1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas
2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve
3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record
4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a
5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne
6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site
7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c
8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins
9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an
10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co
11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article
12、 46th 温州发电厂二期工程主厂房水泥砂浆楼地面施工 作 业 指 导 书编制人: 审核人:批准人:编制单位:浙江省第二建筑工程公司温电二期项目经理部编制时间:二OOO年五月三十一日 目 录一、工程概况二、施工准备三、施工程序四、作业方法五、产品保护措施六、作业质量保证七、安全文明要求八、环境保护措施九、施工质量检验标准一、工程概况 1主厂房楼地面水泥砂浆面层主要包括汽机房0.000m层,12、3/A4轴的电气检修间;3.800 m层,11a12、1/AB轴的电缆夹层;6.300 m层,311、1319、AB,119、BC轴的汽机房及除氧间楼层;27.800 m层,13、CD轴楼面等。 2水泥
13、砂浆楼地面做法,汽机房电气检修间为:塘渣回填夯实,钢筋砼地坪,30 mm厚1:2水泥砂浆面层;3.800 m层的电缆夹层、6.300 m层的汽机房及除氧间楼层为:现浇钢筋砼楼板基层,30 mm厚1:2水泥砂浆面层;27.800 m层13、CD轴楼面为:钢筋砼现浇楼板,30 mm厚1:2.5水泥砂浆掺5防水剂面层。二、施工准备2.1作业条件2.1.1楼地面的设备、管道应安装结束;接地扁铁应用膨胀螺丝固定牢固,高出楼面面层的扁铁应先将楼面基层砼凿低后再固定,必须保证扁铁面比楼地面低20mm;2.1.2楼层的结构伸缩缝处理:2.1.2.1、6.300 m层1111A轴、4/AB轴间楼板的伸缩缝,板底
14、用“U”型彩板将缝密封;板面缝两侧各增加一块6 mm厚、90 mm宽的悬挑铁板,将缝覆盖一部分,铁板间的空隙缩小到40 mm,然后用膨胀螺丝固定铁板;接着在铁板面安装“V”型彩板,将缝密封;施工面层时留出10 mm宽的伸缩缝。2.1.2.2由于设备运行产生震动,汽机房楼面与汽轮发电机基座、汽动给水泵基础间的缝隙,在缝两边分别安装L304悬挑角钢,角钢间留出15 mm宽的通缝,不密封。2.1.2.3楼层内小于35 mm的结构缝,用泡沫填实(下部与梁底、板底平齐,并用腻子刮平),面层施工时留出10 mm宽的缝隙。2.1.3楼面格栅板四周、孔洞四周用L304的角钢护边(角钢围成的孔洞比格栅板实际长度
15、、宽度大10mm),保证上述部位的水泥砂浆面层不会被损坏;2.1.4楼层孔洞四周的栏杆应安装好,损毁的应调整、修复;2.1.5各楼层的通道应保证畅通;2.1.6施工用水、用电应引到楼层或楼层附近;2.1.7施工前对人货两用电梯、井架进行检查维修,确保材料的垂直运输;2.1.8施工前对搅拌机、运输车辆进行检查维修,确保砂浆的供应及材料的水平运输。2.2劳动力组织木工 3人 泥工 30人普工 15人 机操工 3人电工 3人 机修工 3人驾驶员 3人 23主要机具准备231计量仪器 钢卷尺(HY358) 6把 水准仪(NA2) 1台 塔尺 1把232其它机具靠尺 4根 砂浆搅拌机 2台 人货两用电梯
16、 1座 手拉车 15辆 翻斗车 4辆 井架 1座 铲刀 10把 大型切割机 1台手提式切割机 2台 扫把 6把 24主要材料准备黄砂 500t 水泥(P.O425#) 300吨 钢丝网片 500m2 4钢筋 约1吨 细石子 5吨 异型彩板 400m油膏 400kg 304角钢 500m三、施工程序楼地面基层清理测量标高、做灰饼砂浆面层施工养护切割分格缝水泥砂浆踢脚线、分格缝嵌油膏。四、作业方法4.1楼地面面层施工前,先对基层面进行清理、冲洗,清除表面落地砂浆、油渍、灰尘、杂物等,以防止砼与砂浆接合不严实而起壳、裂缝。42基层清理干净后复核标高,并与对应的建筑高度相比较,基层面过高的部位砼应凿低
