国际贸易合同(英文版).doc_第1页
国际贸易合同(英文版).doc_第2页
国际贸易合同(英文版).doc_第3页
免费预览已结束,剩余4页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

INTERNATIONAL SALES CONTRACT Contract No:0616Conclusion Date: November 7th , 2009Conclusion Place: Zhongxin digital Building,Beijing,ChinaThe Buyer: Great World Store,Newyork ,AmericaTEL:01188745608002 The Seller:Gome Home Appliance Company, Beijing,ChinaTEL:86he Seller agrees to sell and the buyer agrees to buy the undermentioned commodity according to the terms and conditions stated below:(1) Name of Commodity: Haier refrigerator Product description: (a) model number:BCD226STV (b)About the exterior appreance: total volume(L):226 power comsumption(kW.h/24h):0.6 effective area of freezer:58 effective area of variable greenhouse:43 effective area of storage room:125 dimentions(L*W*H):580*560*1786mm(c)About the function:Fresh kept; automatic thermostat;over-temperature alarm; led display;individual shutdown.Unit Price: $680 (680 dollars)per setQuantity:1000 sets (2)Contract Value:$680,000(six hundred and eighty dollars )(3)Country of Origin: China(4)Port of Shipment: Dalian,China(5)Port of Destination: Newyork,Ameirica(6)Time of Shipment: November 12th, 2009 (7)Packing: The goods must be properly packaged, suitable for ocean-going and long-distance land transport, moisture, shock, anti-rust resistance, rough handling, to ensure that the goods will not be damaged by the above reasons, so good to arrive safely. Any loss caused by poor packing should be born by the seller. (8)Marks: The seller must use non-fading paint to print each box number, size, gross weight, net weight, hanging position, this side up, Handle with care, keep dry and other words. (9) Insurance:The insurance shall be covered by the Seller under the term of CIF for 110% of the invoice value against all risks. (10) Terms of Payment: Letter of Credit. The buyer shall 30 days prior to shipment open an irrevocable credit contained the buyer as the payer and the seller as the beneficiary through U.S. bank. China bank should commit the credit after he received and verificated the following documents. (a)Full set of clean on board ocean Bills of Lading made out to Great World Store and blank endorsed marked freight to collect;(b)Commercial lnvoice; (c) The Inspection Certificate of Quality issued by CCIC of China;(d)Certificate of Origin; (e)Notice of Shipment. (11)Terms of Shipment: (a)The seller must notify the buyer name of the booking vessel and itstransportation routes 40 days before sail, for the buyer to confirm.(b)The seller must notify the buyer expected time of delivery, contract number, invoice amount, the number and the shipment weight and size of each piece 20 days before shipment.(C) The seller must notify the buyer of goods, quantity, gross weight, invoice amount, name of the vessel, and departure dates by telegraph/telex within 48 hours after shipment.(d) If any piece of cargo to meet or exceed the weight of 10 tons, 15meters long , 10 meters wide, the seller shall 50 days before shipment provide the buyer with five copies of detailed packing drawing, indicating detailed size and weight, so that the buyer can arrange inland transport.(e)Transhipment and Partial shipment are both not allowed. (12) Inspection: (a)The seller must test the quality of goods, specification and quantity fully and accurately, and issue a quality certificate to prove that the delivery is in accordance with the relevant provisions of the contract , but this certificate is not the fianl basis toprove quality of the goods, specifications, performance, and number .The seller should attach the written report contained inspection details and results of tests to the quality manual. (b)After the goods arrive at the port of destination, the buyer must apply to the U.S. Commodity Inspection Bureau for inspecting the quality of goods, specification and quantity , and issue a certificate of inspection. If you find that the quality, specification and quantity do not match with the contract, in addition to which insurance companies or ship shall be responsible for, the buyer has the right to refuse accepting the goods and claim to the seller,within 7 days after arrival at the port of destination .(c) If the inspection certificate can not be settled within the validity period of the contract for some unforeseen reasons, the buyer should telephone the seller to extend the inspection period for 3 days. (13)Claims:(a) Within 3 days from the date of the arrival of the goods at the final destination,if the quality,specification,quantity and packing of the goods are found not in conformity with the stipulations of this contract,the Buyer shall give a notice of claims to the Seller within the above mentioned time limit and have the right to lodge claims .(b)Considering the result from the defect of the goods ,the Buyer has the right to bring the claims for their damages against the Seller. The Seller shall undertake to make the compensation for claims,except those for which the insurrance company should undertake the obligations. (14)Force Majeuer:(a)If any contracting party could not fulfill the contract by resistance of force majeure, the period of time for compliance should be extended accordingly. (b) Hindered side should telegraph the other in the force majeure and termination , and deliever the Certificate issued by the competent bodies of the accident to the other for recognition by registered air mail within 14 days after the accident. (C)IF force majeure event continues more than 120 days, the other party have the right to send written notice by registered air mail, asking a party to terminate the contract,and notification come to effect immediately. (15)Law Application: (a)It will be governed by the law of the Peoples Republic of China under the circumstances that the contract is signed or the goods while the disputes arising are in the Peoples Republic of China or the defendant is Chinese legal person, otherwise it is governed by United Nations Convention on Contract for the International Sale of Goods. (b)The terms in the contract are based on INCOTERMS 1990 of the International Chamber of Commerce.(16)Arbitration:(a)All disputes in connection with this contract or the execution thereof shall be settled friendly through negotiations.(b)In case no settlement can be reached, the case shall then be submitt

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论