1、PMP Preparation Training,Time Management,Chapter 6,Time Management,Activity Definition Activity Sequencing Activity Duration Estimating Schedule Development Schedule Control,Processes required to ensure timely completion of the project,Time Management,6.2 Activity Sequencing,6.3 Activity Duration Es

2、timating,6.1 Activity Definition,6.4 Schedule Development,Planning,Controlling,6.5 Schedule Control,Activity Definition,Identify the activities that must be performed to produce the project deliverables Define the activities that must be performed to meet the project objectives,Activity Definition,I

3、nputs WBS Scope statement Historical information Constraints Assumptions Expert judgment,Tools provides the basis for measuring and reporting schedule performance Performance reports Provide information on schedule performance, such as which planned dates have been met and which have not Change requ

4、ests Occur in many forms Schedule management plan,Schedule Control,Tools & Techniques,Schedule change control system Defines the procedure for changing the project schedule Progress measurement (Earned Value) Assessment of schedule variations to determine whether they require corrective actions Addi

5、tional planning Prospective changes may require new or revised activity duration estimates, modified activity sequences, or analysis of alternative schedules PM software Useful tool for tracking planned dates against actual dates and for forecasting the effects of schedule changes Variance Analysis

6、comparing target dates with actual start and finish dates to detect deviations and implement corrective solutions in case of delays,Schedule Control,Outputs,Schedule updates Modification to the schedule information used to manage the project Corrective action Anything done to bring expected future s

7、chedule performance back in-line with the project plan Lessons learned Documentation of the causes of variances, of the reasons the corrective actions were chosen, and of other information learned through controlling the schedule,Schedule Control,Basic Terminology,Schedule revisions Changes to the s

8、cheduled start and finish dates in the approved (or baselined) schedule,Schedule Control,Schedule Optimization,Crashing Decreasing the total project duration with the least cost possible Fast tracking Doing activities in parallel that, normally, would be done in sequence Reduce critical path To fast track, shorten the duration of critical activities, or increase working hours Resource leveling Reducing peak overloads

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论