17、,基层面过低的部位先用细石砼找平;6.300 m层119、AC轴,由于结构沉降不均引起的汽机房及除氧间楼层的高差,面层施工前除氧间楼板先用C30细石砼找平(表面用木蟹拉毛)。43按照建筑高度用1:1水泥砂浆做灰饼,间距2m,灰饼面用铁抹子抹平。灰饼面标高即为楼地面标高,灰饼应在楼地面面层施工前12天做好,保证灰饼达到一定强度,施工时能真正发挥作用。44在安装设备、管道过程中楼面被凿出的洞,吊模后用与楼板同级配的砼补平。4.5汽机房电气检修间、3.800 m层的电缆夹层、6.300 m层的汽机房及除氧间楼层水泥砂浆面层,水泥与黄砂重量比为1:2;27.800 m层,13、CD轴楼面重量比为1:2
18、.5水泥砂浆掺5防水剂面层。4.6楼地面找平层施工时,浇水湿润基层,然后用水灰比为0.40.5的水泥浆进行扫浆,随扫随铺砂浆,确保找平层与基层,不起壳、空鼓。4.7浇筑时,用铁铲将砂浆向四周分散,先用2m长刮尺按照灰饼的高度将砂浆赶平,再改用短直尺进行二次平整,接下来用木蟹进行压实压平,待砂浆稍微收水后用铁抹子进行二次压光。压光应根据现场效果,必须进行三次、四次光面,确保面层平整、光洁、色泽一致、无抹痕。4.8面层施工后,再做120高水泥砂浆踢脚线。墙面做法为:先用12厚1:3水泥砂浆打底刮糙,再用8厚(出墙厚度)1:2.5水泥砂浆罩面压实赶光;柱直接用8厚1:2.5水泥砂浆罩面压实赶光,踢脚
19、线内的柱线角补平;踢脚线阴阳角均做成直角。4.9楼面洞口的止口(宽100、高150)用相同成份的水泥砂浆抹平压光。4.10楼地面的分格缝,横向按9m(轴线距离)分缝,纵向:汽机房分别在1/A、2/A、3/A、4/A轴的柱边设分格缝(并结合结构缝作适当调整),除氧间在BC轴的跨中设分格缝,煤仓间在CD轴中间设一条分格缝。水泥砂浆面层养护结束后,弹线切割出(结构缝上部的分格缝用嵌木条的方式留设)。4.11大面积上的分格缝用大型切割机割出,切割时在平行于墨线方向摆放一根8槽钢,便于沿着直线方向推拉切割机,以保证割出的缝通直、匀称;楼地面角落及与设备或管道相碰的部位则用手提式切割机割出;分格缝宽5mm
20、,深20mm,用油膏灌满灌实。五、产品保护措施5.1水泥砂浆压光后,施工部位的四周拉警戒线或用脚手片围护,并挂上“禁止通行”的警告牌,24小时内严禁上人。5.2水泥砂浆面层施工后,从第二天开始进行浇水养护七天,每天浇水不少于两次。5.3预先与监理、总包单位联系,由他们协调安装单位,在水泥砂浆面层养护期内,不允许堆放重物(尤其是重型设备、管道),不允许安装设备及管道,以免破坏面层而起砂。5.4养护期过后,堆放设备、管道下部应垫枕木;拖运设备、管道时,楼地面上应铺枕木、轨道、彩布,或用专用手摇车运输设备,以防划伤、磨破水泥砂浆面层。5.5起吊、安装设备、管道时,应缓慢、匀速提升、下降,禁止骤然升降
21、,造成设备、管道碰撞地面,砸破面层。5.6楼地面上搭拆脚手架时,钢管、轧头应稳拿轻放,禁止随意乱扔,砸破面层。5.7板底施工油漆、涂料时,相应的楼地面上应铺上彩布或塑料薄膜,以减少油漆、涂料跌落污染面层;油漆、涂料跌落楼地面,应及时用棉纱、松香水等擦拭洁净。5.8水泥砂浆面层上,严禁拌制砼或砂浆,临时堆放砼或砂浆时,应先铺上塑料薄膜等,施工结束后,及时用水冲洗砼或砂浆堆点。5.9施工过程中跌落楼地面上的砂浆应及时清理干净。六、作业质量保证1.作业前进行质量技术交底。2各种原材料到达施工现场后,必须验证其合格性。3.楼层与墙面交接处增加一层600mm宽三目钢丝网片,埋进墙内、板内各300mm;除
22、氧煤仓间及汽机房框架梁与现浇楼板的接头处,加铺一层4g100双向钢筋网片,网片为框架梁宽加1000mm(梁两侧各500mm),防止这些部位出现裂缝。4由于楼地面的埋件、埋管等引起面层厚度过薄(少于5mm)而出现裂缝,施工面层前在这些部位加铺一层比埋件、埋管每边大100 mm的钢丝网片,并用水泥钉将网片固定在楼地面基层上。5.角钢安装前应逐根挑选,起翘、弯曲的角钢应调整后再使用;安装时拉通线,确保角钢边沿通直、上口平整。6面层的水泥砂浆应采用机械搅拌,且搅拌时间不少于2min,应拌至砂浆色泽均匀为止;砂浆稠度不大于3.5cm。7水泥砂浆面层施工前,先做栏杆四周的止口(止口表面比楼层面高出20mm
