




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Fuse Technology,Present: Kinrex Corp. - WICKMANN By: Chin Huang,1. Basic Theory of Fuse,a) Circuit Protection Current (Ampere) b) Completed & Perfect Protection It protection, short circuit protection & overloading c) UL 248 & IEC60127 Standards 1A (IEC) = 1.35A 1.4A (UL) d) F (quick-acting) & T (Ti
2、me-lag) F not mean fast blow (lower It) T not mean slow blow (higher It),Overloading Protection,a) UL 248 (mainly 0 30A) F - (Irat x 1) 4 H (Irat x 1.35) 12 S (Irat x 5.0) 10 S,b) IEC60127 (250V & test at 70 2) 5*20 mm high breaking (ceramic tube) Irat x 1 2.1 2.75 4 10 F (0.056.3A) 1H 1H 1H 1H 1H 1
3、H 1H 2 min 400ms10S 150ms3S 20150ms,2. Application Guideline,a) Inrush Current Initial Power on stage FF - short circuit protection esp for semiconductor F - short circuit protection M - quickly decreasing inrush currents with low volt drop T - slowly decreasing inrush current TT - slowly decreasing
4、 inrush current (esp for telecom) b) Impulse Quantity of Pulse Life Time (Power on/off) It of fuse / It of pulse = Fp 3 - 5,000 4 - 50,000 4.5 - 100,000 5 500,000 Impulses,c) Amperage Selection I operating max. * Fi * F Inrush/40 * Fi * F Inrush * (5*tp/pulse shape) * Fi 2 for time-lag fuses with 10
5、,000 pulses 5 for time-lag fuses with unlimited of pulses 36 for quick-acting fuses with unlimited of pulses Pulse shape 1 = rectangular pulse 2 = half sin curve pulse 3 = triangular pulse,3. Protection,a) ampere protection Primary & 2nd protection b) voltage will be considered when fuse melted (bac
6、k arcing) c) Insulation resistance Vrat x 2 Related to the varistor specification IEC 0.1 M PSE/JET 0.2 M UL no arc-back 30s after blowing d) Thermal Fuse Main concern is Temperature not Ampere,4. Fuse Process,a) Element (wire) Copper & Silver round, flat (high ampere) tinned & not tinned diagonal,
7、straight, ball blob & wind b) Element soldering c) Encap d) with pigtails (caps),5. Failure Mode Analysis,a) high current with high back voltage b) high current with low back voltage c) low current with high back voltage d) low current with low back voltage e) current meets voltage on element and causes arcing,6. Reliability & Life Test,a) Cold Resistance (Irat x 0.1) b) Voltage Drop (Irat x 1.0) c) Power Dissipation (UL Irat x 1 / IEC Irat x 1.5) d) Based on Irat x 1.5/2.1/2
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 军品订购项目管理办法
- 北京车位产权管理办法
- 资本驱动下人工智能产业化的伦理挑战与应对策略
- 睡眠剥夺对小鼠色氨酸代谢及行为影响机制研究
- 体检机构备案管理办法
- 佛山酒店宿舍管理办法
- 西部地区经济韧性对经济高质量发展的影响研究
- 基于机器视觉的钢板表面缺陷自动检测系统设计与实现
- 未发生较大及以上生产安全事故
- 智慧医院建设管理办法
- 井盖巡查管理制度
- GB/T 33490-2025展览展示工程服务基本要求
- 2024年国能榆林化工有限公司招聘真题
- 消防总队面试题目及答案
- 《低钠血症中国专家共识(2023年版)》解读课件
- 公司法期末考试卷及答案
- GB/T 45604-2025船舶与海洋技术大抓力平衡锚
- 国家中小学智慧教育平台与人工智能融合应用指南(试行)
- 混凝土搅拌站企业管理规范与要求
- 物业公司接管写字楼项目工作时间倒推计划表(T日为入驻日)
- 重点人口管理工作规定
评论
0/150
提交评论