版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、,A STRATEGY FOR PERFORMANCE EXCELLENCE,SMED,( One Step Setup),Set-up and changeover reductions for equipment, tooling and machines.,Executive Overview,Participant manual,Tools Workbook,Knowledge Breakthrough,Lecture notes,Lecture notes,Performance Excellence Series Training Module Elements,Session 1
2、.0Introduction. 4 Session 2.0Waste Management . 12 Session 3.0Setup Practices. 22 Session 4.0Traditional /Strategic Setup Approach 29 Session 5.0SMED Implementation Planning. 34 Element 5.1 Implementation Team 36 Element 5.2Implementation Plan. 37 Element 5.3Communication Plan. 38 Element 5.4Trainin
3、g Plan. 40 Element 5.5One Step Setup. 42 Element 5.5.1Separate Internal from External Setup 44 Element 5.5.2Integrating Internal into External Setup. 49 Element 5.5.3 Reducing Setup Processing Time. 63 Element 5.5.4Optimizing Setup Processes. 92 Element 5.6Verification & Standardization 95 Session 6
4、.0Summary 105,Table of Contents Knowledge Breakthrough,SMED,SMED is Continuous Improvement,It is a customer driven requirement. Customers are demanding: Product and service diversity Lower costs Higher reliability and quality. In essence organizations need to become leaner ! So organizations must: P
5、roduce smaller lots, more frequently. Expand the scope and diversity of products and services. Reduce quality defects.,Ultimately, SMED focuses on reducing changeover and set-up times, thus enabling organizations to:,Produce smaller lots of products and services more frequently ! Develop a broader s
6、cope of products and services ! Reduce quality defects towards zero !,Meet Customers Expectations !,What Does Set-up/changeover reduction mean for my business?,Increased customer service levels and profits ! Via Waste Elimination resulting in: Reduced Lead Times-Faster Delivery Zero Inventories-Redu
7、ced Working Capital Improved Quality Improved Safety Smaller lots of products-flexibility Diversified Product & Service Options,To eliminate the wastes that result from “uncontrolled” processes increasing inventories and lead times. To gain control on equipment, material & inventory. Apply Control T
8、echniques to Eliminate Erosion of Improvements. Standardize Improvements for Maintenance of Critical Set-up Parameters.,Look Familiar?,Why SMED ?,MajorCPI Tools(6s) Kaizen LeanDescription Cp/Cpk 4Process capability assessment DOE 4Design of experiments SPC 4Process control based on statistics and da
9、ta analysis FMEA 4Risk assessment tool Regression 4Correlate effect one variable has on another Process Map 4 4 4Map process steps to communicate and identify opportunities 5 whys /2 hows 4 4 4 Determination methods for root cause discovery Pareto 4 4 4Column chart ranking items highest to lowest Fi
10、shbone 4 4 4Cause / Effect Diagram 5S 44Elimination waste Visual Mgmt 4 4 4Emphasis on visual techniques to manage process Poka-Yoke 4 4Error proofing techniques Spaghetti Chart 4 4 Kanban 4 4Material storage technique used to control process Takt Time 4 4Determine pace or beat of a process Std Work
11、 4 4Evaluate tasks done during a process SMED 4 4Single minute exchange of dies - Quick machine set up TPM 4Integrate maintenance strategy with process Cellular Flow 4Reduce inventory & cycle time through process layout and pull production techniques,Expand Process Improvement Program to Utilize Kai
12、zen Tool Kit,Tool Kit Comparison,Identify what types of internal and external setup times are involved in the following pictures.,Picture A: Wire Cutting Machine,Picture B: Metal Stamping Machine,Identify what types of internal and external setup & times are involved in the following pictures.,Pictu
13、re A: Wire Cutting Machine,Picture B: Metal Stamping Machine,_,_,Setup Type,Setup Type,Time ( Min),Time ( Min),Think Break,Internal External Setup,Classify Three items under each item category.,External,Internal,_,_,Which items would you convert from internal to external Setup ? _ Why? _,Think Break
14、,Traditional Setup Practices,Material movement occurs after the machine is turned off.,Detection of defects or missing equipment is noticed which the machine is running.,Defective tooling,fixtures, setup instruments are noticed after the machine is turned on.,Completed products are transferred to ne
15、xt operation. Raw material is moved after the machine is stopped.,Setup tooling delivered after the changeover has begun. Defective product identified after internal setup has begun.,The operator notices that equipment is missing after internal setup has begun.,Preparation - Ensures that all the too
16、ls are working properly and are in the right location. Mounting & Extraction - Involves the removal of the tooling after the production lot is completed and the placement of the new tooling before the next production lot. Establishing Control Settings - Setting all the process control settings prior
17、 to the production run. Inclusive of calibrations and measurements needed to make the machine, tooling operate effectively. First Run Capability - This includes the necessary adjustments( re-calibrations, additional measurements) required after the first trial pieces are produced. Setup Improvement-
18、 The time after processing during which the tooling, machinery is cleaned, identified, and tested for functionality prior to storage.,5 “Traditional”Setup Steps Defined,“Traditional”Setup Resource Consumption Analysis,Examples of wastes in a traditional setup !,What kind of “setup wastes” can you id
19、entify in this pictures ? _,Think Break,Separate Internal from External Setup,Optimizing Setup Processes,Integrate Internal into External Setup,Reduction of Setup Processes,One Step Setup Implementation Plan,Progressive Enhancements,Step 2 Develop Specific Implementation Plan,Step 3 Develop Communic
20、ation Plan,Step 4 Develop One Step Setup Training Plan,Step 5 Implement One Step Set-up,Step 6 Verification / Standardization,Step 1 Develop One Step Setup Implementation Team,Phase 2,Combining equipment functionality,Involves standardizing the equipment ( parts, tooling, processes) based on commonality between setups to reduce the number of setup steps and cycle times.,The common setup parts were identified and replaced with this jig/holder combination.,Notice how different quantities of the same part can be setup with the same fixture. Also, these setup
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年焦作市烟草专卖局人员招聘考试备考试题及详细答案解析
- 2026年青岛城市发展集团有限公司人员招聘考试备考试题及详细答案解析
- 2026年平顶山市烟草专卖局人员招聘考试模拟试题及详细答案解析
- 2026年扬州市烟草专卖局人员招聘笔试备考题库及详细答案解析
- 2026年中国烟草总公司贵州省公司人员招聘考试模拟试题及详细答案解析
- 2026年黄冈市烟草专卖局人员招聘笔试模拟试题及详细答案解析
- 2026年淮北矿业集团有限责任公司人员招聘参考题库及详细答案解析
- 2026年中国烟草总公司海南省公司人员招聘笔试参考试题及详细答案解析
- 2026年车载显示屏行业洞察报告及未来五至十年发展趋势报告
- 2026年中石化福建石油分公司人员招聘笔试参考试题及详细答案解析
- 卡丁车赛车场项目可行性研究报告
- 浙江省杭州市2026届高三上学期教学质量检测数学试卷(杭州一模)(含答案)
- 康复护理:日常生活活动能力训练
- 第二届重庆市市场监管系统执法办案电子数据取证技能大竞赛赛完整试题
- 高中实验室生物安全培训课件
- GB/T 32741-2025肥料、土壤调理剂和有益物质分类
- 心律失常教学课件
- 2025年检验检测机构授权签字人考核试题(含答案)
- 运动性猝死预防课件
- 《光伏电站场区总平面布置技术要求》
- 压裂安全工作培训课件
评论
0/150
提交评论