erTop (point E)Wind Power ( 7.8 m diameter)8.5kWh/day8.6kWh/dayLower (point G)Hydro power 11 kWh/day0.5 kWh/day4.2.5 Energy available at each position kWhr/dayPosition on MountainSize of Energy converter neededEnergy available summerEnergy available winterTop (point E)Solar power( 350 m2)7.5kWh/day8

23、.4kWh/dayWind power(120 m diameter)10kWh/day11kWh/dayMid (point F)Wind Power( 76 m diameter)5.7kWh/day6.3kWh/dayLower (point E)Solar power(230 m2)8kWh/daykWh/daykWh/dayWind Power( 160 m diameter)8KWh/day7.8kWh/dayHydro power 11 kWh/day11 kWh/day*0.4 kWh/dayConclusion Make good use of source can improve the source efficiency Control the power delivery to the loadsReduce the battery costBased on environment, adjust the source Additional generation can be added ea

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论