已阅读5页,还剩11页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
,南方科技大学现状初步调研报告 report of the present situation research in South china Science and technology university),规划区范围 PROJECT SCOPE,北依羊台山,南隔留仙大道与规划十号路相接,西侧为规划中的深圳大学新校区、建设中的南开大学金融学院和先进技术学院,东邻长岭皮水库,总面积为197.88公顷。,CHANGLINGPI RESERVOIR,YANGTAISHAN MOUNTAIN,LIUXIAN Major Arterial,NEW CAMPUS PLANED FOR SHENZHEN UNIVERSITY,Project scope,规划范围,The site has Yangtai Mountain in the north, in the south it links to Liuxian Road and l Guihua Street. In the west, it is Shenzhen University new part, Nankai University Finance Institute and the vanguard technology institute, in the east, it is close to Chang Lingpi reservoir, the total area is 197.88 Ha.,规划区北侧为山体,内部现状用地主要以工业、居住、绿地为主,具体数据如下表。,土地利用,Existing status of land use,The site has moutain in the north, existing land use have: Industrial Land, Residential Land, Roads and Squares Land as well as the Waters Area and Others, theres few Commercial and Service Facility Land, Government and Community Land, Municipal Utilities land, the green space and Specially-designated Land, following table show the detailed data.,规划区中用地均未出让(国有),但大部分用地已被旧村住宅和工业设施所占用。,权属情况,Present Situation Of Land Ownership,Non of the Land has any property, but the majority of the land has already been covered by the old village housing and the industrial facility.,规划区南邻十号路,南侧主干道留仙大道正在施工中。同时规划中的地铁5号线沿留仙大道从规划区南侧通过并设置了两个站点。 规划范围内除南侧十号路,北侧二线公路路况较好外,其余道路均为村民自建道路,多数质量较差,不成系统。,道路情况,Existing Status Of Road Condition,The site is close to the tenth road in south, the main road Liuxiang Road is under construction. the planned subway No 5th line along Liuxian road has two stops along the south line of the site. In the planning area, except the tenth road in the north, the road in the north side is in good condition, other roads are mainly built by the villagers themselves, most of them have bad and out of system.,地铁车辆段 Subway Trains Organizing Section,现状公共配套设施集中布局于规划区南侧的福光村内,包括小学1所,幼儿园2所,邮政所1所,社区居委会1所,社区警务室1所,居住小区级文化社1所,服务水平和覆盖范围都很有限。,公共服务设施现状,Existing Status Of Public Facilities,The present public facilities are mainly placed in the Fuguang village, which is in the south of the planning area, including 1 elementary school , 2 kindergarten , 1 post office , 1 community residents committee , 1 community police service room and 1 small residents culture society , the service level and the coverage area are very limited.,水体现状: 规划区南侧的大沙河自然景观较好,北侧有长西引水渠(明渠),渠宽约5米,水质良好。另一条为位于地下的东江引水渠,控制宽度为20米。 水渠和河道蓝线内禁止一切建设或其他影响水体水质的活动。,现状限制情况,Existing Status Of restriction,历史遗址: 规划区内共有历史遗址保护点处,主要分布在福光村四周的山体上。 历史遗址保护范围内禁止修建建筑物、构筑物和其他设施。,In the south of the planning area, Dasha River is in good condition, but it is polluted to certain extent because of polluted water from industries and residence.the area north of the Trans-things-West diversion channel (channel), Changling Yi Reservoir in the east, Xili reservoirs in thewest, drainage width of five meters, good water quality. Another one is the Dongjiang River diversion canal underground, control width is 20 meters, is important in Shenzhen City of drinking water drains, need to focus on protection. drains and watercourses within the Blue Line forbid any construction and other affected water quality activities.,现状限制情况,Existing Status Of restriction,Historical Sites,There are seven protected area within the site, mainly on the mountain around Fuguang villages. Forbid any construction within the historical building protected area.,Existing Water Condition,现状建筑情况,Existing architecture status,建筑层数(Building height) 以低层厂房和多层的旧村为主,Buildings In the planning area, are mainly divided into industry, residencial, commercial, public service facilities and dorms. Except some old villages and factory houses, most of the building quality are very bad.,现状建筑情况,Existing architecture status,建筑功能(Building Category) 建筑性质分为工业、居住、商业、配套、宿舍等。,Buildings In the planning area, are mainly divided into industry, residencial, commercial, public service facilities and dorms. Except some old villages and factory houses, most of the building quality are very bad.,现状建筑情况,Existing architecture status,层数划分 (Building Height Differentiate) 层数越高,可改造度越低; 层数约低,可改造度越高;,The higher the building floors The lower the Converting Feasibility,The lower the building floors The higher the Converting Feasibility,现状建筑情况,Existing architecture status,建筑可改造度 ( Building Converting Feasibility ) 可改造度越高,保留价值越大; 可改造度越低,保留价值越小;,The higher the Converting Feasibility The higher the Reserve Probability,The Lower the Converting Feasibility The Lower the Reserve Probability,现状建筑情况,Existing architecture status,建筑质量(Building Quality ) 质量越好,保留价值越大; 质量越差,保留价值越小;,The Better the Building Quality The higher the Reserve Probability,The worse the Building Quality The lower the Reserve Probability,Contradict Serious (with Basic ecologic control line、Historical preservationarea、Blue lines、Planning Road) Contradict Medium (with land ownership) Contradict Slightly,现状建筑情况,Existing architecture status,矛盾冲突(Contradiction) (与生态线、紫线、蓝线、规划道路) 矛盾越大,保留价值越小; 矛盾越小,保留价值越大;,The more serious the Co
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 井下电泵作业工岗位流程优化考核试卷含答案
- 电机检修工QC管理知识考核试卷含答案
- 2025-2026学年好爸爸大班说课稿
- 半导体辅料制备工8S执行考核试卷含答案
- 天然气制乙炔装置操作工核心实操竞赛考核试卷含答案
- 2025-2026学年大班说课稿分享真快乐
- 2025-2026学年党旗的故事说课稿
- 河北省沧州市四校联考2025-2026学年高三上学期11月期中物理试题(含答案)
- 广西崇左市2026年八年级上学期语文期中试卷附答案
- 2026年质检技术服务行业商业模式研究报告及未来五至十年政策红利与合规路径
- 2026年保安员资格考试题库(含参考答案)
- 主体劳务扩大清包合同9篇
- 【方案】2026算电协同(智算中心)技术方案
- 2026年物业管理服务人员知识培训考试题库附答案
- 交通运输行业春季策略:中东变局下航运船舶展望海峡受限类比弹簧压缩重视释放后全板块弹性-
- 铝方通吊顶施工常见问题处理方案
- 物业中控外包合同
- 2026年上海市闵行区高三二模英语卷(含答案及解析)
- 经营服务费合同范本
- 早期维新思想课件
- 第十八届“振兴杯”全国青年职业技能大赛(钳工赛项)决赛试题库-下(判断题)
评论
0/150
提交评论