1、How Is A Paradigm Formed?,Paradigm: A set of assumptions, concepts, values, and practices that constitutes a way of viewing reality for the community.,(Paradigm=Example),A group of scientists placed 5 monkeys in a cage and in the middle, a ladder with bananas on the top.,Every time a monkey went up
2、the ladder, the scientists soaked the rest of the monkeys with cold water.,After a while, every time a monkey went up the ladder, the others beat up the one who tried to go up the ladder.,After some time, no monkey dare to go up the ladder regardless of the temptation.,Scientists then decided to sub
3、stitute one of the monkeys. The 1st thing this new monkey did was to go up the ladder. Immediately the other monkeys beat him up.,After several beatings, the new member learned not to climb the ladder even though it never knew why.,A 2nd monkey was substituted and the same occurred. The 1st monkey p
4、articipated on the beating for the 2nd monkey. A 3rd monkey was changed and the same was repeated (beatings). The 4th was substituted and the beating was repeated and finally the 5th monkey was replaced.,What was left was a group of 5 monkeys that even though never received a cold shower, continued
5、to beat up any monkey who attempted to climb the ladder.,If it was possible to ask the monkeys why they would beat up all those who attempted to go up the ladder. I bet you the answer would be. “I dont know thats how things are done around here” Does it sound familiar?,So the question is How do we k
6、eep from making the same mistakes over and over again?,The “Art Of Perfection” With A Wonderful FMEA,Agenda FMEA Training Suzhou Plant,Day 1 FMEA On team until de-commissioning,Core team defines tasks to complete; Functional Supv. assigns tasks to extended team; On team until assigned tasks are comp
7、leted.,Must attend FMEA,Attend FMEA as required by Core Team,Design Engineer On team until de-commissioning,Core team defines tasks to complete; Functional Supv. assigns tasks to extended team; On team until assigned tasks are completed.,Must attend FMEA,Attend FMEA as required by Core Team,Process
8、Engineer & Launch Team Responsible for all aspects of Process FMEA,Minimum Core Team: Launch Coordinator Plant Quality Engineer Process Engineer Operator,Functional support: Automation engineer Supervisor Environmental Tooling engineer Design engineer,Process FMEA Team Structure,Process FMEA teams w
9、ith members from different areas bring varying degrees of experience and perspective to the problem being analyzed.,Organizing the Team,Team members should have experience working with the process,Process FMEA teams should include members from: Manufacturing or launch coordinator Design Engineer AQP
10、 Engineer Production Supervisor Operator Process Engineering Quality Engineering,Task: Scheduling meetings 2-3 meetings per week. FMEA should not take longer then 8 weeks. Planning the agenda One hour maximum Orienting team Ensuring completion,Facilitator role (preferable Quality/Manu Eng.),Capabili
11、ty Team building Coach, counsel, mentor, continually review the focus of your team members and adjust direction, and manage/direct team members Good written skills Promotes detail and follows up,Understands the process and potential process failures He is the person that manages process expectations
12、 and process performance. Understands process robustness and process flaws Manages and controls all internal aspects of cost, timing, delivery and product expectations Learned from past experience potential failures, occurrences and detections. Discuss opportunities of prevention ,if applicable,Role
13、 of Process/Manufacturing Engineer,Design Engineer Attends For Process FMEA Related To A Product Or Part,Role of Design engineer,Understands critical failure modes from Design FMEA Understands SOR or specifications of the product. Knows fit and function of the part very well and provides potential f
14、ailure modes Provides potential high risk severity,Potential failure modes from daily and hands on experience Provide potential handling defects Has experience and knowledge of failure occurrence Potentially your most valuable team members,Role of Supervisor/ Operator,Role of AQP Engineer,Audits Pro
