Project Annual Meeting-Safety  项目年会安全PPT演示课件_第1页
Project Annual Meeting-Safety  项目年会安全PPT演示课件_第2页
Project Annual Meeting-Safety  项目年会安全PPT演示课件_第3页
Project Annual Meeting-Safety  项目年会安全PPT演示课件_第4页
Project Annual Meeting-Safety  项目年会安全PPT演示课件_第5页
已阅读5页,还剩22页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

2017 Capex Forum-Safety,Tony ChenJan, 2017,Agenda议题,2016 Summary 2016总结2020 Dream 2020梦想2017 Work Plan 2017工作计划2016Safety Recognition 2016安全奖励,3,2016 Summary 2016总结,2016 Project Safety Data安全数据,Positive积极的: CLTI is OK 损工时工伤达到目标Gap差距: one fatality happened in Korea韩国发生一起工亡,4,2016 Summary 2016总结,2016 Project Safety Data安全数据,1,Gap差距: 1. FAI and incident number did not meet the pyramid 简单医疗处理及事件没有满足金字塔比例 2. Gap on SIF reporting SIF的报告存在差距,5,2016 Summary 2016总结,2016 Project Safety Data安全数据SIF Reporting SIF的报告,1,Gap差距: Active to report SIF 主动报告SIF,2016 Summary 2016总结,项目VPO-安全支柱 VPO-Safety Pillar 高空作业安全标准的提升Safety Standard Update and Implement-Working at height梯形检查在项目中的全面推行Trapezia rule for hazard reportingVPO安全支柱知识的改进Safety Test ImprovementCAPEX承包商的安全评估 Contractor Safety AssessmentCCTV在项目中的运用CCTV in Construction,改进Improvement,项目VPO-安全支柱VPO-Safety Pillar,2016 Summary 2016总结,Positive 积极: All Projects achieve target 所有项目通过了VPO审计,高空作业安全标准推行Safety Standard Update and Implement-Working at height,2016 Summary 2016总结,Positive积极 : it is implemented in all new projects 所有项目均执行了标准Gap差距: 1. Some contractors still do not understand the standard fully部分承包商理解不完整 2. Some scaffoldings do not meet our standard部分脚手架还不满足标准,梯形检查比率=隐患总数量/ES负责人隐患数量Rate= Total hazard number/Hazard number of ES leader,2016 Summary 2016总结,Positive积极 : The average rate is up 平均值处于上升Gap差距: Some projects are under average level部分项目在平均值之下,VPO-安全支柱知识改进Safety Test Improvement,2016 Summary 2016总结,Positive积极 : All projects get target90 所有项目达到了90分的目标Gap差距: Some projects are under average level一些项目在平均值之下,承包商评估Contractor Assessment,2016 Summary 2016总结,Positive积极 : Many contractors top management give feedback about this and push their site team to improve site safety performance 很多承包商的总部高层开始关注推动其现场团队进行整改,CCTV,2016 Summary 2016总结,Positive积极: 1. CCTV is in place in all projects 所有项目均安装了CCTV 2. All project need to review the CCTV 30 minute everyday at least 所有项目每天至少回顾30分钟的视频Gap差距: Can not access with mobile phone 无法通过手机客户端进行观看,工作方法说明书的差距,如何从PAPER WORK到能真正落地 Work method statement still in improving承包商安全管理人员的能力及领导力Competency of safety team of contractor员工不安全行为Unsafe behavior of contractor 安全文化Safety culture,Other Gaps其它差距:,2016 Summary 2016总结,14,2020 Dream 2020梦想,14,1,3,1,100,Number 1 food safety builder in APAC northMeasure: GFSI,1 Global Benchmark ProjectMeasure: Quality, PM,Ranking number 3 in eff. design in ABIMeasure: TTP, LEF,100% VPO sustainabilityMeasure: VPO,0 SIFMeasure: SIF,15,Master Plan 主计划,15,Collect data, open gaps,Benchmarking, close gaps,BM, cascade actions,Build system, training,PDCA, define actions, pilot,Implement pilot,Consolidate & Roll out,SDCA,PDCA,Monitor, improve design,Connect means & results in routine, embed VPO,2017,2018,2019,2020,BM best brewery & embed VPO,Define KPIs to measure effectiveness,Step change,PDCA for step change,16,2017 Plan 分计划,16,Collect data, open gaps,Benchmarking, close gaps,2017,2018,2019,2020,VPO-安全支柱VPO-Safety Pillar,事故/SIF的报告及调查SIF/Incident Reporting and Investigation,Build solid plan to minimize exposure to SIF 建立牢固的计划来将暴露在SIF下的活动减到最少,项目经理的安全领导力Safety Leadership of PM,承包商安全人员管理Management of safety team of Contractor,17,VPO-安全支柱VPO-Safety Pillar,17,Q1,Q2,Q3,Q4,All ES leader will be trained培训所有的ES负责人 -Tony Chen/ES leaders,Self-audit monthly and quarterly audit by HQ月度自评及总部季度审计-Tony Chen,All ES guys must be trained with PDCA所有的ES负责人培训PDCATony Chen/ES leaders,Develop new checklist编制新的审计问卷Tony Chen,18,事故/SIF的报告及调查SIF/Incident Reporting and Investigation,18,Q1,Q2,Q3,Q4,Safety APP in all projects在所有项目建立APPTony Chen/Lu Yigang,Incentive policy采取激励政策-Tony Chen/All Projects,Give safety training about SIF to all contractors给承包商培训SIFAll Project Team,All ES leader will be trained about this培训所有的ES负责人成为专家-ES leaders,19,Build solid plan to minimize exposure to SIF 建立牢固的计划来将暴露在SIF下的活动减到最少,19,Q1,Q2,Q3,Q4,Meeting with design institute与设计院讨论 -Bai Lei/Tony Chen,Get support from the third party引入第三方专家-Bob/Jim/Tony Chen,Standard team meeting and discuss with experienced contractor标准团队及与专业承包商讨论Standard team,20,项目经理的安全领导力Safety Leadership of PM,20,Q1,Q2,Q3,Q4,All PMs will be trained about safety leadership给所有的项目经理培训-Tony Chen,Build up safety culture in projects在项目中建立良好的安全文化-PMs,PMs should attend safety meeting and audit weekly参加周检及周会PMs,Review /Approve one permit daily每天审核/批准一份许可证PMs,21,承包商安全人员管理Management of safety team of Contractor,21,Q1,Q2,Q3,Q4,All ES from contractor must be interviewed by ABI面试承包商ES人员-Project ES leaders,The ES from contractors who is not competent will be dismissed from ABI开除不合格人员-Project ES leaders,All ES from contractor will be trained test by ABI培训及考试承包ES人员-Project ES leaders,All ES from contractor will be assessed monthly对承包商ES人员进行阅读评估Project ES leaders,22,.PRESENTATION TITLE GOES HERE 2016,22,2016 Safety Recognition2016年安全奖项,Li Linzhi李林志-ZHZ Pr

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论