



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
FORM 001-ESuspension and Abandonment Acknowledgement Statement for Large Facility Liability AssessmentsA liability assessment was prepared for (INSERT LICENSEE) for the (INSERT FACILITY NAME) facility located at (LSD) on (INSERT ASSESSMENT DATE). This declaration states that the assessment was executed in accordance with the following requirements:Suspension and AbandonmentThe estimate of suspension and abandonment cost was based upon a site-specific evaluation of suspension and abandonment needs and completed according to standard engineering practice. Qualifications of Personnel The liability assessment was conducted only by appropriately trained and experienced personnel. Where specialized expertise was required, professionals in good standing with their respective accrediting bodies reviewed and certified that work within their scope of practice.Factors Affecting Scope and AccuracyIn a separate section, the liability assessment report documents the conditions and data deficiencies that materially affect the scope or accuracy of the cost estimates provided. Discrepancies with the specified protocol were noted and, where applicable, a contingency budget was provided to ensure sufficient funds to address potentially significant liabilities that were not adequately evaluated.Basis for CostThe cost estimates provided are undiscounted current costs that include all tasks required to complete suspension and abandonment as specified by ERCB Directive 001.Closure StatementAs the Lead Assessor, I certify that I am a member in good standing of the professional association indicated below and conducted this work according to applicable codes of ethics and standards of professional practice and as declared above. Signature of Lead AssessorName (please print)Professional Association Date(stamp where applicable)ERCB Directive 001: Requirements for Site-Specific Liability Assessments / Appendix 2 (June 6, 2012) 1FORM 001-FReclamation and Remediation Acknowledgement Statement for Large Facility Liability AssessmentsA liability assessment was prepared for (INSERT LICENSEE) for the (INSERT FACILITY NAME) facility located at (LSD) on (INSERT ASSESSMENT DATE). This declaration states that the assessment was executed in accordance with the following requirements:Phase I Environmental Site Assessment The initial environmental site assessment used for the liability assessment meets or exceeds the requirements specified in Environment and Sustainable Resource Development (ESRD)publication T/573: Phase 1 Environmental Site Assessment Guideline for Upstream Oil and Gas Sites (as amended), as well as the supplemental requirements specified in ERCB Directive 001.Phase II Environmental Site AssessmentThe subsequent intrusive site assessment(s) used for the liability assessment has (have) sufficiently evaluated all of the issues identified in the initial site assessment in a manner that meets or exceeds Canadian Standards Association (CSA) Standard Z769-00: Phase II Environmental Site Assessment (as amended), as well as the supplemental requirements specified in ERCB Directive 001. RemediationThe remediation cost estimate is based on an appropriate remediation plan as specified in Directive 001. The remediation techniques used in this liability assessment have been proven to be effective in Alberta conditions and are expected to restore all surface and subsurface affected materials to current Alberta Environment reclamation certification standards.ReclamationThe reclamation cost estimate was based upon a site-specific assessment of outstanding surface or land reclamation tasks that will be required to apply for a reclamation certificate. Qualifications of Personnel The liability assessment was conducted only by appropriately trained and experienced personnel. Where specialized expertise was required, professionals in good standing with their respective accrediting bodies reviewed and certified that work within their scope of practice.Factors Affecting Scope and AccuracyIn a separate section, the liability assessment report documents the conditions and data deficiencies that materially affect the scope or accuracy of the cost estimates provided. Discrepancies with the specified protocol were noted and, where applicable, a contingency budget was provided to ensure sufficient funds to address potentially significant liabilities that were not adequately evaluated.Basis for Cost EstimatesThe cost estimates provided are undiscounted current costs that include all tasks required to complete remediation and reclamation as specified by ERCB Directive 001.Use of the ReportThe liability assessment was prepared for the use of (INSERT LICENSEE NAME), the Energy Resources Conservation Board, and Environment and Sustainable Resource Development (ESRD). Closure StatementAs the Lead Assessor, I certify that I am a member in good standing of the professional association indicated below and conducted this work according to applicable codes of ethics
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 数控线切割操作工应知考核试题及参考答案
- 2025年教育行业教育信息化建设报告:教育信息化建设策略与实施
- 2025年教师信息技术与课程整合应用研究报告
- 2025年文化与娱乐产业跨界合作案例分析报告
- 2025年物联网设备安全漏洞应对与防护策略深度解读报告
- 押题宝典执业药师资格证之《西药学专业二》试题附答案详解【b卷】
- 解析卷沪科版9年级下册期末试题含答案详解(考试直接用)
- 2025年农业科技产品区域代理合作协议书
- 2025年度酒店客房清洁外包服务承包合同
- 2025年度高品质桶装水配送服务及运输合作协议
- 《战略资源稀土》课件
- 《过程审核讲义》课件
- 中医内科学虚劳培训课件
- 人教版新目标九年级上英语教学计划
- DB41T 2086-2020 加油加气站内电动汽车充电设施建设技术规范
- 峥嵘岁月 课件-2024-2025学年高中音乐人音版(2019) 必修 音乐鉴赏
- GB 21258-2024燃煤发电机组单位产品能源消耗限额
- DB34T 4379-2023 农村房地一体不动产确权登记技术规程
- 数字媒体艺术史全册完整教学课件
- 电力建设施工技术规范 第5部分:管道及系统-DLT 5190.5
- 《矿物岩石学教学课件》1-2 矿物学
评论
0/150
提交评论