1、Borupvej 16 - Box 171 DK-7330 Brande Phone: (+45) 99 42 22 22 Fax: (+45) 99 42 22 22 /wind Siemens Wind Power A/S. All rights reserved.ZCH 1034788 / 195510 / 2015-05-261Site:Order no:Approval date:Responsible site officer:Executed byTech IDNameGID1234Rem
2、arks:Preparation for standstill periodNo: ZCH 1034788ECN: 195510Rev. date: 2015-05-26Language: English/EN-US OriginalTurbine type: G2, D3, G4, D6Turbine serial no:Project no:2 Siemens Wind Power A/S. All rights reserved.ZCH 1034788 / 195510 / 2015-05-26Calibrated toolsTool pos.Tool name and typeCali
3、bration ID1234567891011/2 C11Preparation for standstill period1.1Preparation if grid outage will not exceed 14 days1.1.1Make sure the converter cubicle doors are kept closed as much aspossible during the standstill.1.2Preparation if grid outage will be between 15-90 days1.2.1Check that the converter
4、 cubicle doors are kept closed as much aspossible during the standstill.1.2.2Check that a portable generator is installed to supply power for thedehumidifier.1.2.3Check that the fuel tank for the portable generator is filled up toallow it to run for three or more weeks.1.2.4Check that either the ins
5、talled dehumidifier or a portable one isstarted up to help avoid moisture inside the cubicle.1.2.5When the dehumidifier is started up, check the following:Check that the dehumidifier starts and stops when turning thehygrostat up and down.Check the hygrostat setting:Check that ho
6、t air is streaming out of the wet air outlet.Check that the dehumidifier is operating (fan blowing).Disconnect the wet air outlet connection to become able to seethe rotor inside the dehumidifier.Using a flashlight, look into the wet air outlet to check that therotor is turning
7、very slowly.Remount the wet air outlet connection.1.2.6Mount a moisture indicator (A9B10004413) on the inner side of oneof the cabinet sections where the power modules are installed.1.3Preparation for converter if grid outage will exceed 90 days1.3.1Check that the converter cubicle doors are
8、kept closed as much aspossible during the standstill.1.3.2Check that a portable generator is installed to supply power for thedehumidifier.1.3.3Check that the fuel tank for the portable generator is filled up toallow it to run for three or more weeks.1.3.4Check that either the installed dehumidifier
9、 or a portable one isstarted up to help avoid moisture inside the cubicle.1.3.5When the dehumidifier is started up, check the following: Siemens Wind Power A/S. All rights reserved.ZCH 1034788 / 195510 / 2015-05-263StepReferenceRemarksTool pos.TechnicianNot OKOK12/2 C14 Siemens Wind Power A/S. All r
10、ights reserved.ZCH 1034788 / 195510 / 2015-05-26StepReferenceRemarksTool pos.TechnicianNot OKOK Check that the dehumidifier starts and stops when turning the hygrostat up and down. Check the hygrostat setting: Check that hot air is streaming out of the wet air outlet. Che
11、ck that the dehumidifier is operating (fan blowing). Disconnect the wet air outlet connection to become able to see the rotor inside the dehumidifier. Using a flashlight, look into the wet air outlet to check that the rotor is turning very slowly. Remount the wet air outlet conn
12、ection.1.3.6Mount a moisture indicator (A9B10004413) on the inner side of one of the cubicle sections where the power modules are installed. Place the content of one A9B00082680 inside each cubicle section. Take the moisture-absorbing bags out of their aluminum bag and place them inside the cubicles just before use.1.3.7Replace the Zeerust VC2-1 VCI corrosion protection capsules (A9B00206146) mounted inside the c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 邀请参加行业峰会参会通知函5篇范文
- 会议室预定流程变更通知函7篇
- 实验室仪器应急保障方案
- 文化产品推广与市场拓展线上线下融合实施指南
- 地沟及盖板现场施工技术方案
- 隧道洞口开挖支护施工方案
- 工业储能柜项目技术方案
- 数据中心冷却阀项目施工方案
- 养老院日常运营管理制度
- 渔船制造项目绩效评价
- 2026湖北黄石市阳新县事业单位统一招聘107人考试参考题库及答案详解
- 2026年新疆事业单位招聘考试《职业能力倾向测验》真题
- 2026年天津卷高考语文作文全新真题解读及五篇范文
- 2026年高考全国1卷语文高考真题含答案
- BIM-建筑工程计量与计价 课件 第1、2章 工程造价概述、建筑面积计算 (2023 年规范 )
- 2026年军队文职营房管理面试面试宝典
- 国企工程管理岗笔试试题及答案
- 安徽宣城市2025-2026学年高一上学期期末检测物理试题(原卷版)
- 2026中信证券IT数据岗笔试题及答案考点速记版
- 恶性综合征护理
- 【《基于PLC的城市高楼供水控制系统设计》12000字】
评论
0/150
提交评论