SC4475-946-02SY轮机系泊试验大纲(英文).doc_第1页
SC4475-946-02SY轮机系泊试验大纲(英文).doc_第2页
SC4475-946-02SY轮机系泊试验大纲(英文).doc_第3页
SC4475-946-02SY轮机系泊试验大纲(英文).doc_第4页
SC4475-946-02SY轮机系泊试验大纲(英文).doc_第5页
已阅读5页,还剩18页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

BUILDERNEW YANGZI SHIPBUILDING CO., LTD SHIPS No.YZJ2006-757. DESIGNERSHANGHAI MERCHANT SHIP DESIGN & RESEARCH INSTITUTE, CSSC 92500t Bulk Carrier DETAIL DESIGN 标 记 数 量 修改单号签 字日期 编制描打 校对描校 SC4475-946-02SY 审核总面 积 m2 共 23 页第 1 页 标检 审定日期 OUTLINE OF DOCKING TEST (MACHINERY PART) SDARI 目目 录录 1 1GENERALGENERAL .3 3 2MAIN ENGINE AND SHAFTING.3 3 3DIESEL GENERATOR SETS .4 4 4EMERGENCY GENERATOR SET.6 6 5COMPO. BOILER .7 7 6AIR COMPRESSORS AND AIR RESERVOIRS.8 8 7F.O. PURIFIERS AND L.O. PURIFIERS .1010 8M/E , G/E BOOST UNIT.1010 9L.O. AUTO FILTER .1010 10SEWAGE TREATMENT UNIT.1010 11INCINERATOR .1111 12QUICK CLOSING VALVE .1111 13BILGE AND BALLAST SYSTEM.1212 14WORKSHOP EQUIPMENT.1212 15E/R CRANE.1313 16AUTO. STAND-BY OF PUMPS.1313 17TEST OF TEMPERATURE CONTROL VALVES.1414 18TEST OF ALARM DEVICE FOR VARIOUS TANKS .1414 19TEST OF PIPING SYSTEM.1616 20CO2 FIRE EXTINGUISHING SYSTEM.1717 21REMOTE GAUGING SYSTEM.1717 22MECHANICAL VENTILATION SYSTEM (INCLUDING E/R & CABIN) .1818 23TEST REGULATIONS FOR REFRIGERATING SYSTEM .1818 24TEST REGULATIONS FOR AIR CONDITIONING SYSTEM .2121 25M/E MANEUVERING TEST .2323 1 1GeneralGeneral 1.1Allowable error of settings 1.1.1Allowable error of pressure setting value: 2.5% 1.1.2Allowable error of temperature setting value: 3 if 26 ), and only fluency of the steam system and humidification system to be carried out. 24.7Packaged air conditioner Packed air conditioners are import. Function test to be carried out after the installation of cooling water pipe, drill pipe and power are completed. 25M/E maneuvering test 25.1Maneuver in ECR 25.1.1Test the completion of the system and the installation of the ECC, measure the insulation resistance of the system. 25.1.2Check the working condition of the power supply units. 25.1.3Make the maneuvering test and M/E start/stop test according to the M/E control procedure. (The parameters & setting value for the tests to be according to the data supplied by manufactures.) 25.2Maneuver in bridge 25.2.1Make M/E st

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论