23、,以便挡水),伸缩缝处角钢下口的空隙、压型彩板接头处的缝隙都要预先用砂浆堵实,以减少面层施工时水泥浆下漏污染梁侧、板底涂料、钢梁油漆。8施工踢脚线时,应拉通线,确保踢脚线上口平直,出墙厚度一致。9楼层施工后须凿洞或增加留孔的位置、面层有起壳、裂缝的部位,应用切割机割出规则的缝后再开始凿(处理后,再用相同成份的水泥砂浆修补),不允许随便乱凿乱敲,以防引起相邻部位的面层起壳、空鼓。七、安全文明要求1.大力宣传安全第一、预防为主的方针,加强对职工的安全教育,采取有效的安全防护措施,确保安全生产。2.作业现场,用电设备必须一机一闸,并安装触电保护器。3.作业人员应遵守施工现场的所有规章制度。4溅在柱面
24、、墙面及设备上的砂浆应及时清理干净。5.材料做到用多少拉多少,施工垃圾每天下班前都应清理干净,并到指定的地点倾倒,切实抓好现场的文明施工。八、环境保护措施 1. 采用散装的水泥,在入库过程中容器的排气设施须用多层过滤设施,存放过程必须有防护设施,以防止粉尘飞扬,在使用过程中尽量使用螺旋输送器,出料口装上转套筒(麻布等)减缓出料速度,套筒长度以不出现落差为宜;采用袋装的水泥,在搬运、使用过程中必须轻拿轻放,避免高处坠落,尽可能减少落差,不得用力摔打, 存放过程必须有采取防粉尘飞扬措施。 2.露天堆放的易产生粉尘材料(如:黄砂等)在搬运、堆放、使用过程中如过于干燥应适当洒水进行湿润。在用机械作业过
25、程中,作业机械应减小机械动作,尽量减小落差,以减少粉尘的产生。 3砂浆应在容器内适量搅拌,避免剩余。砂浆落地灰应及时回收利用,加适量水泥重新搅拌使用,对确实不能使用的可做道路垫层使用。 4施工过程中产生的建筑垃圾,应收集到一起,到垃圾堆场倾倒或统一在允许回填范围内回填,不允许随处乱倒。 5切割分格缝时,应边撒水边切割,以减小灰尘。 6. 施工现场中,应经常洒水,保持尘土不上扬。在清理打扫作业场地时,应进行洒水湿润。 7.加强设备润滑和维护保养,加强对机动车辆的维护和保养,并严格执行相应作业指导书和设备点检规程,保持技术性能良好。 8.由质安科、材料科组织,不定期的进行检查,对作业班组进行检查,
26、对处置规范的给予适当奖励。反之,则勒令定期整改,并给予一定的经济处罚。 九、施工质量检验标准 项目 质 量 标 准 及 允 许 偏 差 (mm )检测方法及工具面层的材料、强度(配合比)和密实度必须符合设计要求和有关现行标准(规范)规定观察检查和检查试验报告各层之间的结合必须牢固,无裂纹、空鼓。在一个检查范围内空鼓面积不超过400cm2,且不多于2处观察和小锤轻击检查表面质量洁静,无裂纹、无脱皮和起砂等缺陷观察和尺量检查踢脚线质量高度一致,出墙厚度均匀,与墙面结合牢固,局部空鼓长度不超过200mm,且在一个检查范围内不多于2处小锤轻击、尺量和观察检查表面平整度42m靠尺和楔形塞尺检查踢脚线上口
27、平直度4拉5m线(不足5m时,拉通线)和尺量检查分格缝平直度3拉5m线(不足5m时,拉通线)和尺量检查regular issuance system of internal and external accident cases, organizational learning, analysis and discussion on a regular basis, and educate the persons concerned in a timely manner. 47th article: strengthening the safety of staff, establishing
28、 the concept of legalization of production safety, establish a people-oriented concept, three do no harm (dont hurt yourself, no harm to others, not to be hurt). 48th eighth day routine: pre-shift and post-shift monitor organizations, safety assist. Before class: succession (started), combined with
29、shift operation and tasks for better risk analysis, arranged security account considerations. After class: summarizing comment on duty and the security situation, praise good deeds criticism ignored safety, illegal operations and other adverse phenomena, and completes the record. 49th: safety day ev