15、cess FMEA Verifies that failure modes are protected Assures the High Severity, high emphasize actions are complete,1Organizing the team,2Getting Started,Process FMEA,3Analyzing Potential Problems,4Identifying Causes and Controls,5Identifying and Implementing Corrective Actions,6Pitfalls of FMEA,Gett
16、ing Started,Identify Process or function,Review previous FMEAs,Have Design FMEA,Complete process steps/ functions,Conduct Risk Analysis,Getting Started,I start and complete PFMEA at my desk to show Process FMEA to customer for PPAP. Check in the box, FMEA complete for our AQP 6 gate launch process,F
17、MEA is a written document generated by a cross functional team to evaluate the potential failure of a product/ process/ machine and the effects of the failures,All FMEAs focus on design, regardless of whether it is of the product, machine or process,It is against SRG policy to provide a copy of our
18、Process FMEAs to the customer,WRONG !,Process flows include all significant steps and added value on the process/ product,When the risk analysis is performed, the team determines whether each step is a HIGH, MEDIUM, or LOW risk.,1Organizing the team,2Getting Started,Process FMEA,3Analyzing Potential
19、 Problems,4Identifying Causes and Controls,5Identifying and Implementing Corrective Actions,6Pitfalls of FMEAs,1Organizing the team,2Getting Started,Process FMEA,3Analyzing Potential Problems,4Identifying Causes and Controls,5Identifying and Implementing Corrective Actions,6Pitfalls of FMEAs,1Organi
20、zing the team,2Getting Started,Process FMEA,3Analyzing Potential Problems,4Identifying Causes and Controls,5Identifying and Implementing Corrective Actions,6Pitfalls of FMEAs,Process FMEA Considerations,Potential failure modes,Impact on manufacturing plant,Impact on customers,Root Causes of the Pote
21、ntial Failure,Detection On The Root Cause (Not The Effect),Ability to detect root cause,Recommend corrective actions,Effects such as scratch, dirt, nickel show are not failure modes,1) Potential Causes are on the failure mode,2) Detection, Detect the cause, NOT the failure mode or effect of the fail
22、ure mode,PLC stops mold when dryer stops working,3) Prevention: when a potential cause happens, process or machine stops avoiding failure mode,Identifying and Implementing Corrective Actions,We should address corrective actions based on the following criteria:,Improve Design and Process FMEA with To
23、p 5 activity prioritized with previous criteria,Implement our “lessons learned” and “best practice” activity and achieve a continuous improvement culture,(1) High Severity (9 or 10) Operator safety (2) High Impact of Emphasis: Severity= 5 to 8 and Occurrence=4 to 10. (3) High RPN,FMEA,Design FMEA Co
24、mponents Subsystems Systems,Process FMEA Machines Work Stations Tools Production lines Gauges Operator Training,Remember this,1Organizing the team,2Getting Started,Process FMEA,3Analyzing Potential Problems,4Identifying Causes and Controls,Identifying and Implementingcorrective Actions,6Pitfalls of
25、FMEAs,FMEA Pitfalls,Pitfall: Prioritizes Doesnt Correct:,Pitfall: Effects from a failure mode are considered failure modes:,A FMEA does not detect how we can avoid sending a defect to the customer. You make the defect but dont send it to your customer by adding more labor or spectacular detection sy
26、stem. You eat the scrap anyway. A good FMEA avoids making a defect.,The output of a FMEA is prioritizing failure modes, this dont eliminate the failure mode. Additional action are needed to reduce the failure mode,$,FMEA Pitfalls,Pitfall: Only as Good as the team,Pitfall: Time Consuming:,It takes ti
27、me and discipline to get into the details,Identifying failure modes is a team brainstorming process If the team is not detail oriented and forget an important failure, then this failure is waiting to occur,Pitfall: Not Accurate Rating Scales:,Rating scales should be meaningful. Assure that similar r
28、ating scales are always the same thru the FMEA. Visual inspection should be a 8 across the FMEA. Dont cherry pick, with as purpose to keep the RPN low,FMEA Pitfalls,Pitfall: Not starting in the Design phase,Pitfall: To provide this in a PPAP package to customer:,To do a FMEA just to do it is useless
