版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、8/13/2020,1,BA 339 OM Chapters 7 each process designed to perform a wide variety of activities and handle frequent changes Standard Register example (text, page 235-6),8/13/2020,4,BA 339 OM Chapters 7 modules combined for many product/output options Falls in between product classic assembly line (au
2、tomobiles, appliances) Examples: Fast-food firms (quasi-custom product) Harley-Davidson final assembly of multiple cells, nodes, or modules Economic advantages of continuous model and custom advantages of low-volume, high-variety (quasi-customization),8/13/2020,5,BA 339 OM Chapters 7 Can be discrete
3、 (discrete unit manufacturing) or nondiscrete (continuous process manufacturing) Examples: Glass, light bulbs, beer, rolls of paper Inherent advantage in establishing standards or maintaining a given quality level Advantages: Lower variable cost/unit, lower but more specialized labor skills, easier
4、production planning characterized by higher fixed costs, dynamic variable cost Examples: Automobiles 140 260 models (1970s-1990s), product to market in 2-3 years vs. 7-8 years, increasing number of options Phone services many more options (caller ID, voice mail, forwarding, data, cellular vs. land l
5、ine, etc.,8/13/2020,7,BA 339 OM Chapters 7 Utilization above 15% suggests moving toward repetitive, product or mass customization focus Low utilization often driven by need for excess capacity needed for peak loads; often driven by inefficient scheduling and resulting imbalance in facility usage Cro
6、ss-over charts examines comparative costs of different processes; illustrates lowest cost alternative at any given volume Difficult/expensive to change production system from process to other type Example: McDonalds shift to charbroiling See figure 7.1, page 234 in text,8/13/2020,8,BA 339 OM Chapter
7、s 7 Low labor intensity Lend themselves to innovation in process technology and scheduling Low customization Characterized by lower customer feedback; maintaining quality standards is critical,8/13/2020,11,BA 339 OM Chapters 7 generally lower that design capacity due to constraints, changes, etc. Sy
8、stem performance measures Utilization = Actual output/design capacity expressed as % = Planned hours to be used/total hours available Efficiency = Actual output/effective capacity expressed as % = actual outputs in units/standard outputs in units = average actual time/standard time Anticipated produ
9、ction (output or throughput) Uses design capacity, effective capacity expansion sometimes leads, sometimes lags,8/13/2020,24,BA 339 OM Chapters 7 accommodate market through product changes Adjusting to Seasonal Demand Offer products with complimentary demand patterns (increase/smooth facility utiliz
10、ation),8/13/2020,26,BA 339 OM Chapters 7 Dana corporation ($5B steel) has a cap of 200 employees at nearly all 120 plants) 4 Reasons why economies drive down costs Fixed costs are spread over more units of production avg. unit cost drops Reducing construction costs cost of constructing additional ca
11、pacity increases slower than capacity increase yield Reduced cost of purchased materials better pricing based on volume purchases Process advantages in efficiency due to faster learning, lower inventory, reducing changeovers,8/13/2020,27,BA 339 OM Chapters 7&8,Diseconomies of Scale Avg. unit cost in
12、creases as facility size/capacity increase (sometimes at a faster rate) Too many layers of bureaucracy Losing touch with employees and customers Less agile/flexible to demand changes Less involvement in innovation & greater risk avoidance resulting from planning & analysis Example: Incredible Univer
13、se Superstores has 85k products in 185k sf, 4 times the avg. of rival Circuit City. Lack of focus and huge size makes it impossible to generate enough sales/SF,8/13/2020,28,BA 339 OM Chapters 7&8,Capacity and Other Decisions Must be linked to other strategies and operations. Examples include: Compet
14、itive priorities Quality management Capital intensity Resource flexibility Product lifecycle Inventory Scheduling,8/13/2020,29,BA 339 OM Chapters 7&8,Breakeven Analysis Objective is to find the point (in dollars & units) at which costs equal revenues Includes fixed & variable costs Assumptions: Reve
15、nue & cost are related linearly to volume, all is information is know w/certainty, and no time value of money Graphed with costs/dollars on the vertical axis and volume/units on the horizontal axis Basic formulas Breakeven point TC = TR Breakeven in units = Total fixed costs/ Price variable cost Bre
16、akeven = Total fixed cost/1-(variable cost/selling price),8/13/2020,30,BA 339 OM Chapters 7&8,Strategy-Driven Investment (Guidelines) Select investments as part of a coordinated strategic plan Choose investments yielding a competitive advantage Consider product lifecycles Include relevant operating
17、factors in the financial return analysis (Ex.: scrap, rework, floor space & inventory affect ROI) Test investments in light of several revenue projections to ensure that upside and downside risks are considered,8/13/2020,31,BA 339 OM Chapters 7&8,ERP Systems “Packaged business software system that a
18、llows companies to”: Automate & integrate majority of business processes Share common data & practices across the entire enterprise Product and access information in a real-time environment Utilizes a centralized database to assist information flow between ordering, project management, manufacturing
19、, purchasing, finance, logistics, and human resources Hitting business when data integration, reduced transaction costs, and speed & accuracy of information are critical strategic issues 20,000 firms are paying $10B/Year to ERP firms Vendors include: PeopleSoft, Oracle, SAP, JD Edwards,8/13/2020,32,BA 339 OM Chapters 7&8,ERP Systems Advantages Provides integration of supply-chain, production & administrative processes Creates commonality of databases Can incor
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2027年高三地理教学设计:气压带与风带形成机理的深度构建与迁移训练
- 2026国家公务员考试行测试题及答案
- 初中九年级科学《杠杆平衡条件的探究与应用》教学设计
- 高二生物教学设计:人口增长对生态环境的压力与可持续发展对策研究
- 2026年ICU医护人员廉洁从业专项考试题(含答案)
- 2026年henan会考信息技术考试试题及答案
- 2026年1+X失智老年人照护考试题库(含答案)
- 初中英语八年级上册Unit 3期末复习默写教学设计
- 2026年安全知识考试试卷附答案
- 2026年嘉峪关市烟草专卖局人员招聘笔试备考试题及详细答案解析
- (2026年)实施指南《JBT 3233-2018 超硬磨料 钻探用人造金刚石聚晶》
- 胃癌中西医结合诊疗指南
- 土建消防安全培训内容课件
- 湖湘文化教学课件
- 农机安全知识培训课件教学
- 税务师事务所管理制度
- T/CWAN 0092-2023铜与钢异种金属钎焊技术导则
- 国家开放大学《公共部门人力资源管理》形考任务2答案
- 《特种加工技术》课件 项目九-超声加工技术
- 《狼图腾》是如何“图腾”的狼图腾编辑出版案例解析
- 新版出口报关单模板
评论
0/150
提交评论