1、PMP Preparation Training,Time Management,Chapter 6,Time Management,Activity Definition Activity Sequencing Activity Duration Estimating Schedule Development Schedule Control,Processes required to ensure timely completion of the project,Time Management,6.2 Activity Sequencing,6.3 Activity Duration Es
2、timating,6.1 Activity Definition,6.4 Schedule Development,Planning,Controlling,6.5 Schedule Control,Activity Definition,Identify the activities that must be performed to produce the project deliverables Define the activities that must be performed to meet the project objectives,Activity Definition,I
3、nputs WBS Scope statement Historical information Constraints Assumptions Expert judgment,Tools provides the basis for measuring and reporting schedule performance Performance reports Provide information on schedule performance, such as which planned dates have been met and which have not Change requ
4、ests Occur in many forms Schedule management plan,Schedule Control,Tools & Techniques,Schedule change control system Defines the procedure for changing the project schedule Progress measurement (Earned Value) Assessment of schedule variations to determine whether they require corrective actions Addi
5、tional planning Prospective changes may require new or revised activity duration estimates, modified activity sequences, or analysis of alternative schedules PM software Useful tool for tracking planned dates against actual dates and for forecasting the effects of schedule changes Variance Analysis
6、comparing target dates with actual start and finish dates to detect deviations and implement corrective solutions in case of delays,Schedule Control,Outputs,Schedule updates Modification to the schedule information used to manage the project Corrective action Anything done to bring expected future s
7、chedule performance back in-line with the project plan Lessons learned Documentation of the causes of variances, of the reasons the corrective actions were chosen, and of other information learned through controlling the schedule,Schedule Control,Basic Terminology,Schedule revisions Changes to the s
8、cheduled start and finish dates in the approved (or baselined) schedule,Schedule Control,Schedule Optimization,Crashing Decreasing the total project duration with the least cost possible Fast tracking Doing activities in parallel that, normally, would be done in sequence Reduce critical path To fast track, shorten the duration of critical activities, or increase working hours Resource leveling Reducing peak overloads
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 南通市温泉度假村租赁合同
- 影视居间合同
- 公司宣传片制作合同模板
- 合同管理考核实施细则
- 融资租赁合同纠纷的相关法条
- 简易单位聘用合同
- 厂房装修合同范本
- 医疗器械的采购合同
- 养生会所合作合同范本
- 广告投放合同协议范本
- 期末综合测评卷(试题)-2023-2024学年人教版数学四年级下册
- (完整word版)新《中华颂》朗诵稿
- 油墨术语参考资料
- 全钒液流储能电站项目可行性研究报告模板立项备案文件
- COMSOL在电化学领域中的建模与仿真应用
- 储罐液位、容积计算器
- 案例分析之复杂谈判
- (完整版)外墙清洗报价方案(模板)
- 教育学基础 第一章教育与教育学
- 人教版PEP小学英语六年级下单词默写(中英版)
- 工程项目全生命周期及设程序[详细]
评论
0/150
提交评论