




已阅读5页,还剩14页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Preoperative AP radiograph of a Type 2 radial head fracture.,Preoperative lateral radiograph of a Type 2 radial head fracture.,Preoperative lateral radiograph of the Type 2 radial head fracture.,The elbow is flexed and positioned on a radiolucent table. The incision begins just above the lateral epicondyle and extends down towards the ulna, passing directly over the radial head, as depicted.,The skin incision is brought down through the subcutaneous tissue and the common extensor origin is identified.,The common extensor origin is incised between the anconeus and the extensor carpi ulnaris over the capitellum radial head.,ANCONEUS,ECU,The upper edge of the capitellum and the radial head are exposed.,RADIAL HEAD,With sharp retraction and rotation of the radial head, the fracture is identified. Care must be taken not to extend this incision too far distally, as this may damage to the posterior interosseous nerve, as it lay over the radial neck.,ANNULAR LIGAMENT,RADIAL HEAD FRACTURE,A Freer elevator or small osteotome is introduced to mobilize the radial head fracture.,Close up view,CAPITELLUM,RADIAL HEAD,After anatomic reduction is achieved, K-wires are used to maintain the reduction.,K-WIRE,REDUCTION,After anatomic reduction is achieved, K-wires are used to maintain the reduction.,K-WIRE,REDUCTION,Using the external jig, a screw is placed such that it is countersunk below the articular surface of the radial head. In this example, a solid Herbert screw is utilized.,The reduced and fixed radial head. The Herbert screw seated under the articular surface. Occasionally, the second K-wire is exchanged for a Herbert screw.,FRACTURE,HERBERT SCREW,The range of motion of the forearm as well as pronation and supination are confirmed, and the reduction is visualized throughout in arc of motion of the elbow. If adequately fixed and stable, closure is performed.,FRACTURE,HERBERT SCREW,The common extensor mechanism is brought togethe
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 校报内容策划与编辑流程
- 2026届上海市浦东新区四校化学高二第一学期期末质量检测模拟试题含答案
- 山东省嘉祥一中2026届化学高一第一学期期中调研试题含解析
- 三种手术方法治疗四肢骨不连的疗效与随访对比研究
- 79例儿童侵袭性真菌感染的多维度剖析与临床启示
- 2026届浙江省乐清市乐成公立寄宿学校化学高二第一学期期中考试模拟试题含解析
- 2026届陕西省西安电子科技大学附属中学高一化学第一学期期中监测模拟试题含解析
- 福建省龙岩市武平县第二中学2026届化学高三上期中综合测试试题含解析
- 个人晋升工作述职报告
- 初中地理教学设计方案
- 《组织化学技术教程》课件
- 2023年11月中国信安电子六所人才公开招聘笔试历年高频考点-难、易错点荟萃-附带答案详解
- 公司期货交易及风险控制管理制度
- 维修单(标准模版)
- 市政工程占道施工方案
- GB/T 39965-2021节能量前评估计算方法
- GB/T 12243-2021弹簧直接载荷式安全阀
- GB/T 10066.4-2004电热设备的试验方法第4部分:间接电阻炉
- PMC知识培训课件
- CJJ82-2019-园林绿化工程施工及验收规范
- 个人信息(模板)
评论
0/150
提交评论