


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Site Security Table of Contents1. Introduction 2. Responsibility 3. Site Security 4. Site Security Plan 1. Introduction Proper site security arrangements are necessary to protect Companys and clients property. Security very much relates to safety and has a degree of overlap with safety.On construction projects within the fence of an existing plant, usually the clients security and guard arrangements will be applicable also to the construction of the new facilities.However, security relative to Companys site buildings and the documentation contained there-in on any project requires proper attention and measures.This section is to be considered a guide to setting up a security program for construction projects where there are no existing facilities and, thus, own all encompassing security arrangements have to be made by Company.2. Responsibility As for safety, the ultimate responsibility for security on site rests with the Project Construction Manager.The organizational structure of the Company site team, project size and clients requirements/involvement relative to security will determine who in the site organization will handle the day to day security matters. Generally, the Company Safety Manager will have functional responsibility with the administrative responsibility resting with the Office Manager. Alternatively the Office Manager may handle all security matters.3. Site Security 3.1 Guard ServiceAt the start of site activities arrangements have to be made for guard services at the site gate. Guard services can be obtained either by means of a subcontract to a specialized security firm or by hiring personnel locally on Companys payroll. Using a specialized firm usually has preference over hiring own personnel for a number of reasons e.g. experienced personnel can be expected, replacements during vacations and illnesses can be obtained, standard guard/security instructions will be available. Moreover the specialized firm processes all necessary permits/licences and registrations (to be checked!) as maybe required by authorities. When making arrangements for guard services consider: Facilities required e.g guardhouse, movable gate/boom, communications (telephone/portophone) etc. Hours of service i.e. day-service, night-service, 24-hours coverage, week-ends. Patrols, punchclocks, dogs, etc. 3.1.1 Guard DutiesThe duties of the guard(s) usually consist of the following (subject to local or project circumstances specific other duties may be assigned): Control of incoming and outgoing personnel, visitors and traffic and maintaining the necessary administration and records related thereto. Control of incoming and outgoing materials, tools, construction equipment, office furniture and equipment and any other materials or consumables, regardless of ownership. Control of firehazards in the working areas as well as in/around offices and shops, after working house. Control of security relative to Companys, clients and subcontractors offices, after working hours, with respect to clean disk discipline and the lock-up of desks, filing cabinets and cupboards containing project information and documentation. 3.2 Security Rules and InstructionsAs already said, security has a degree of overlap with safety. The following security rules and instructions shall therefore be read in conjunction with the Company Safety Manual, procedure CO-SP-501 Field Construction Safety Program.3.2.1 Security RulesSpecifically prohibited on the site, as related to security, are: Bringing and/or carrying of any weapons. Bringing animals (except guard/patrol dogs). Selling or the possession of alcoholic beverages or drugs. Selling, advertisement and distribution of newspapers, illustrated papers, leaflets, tapes, gadgets or promotional campaigns of a political, religious, moral, sexual or subversive nature. Bringing photo and film cameras and audio and video equipment without Companys prior approval. Making or repairing of items for private use/purposes. 3.2.2 Security InstructionsThe following are standard security instructions for any project which maybe complemented as required by specific project needs: Security guards will be instructed by Company/client only. They shall have orders to take instructions from no one else. All incoming and outgoing personnel, visitors and traffic shall be controlled in accordance with job specific security instructions. Visitors will be registered as such and receive a visitors pass. The guard at the gate shall warn the person to be visited before granting the visitor entrance to the site. Identification of visitors shall be in accordance with job specific security instructions. Erection of sign board on as well as off site requires the prior approval from Company and local authorities as required. All personnel working at the site shall be property identified and be in the possession of an identification card of badge. Type of identification shall be determined in the job safety/security plan. Such identification card/badge shall be returned to Company upon termination of employment on the site. The guards authority includes the right to search any person or vehicle before entry or exit and to refuse site entrance to any person not meeting security requirements. Trucks with incoming materials will be checked at the gate and the guard will direct them along the proper roads to the Company warehouse or unloading destination, after consultation with the Company Warehouse Supervisor. All materials, tools and equipment leaving the site require a Company Outshipment Report signed by an authorized person. This also applies to personal tools. As required, job specific security instruction shall prescribe the guards to make rounds after working hours to control particularly: clean desk and lock-up discipline open doors and windows switched on office equipment firehazards lighting switched on or off as required After normal working hours, the guard shall always be informed as to numbers and names of personnel working overtime and the name of the responsible supervisor(s). Modifying, cutting or removing site fencing may only be performed with the written approval from Company. On a regular basis Companys and Clients Safety/Security Officers shall conduct, after office hours, checks in cooperation with the Subcontractors security representative. 3.3 Security of Information and Documentation The Client may have his own procedure on protection of his proprietary information. In such cases Company should strictly adhere to the Clients procedure. Keep in mind that in the conduct of its business, Company is the custodian of confidential information of many Clients as well as its own, and possesses a substantial amount of proprietary information. All confidential information given to, or acquired by subcontractors and their employees relating to the business of Company and Client must be maintained in strict confidence. Every reasonable effort must be made by all concerned to prevent any unauthorized disclosure or use of such information. It is vital to our business and in the interest of the Client that the confidentiality of such information be preserved. Specific guidelines: After office hours, all Company and Clients proprietary information shall be secured in steel filing cabinets equipped with cylinder-type security locks. During lunch hours, all access doors to the offices in which proprietary information is maintained be locked when unattended. Company and Clients proprietary documents shall be destroyed either by shredding or a chemical process. Supervision by Companys Safety/Security Officer is recommended whenever documents are destroyed. Duplication of Companys or Clients proprietary information is only permitted with the written approval of the originator. Distribution of proprietary data is on a need-to-know basis only. 4. Site Security Plan Prior to the start of field activities a site security plan as part of the site safety plan must b
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025版会计师事务所专项审计与调查服务合同
- 二零二五年度毛绒玩具产品库存管理合同
- 2025版离婚协议签订后反悔的婚姻调解程序
- 二零二五年度生态环保工程承建协议合同
- 2025版多功能农业机耕服务合同
- 2025版房产抵押贷款期限延长合同规定
- 二零二五版吊装作业安全教育培训及协议
- 2025版离婚夫妻子女抚养权及财产分配及子女教育协议
- 二零二五年度城市轨道交通招标合同样本
- 二零二五年度新能源汽车充电站项目可研报告编制合同
- 2025-2026秋学期学校主题升旗仪式安排表+主题班会安排表
- 出租充电桩车位合同范本
- 2025年广元市中考数学试题卷
- 人工晶体创新创业项目商业计划书
- 2025年9月新版劳务用工合同范本(可规避风险)
- 开放性骨折感染预防的护理
- 特殊困难老年人家庭适老化改造项目方案投标文件(技术方案)
- 特殊药品管理知识讲课文档
- 2025至2030中国智能算力行业发展趋势分析与未来投资战略咨询研究报告
- 2025年小额贷款合同范本
- 混泥土计量管理办法
评论
0/150
提交评论