30、ent organized by the monitor, safety help, workshop leaders and checking activities. Classes (groups) or rotating a safety day event a week, activities to learn more about the superior file and the spirit of the meeting, informed of the accident, analysis of the company, workshop and fewer security
31、incidents, as well as the typical illegal team, analysis of operation environment, there may be a risk factor for the main content. 50th: security analysis companies every quarter of a security analysis; shop at least once a month analysis, comprehensive analysis of production trends, sum up lessons
32、 learned from and the weakness in safety management, accident prevention measures in the study. Meeting was chaired by enterprise security responsibility, concerning the participation of Heads of Department, workshop. Formation meeting and made public. 51st: security check for carbon companys period
33、ic and non-periodic safety checks should be carried out. Periodic inspection includes fall and spring security checks, security checks should be combined with spring or autumn season characteristics and accident law . 52nd: security analysis companies should all be actively involved in the preparation of security advisories, bulletins, integrated security, analysis of accident law, drawing on lessons learned from. 53rd: the companys safety safety month activities
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 雨课堂学堂在线学堂云《舰载机结构与系统(中国人民解放军海军航空)》单元测试考核答案
- 2026北京公交集团校园招聘备考题库及答案详解(夺冠系列)
- 2026河南安阳高新区就业见习单位及就业见习岗位招募备考题库(培优b卷)附答案详解
- 客户信息管理工具与精准营销策略支持
- 2026广东佛山市南海区大沥镇太平成远小学招聘备考题库附答案详解【a卷】
- 2026中国农业科学院油料作物研究所油料基因工程与转基因安全评价创新团队科研助理招聘1人备考题库含答案详解(综合题)
- 2026广东东莞市望牛墩镇中心幼儿园招聘备考题库及完整答案详解
- 2026四川遂宁市就业服务管理局面向社会招聘1名编外人员备考题库及答案详解(典优)
- 2026广东省南方医科大学珠江医院三水医院第二批合同制工作人员招聘26人备考题库附答案详解【综合卷】
- 2026北京对外经济贸易大学非事业编人员招聘7人备考题库及答案详解【易错题】
- 《市场监督管理投诉举报处理办法》知识培训
- 物业扭亏为盈工作汇报
- 2025广东中考短文填空公开课
- 《AutoCAD 2025中文版实例教程(微课版)》全套教学课件
- 化工设备的安全评估
- 21杨氏之子 课件
- 4.2依法履行义务 课 件 2024-2025学年统编版道德与法治八年级下册
- 2024年贵州省普通高中学业水平选择性考试地理试题(原卷版+解析版)
- 办公室安全知识培训
- 《GNSS定位测量》考试复习题库(含答案)
- 塑料搅拌机安全操作规程
评论
0/150
提交评论