Master Production ScheduleMaster Production Schedule generates orders for Items with Order Method (P-MPS, see Item Master). However data must be maintained in Maintain MPS Item screen. This screen is separately maintained and here user can override Economic Order Qty, Lead time, Lot Sizing Method. For users convenience Pull MPS Item screen is added so user can pull all MPS type items in one shot from Item Location. Item having BOM can be Make/Buy type, those which do not can only be of Buy type.Orders of a MPS Item will only be generated if there is net demand of item i.e. total demand(Sales Order, Warehouse transfer outgoing, Forecast, dependent demand of Item(if any) exceeds total supply(purchase, production, warehouse transfer coming in, on hand inventory).Following are typical steps to maintain data for MPS:1. Maintain Items in Item Master with Order Method P. 2. Maintain above Items in Item Location.3. Create Formula for Item.4. Create BOM of Item, attach Item to a formula, set BOM type Finished Good if Item is a Finished good set appropriate fill levels. Set BOM type Intermediate if Item is an intermediate(i.e. item has a formula and is used in some another formula). For containers set BOM type to Assembly if item is container assembly, here formula is not applicable.5. Release the BOM.6. In Maintain MPS Item screen maintain data. User can use pull MPS Item screen to maintain all data in one shot.7. Maintain company calendar, specify weekly holidays if any, Orders will not be generated on holidays.8. Maintain Planning calendars, at least one planning calendar is required to run MPS/MRP. Planning calendars in 7.10 have no origin date and are used to group data in forecasting and Planning worksheet.9. Maintain Forecasts of Items . Now that Forecasts in 7.10 are bucket less, one has to maintain data in forecast again. Data in forecasts are now saved on daily basis but is grouped by Planning Calendar. If user wants to view data with other calendar, he may select new calendar and click Change Forecast button on toolbar.10. In MPS setup maintain time fences, default planning calendar( required for MPS run). Also specify gross demand calculation functions for all the three demand ranges.11. Maintain sales orders of Items in sales order entry. If MPS Orders are to be generated (for demonstration etc) ensure that sales orders Qty exceeds On hand quantity in inventory.12. Create Warehouse transfer (Outgoing) for Items. Save Order but do not process it, this will create demand for Item. New field expected receipt date is added in version 7.1 and it has to be maintained.13. In Run MPS Item screen specify Item-Location range and Demand end date and click process.13. Open Planning worksheet to view results. 14. If exception orders are generated then view Demand Fence1/2 production and purchase orders, these orders are generated when order date falls in a time fence or falls beyond MPS run date.15. Confirm Orders in planning worksheet. Only confirmed orders can be transferred to a purchase order or a production batch.16. In Transfer MPS Production Order screen select Items to transfer, spe

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论