29、. Stop wasting your time Make sure a FMEA has added value and should be completed with a CFT team. Good FMEAs should not be provided to the customer.,The earlier in the design process the FMEA is started, the better A Design FMEA can catch potential failures still when design can be modified,Pitfall
30、: Not including operators,Experience operators should be on the team to use their knowledge Operators often have good information on failure modes and the effectiveness of the controls. They can also provide occurrences,FMEA Pitfalls,Pitfall: Not looking to previous and similar products,Pitfall: Ass
31、ume Detection Controls are better then they are:,Some controls are not robust and not verified for they function Dont test for what we think they test for.,Templates are great but every product has its unique issues or concerns. Use other FMEAs but review with the CFT team that this product doesnt h
32、ave other failure modes,Pitfall: Not linking with Mistake-Proofing,Sometimes failure mode can not be avoided and detection of the failure mode is critical. THE FMEA DOESNT ELIMINATE THE FAILURE MODE OR EFFECTS BY ITSELF, it only DETECTS IT Then we need to apply tools such as mistake-proofing, verify
33、 the robustness of the mistake proofing regularly.,FMEA Pitfalls,Pitfall: Not Tying Into the Control Plans,Pitfall:Failing to Update the FMEA:,As new potential failure modes are identified, they should be added to the FMEA and control plan. These are living documents. Add any QR, PIR, PRR,etc number
34、s to the FMEA,The control plan provides us information on how to react when a failure mode occurs. The FMEA will not be a living document if it is not tied to the control plan,Pitfall: No linkage between Design FMEA-Process FMEA and Control Plan,Severe failure modes from the Design FMEA should be ad
35、dressed in the Process FMEA and for sure mentioned in the control plan,FMEA Example,Previous failure mode: set up sheet was a 4 or 3?,Remember: Flash is an effect from a failure mode,What is the root cause? Clamp pressure to low,Processing, trouble shooting is not a process step,Previous failure mod
36、e: 100% Operator inspection was between a 3 to 7?,Not heated properly is an affect from a failure mode!,Only one root cause: Temperature Anvils not correct:3, Settings not correct:4,Assembly is a process step but is not defined,Previous failure mode: 100% Operator inspection vary from 4 to 7?,Missin
37、g studs is an affect from a failure mode!,root cause is not defined Machine failure or malfunction,Assembly operation is a process step but is not defined,HE,Remember: Severity between 5-8 with combination of occurrence 4-10 are HE failure modes,Previous failure mode: 100% detection was a 7,Remember
38、: Flash is an effect from a failure mode,To much causes: Mold damage=2, Process parameter= 3, New/repaired mold=1,Severity on surface defects should have higher ranking,Similar detections are a 7: Visual inspection should be a 8,Surface defects are effects from a failure mode,To much causes: Padmark=2, Material handling= 4 Rough surface of die= 2,FMEA building block,Building block system,Uses the premises that: Difference from part to part are minimal Molding is molding, plating is plating, paint is paint,etc. Process improvements to part ABC will likely apply to part XYZ Focuses on the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026江苏南京大学YJ20260399化学学院博士后招聘1人笔试题库附参考答案详解(综合卷)
- 2026海南洋浦经济开发区交通运输管理中心招聘公益性岗位人员2人模拟试卷附完整答案详解【必刷】
- 2026年福建厦门市思明区市场监督管理局补充非在编辅助岗人员2人笔试题库及参考答案详解【满分必刷】
- 2026广东佛山市季华实验室科研及公共技术部门招聘10人备考题库含答案详解(精练)
- 2026海南省海洋与渔业科学院招聘事业编制人员4人(第1号)笔试题库及一套完整答案详解
- 2026浙江舟山市岱山县衢山镇祥安船舶管理服务有限公司招聘1人备考题库(突破训练)附答案详解
- 2026浙江交工集团股份有限公司招聘1人(2026年第4期)模拟试卷附答案详解【夺分金卷】
- 2026四川雅安市国峰人力资源有限责任公司招聘5人模拟试卷(有一套)附答案详解
- 2026上海市第十人民医院工作人员公开招聘模拟试卷带答案详解(巩固)
- 2026广东江门市台山博达企业管理有限公司招聘2人备考题库(全优)附答案详解
- 【语文】北京市中关村第二小学小学二年级下册期末试卷
- 光伏方阵布线施工方案
- DB3302∕T 1016-2025 城市绿地养护质量要求
- 2026年北京第一次普通高中学业水平合格性考试化学仿真模拟卷02(全解全析)
- 医院运营成本管控与科室绩效的激励机制设计
- 2025年国考行测真题及答案解析(省级与地市级合卷)
- 门诊药房调剂培训
- 【2025年】毕节市招聘大学生乡村医生事业编制人员考试笔试试题 含答案
- 《小学科学课程标准》(修订稿)
- 2025湖南长沙开福城投控股有限责任公司招聘拟录笔试历年参考题库附带答案详解
- 国开2025年秋《农业推广》形成性考核1-3答案
评论
0/150
提交评论