




已阅读5页,还剩13页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1,8D-Methodology,8D-Methodology,2,Overview: the 8D Problem Solving Methodology is a systematic approach used for solving the real problems, the method helps to quickly find a full answer to the problem , Importance of the 8D report: the 8D Report is part of the 8D methodology , after completion of each step. The report is issued/updated by the team and additional documentation is attached as required, the 8D Report is used for monitoring progress and as a checklist, it ensures that all steps of the 8D process have been completed.the report reflects the current state of the problem solving work and is a living document. It can help teams and individuals to fix problems more speedily in future.,8D-Methodology,3,Input: A complex problem has to be resolved Task: Set up a team with relevant expertise Output: A powerful problem solving team,Tackle the problem as a team: Set up a small team, consisting of people who have relevant process and product knowledge, are willing to collaborate and who have the time, competence and technical expertise to solve the problem and initiate corrective action. The team must have a leader.,1.Use Team Approach,8D-Methodology,4,8D Checklist,1D - Team: 1.team member:3-10 members 2.relevant and necessary experts involve the team 3.clarify each members responsibility:team leader and team member 4.clarify the reporting method,5,Input: Powerful problem solving team Task: Specify existing problem with sufficient accuracy Output: Full problem specification Specify the problem: Use Problem Analysis to define the internal/external customers problem as accurately as possible.Bring out the core of the problem and quantify it. Collect and analyze data using statistical methods.,2.Describe the Problem(and verify),8D-Methodology,6,8D Checklist,2D - Problem Description and verify: 1. which customer refer this problem? 2. problem already known from prior cases? 3.visual inspection necessary? 4.mechanical inspection necessary? 5.electrical test necessary? 6.elements of problem identify clearly 7.descripte the problem with pictures/datas/others 8.whether need to break the problem into subproblem? 9.does the customer accept our description?,7,Input: Full problem specification Task: Protection of the customer against the influence of the problem by containment actions Output:Containment actions agreed with the customer Initiate containment action and check its effectiveness: Initiate measures which minimize the influence of the problem on the customer until a permanent solution has been found. Check the effectiveness of these containment actions continuously and if necessary, arrange for further action to be taken.,3. Implement and Verify containment Action,8D-Methodology,8,8D Checklist,3D - Containment Action: 1.risk assessement and,if : -reliability problems -line stop at the customer -reduce outgoing quality 2.possible containment actions: -additional test before shipment(sample based or 100%) -freezing of deliveries;(SHN) -call back from customer or field -rework at customer 3. define the containment actions 4. after the containment action should have a monitoring plan/ procedure. 5. document the containment action and inform all the people involved and affected.,9,Input: Full problem specification Task: Finding the true cause of the problem Output: True cause Identify the true cause(s) and check, whether it/they are really the true cause(s): Check whether the task can be carried out with the current team composition and make changes to the team if necessary. Use Problem Analysis to look for all the causes which could possibly explain the problem. Identify the possible cause(s)and test, by comparison with the problem specification and the existing data, whether a given possible cause is the most probable cause. Verify the most probable cause as being the true cause.,4. Find Root Cause,8D-Methodology,10,8D Checklist,4D - Root Cause: 1.identify prossible root cause owners 2.analyse all the possible deviation from: -suppliers - equipment/tools -staff -processes -environment 3. find the root cause of failure mechanism 4. identify the escape cause.,11,Input: True cause Task: select and verify corrective action for removing true or root cause Output: corrective actions which can remove the root cause Define the corrective action to be taken and check its effectiveness: Check whether the task can be carried out with the current team composition and make changes to the team if necessary. Look for all possible measures which could remove the causes and could solve the problem. Use Decision Analysis to select the optimum permanent corrective measures and verify,5.Select corrective action,8D-Methodology,12,8D Checklist,5D . Corrective Action and Verification: 1.identify possible corrective action by: -former corrective action from complaint /GTR/Hold Tag -define new corrective actions 2.select and verify corrective actions -evaluate these actions -risk analyse for this actions -verify the action in production trials 3.accurately specify the action(who ,when , what , where),13,Input: Cause removed by corrective action Task: Canceling containment action and adopting the corrective action Output: New standardized process sequence Implement the corrective actions and check their effectiveness: Check whether the task can be carried out with the current team composition and make changes to the team if necessary. Use Potential Problem Analysis to set up an action plan for introducing the corrective action(s)and define the running checks to be made to ensure that the cause of the problem has really been removed.,6. Standardize Process,8D-Methodology,14,8D Checklist,6D - Implementation of Permanent Corrective Action: 1.implement the corrective action and document the implementation. 2.Define and implement the monitor plan 3.Evaluate the corrective action effectivness(monitor parameter meet target?) 4.Cancel the containment action. 5.Whether need to develop the corrective action. 6.effective date?,15,Input: New standardized process sequence Task: Preventing renewed occurrence of this or similar problems Output: Prevention with TQM Define measures to prevent recurrence of the problem: Check whether the task can be carried out with the current team composition and make changes to the team if necessary. Modify the management and control systems, instructions, and usual procedures as necessary.Use Think Beyond the Fix in order to prevent recurrence of the same or similar problems in this or other places.,7. Prevent Recurrence,8D-Methodology,16,8D Checklist,7D - Prevention: 1.consider whether the systems, regulations, procedures etc, that maybe affected by the corrective actions need review and update 2.consider other products , processes, prodution lines ,locations etc. Where the similar corrective action is possible and suitable.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 婚前著作权侵权纠纷解决及赔偿协议
- 顶级国际论坛同声传译人才选拔与培养协议
- 工业级3D打印设备研发成果转化与技术支持服务合同
- 创业指导与职业规划师合作合同
- 智能硬件集成社交电商项目合伙人合作协议
- 子女教育项目投资与融资合作协议
- 文化遗产保护公益合作框架协议
- 三维动画制作流程与分工体系
- QC检验仪器管理维护培训
- 现场维修管理制度
- 交流电机理论分析
- 反应器详细设计说明书
- 无人机教员聘用协议书参考
- 变电站工程电缆沟施工设计方案
- 氧化铝仓库及氧化铝输送系统施工组织设计
- 章狭义相对论力学基础PPT学习教案
- 项目需求调研表模板
- 高清元素周期表(专业版)
- 投资框架协议中英文版
- 50吨汽车吊性能表
- 光荣升旗手PPT课件
评论
0/150
提交评论