全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
.SALES CONTRACT NO.: SMST/24116 DATE: Jul.15., 2006 THE SELLER: SAMSUNG CORPORATIONSAMSUNG-PLAZA BUILDING 263, SEOHYEON-DONG,BUNDANG-GU, SEONGNAM, GYEONGGI-DO, KOREA 463-721TEL: 82-2-2145-2500 FAX: 82-2-2145-2596THE BUYER: ZHEJIANG ALISON IMP. & EXP. CO., LTD.C-719,WORLD TRADE CENTRE OFFICE BUILDING122 SHUGUANG ROAD, HANGZHOU,310007 CHINATel: 0086-571-87631686 Fax: 0086-571-87950611This Contract is made by and between the Buyer and Seller, whereby the Buyer agree to buy and the Seller agree to sell the under-mentioned commodity according to the terms and conditions stipulated below:Commodity & specificationQuantityUnit priceAmountHDPE GRADE NO.9004HDPE GRADE NO.3234204MT198MTCFR SHANGHAIUSD937.00/MTUSD927.00/MT USD191148.00USD183546.00TOTAL402MTUSD374,694.00TOTAL CONTRACT VALUE: SAY U.S. DOLLARS. THREE HUNDRED SEVENTY FOUR THOUSAND SIX HUNDRED AND NINTY FOUR ONLY. PACKING: 0.2 MT are packed in one export standard MARKS:Shipping mark includes SAMSUNG, S/C no., grade no., port of destination and carton no.TIME OF SHIPMENT : Not later than AUG.10., 2006PORT OF LOADING AND DESTINATION: From Shanghai, ANY TAIWAN PORTTransshipment is allowed and partial shipment is allowed.TERMS OF PAYMENT : By irrevocable Letter of Credit at 90 days after B/L, reaching the seller not later than Jul.25, 2006 and remaining valid for negotiation in China for further 21 days after the effected shipment. In case of late arrival of the L/C, the seller shall not be liable for any delay in shipment and shall have the right to rescind the contract and /or claim for damages.DOCUMENTS:+ Signed Invoice in triplicate, indicating L/ C No. and Contract No. + Full set (3/3) of clean on board ocean Bill of Lading marked “freight prepaid” made out to order blank endorsed notifying the applicant.+ Packing List in triplicate.+ Certificate of Quality and Weight in 3 copies issued by manufacturer+ Beneficiarys Certified copy of fax dispatched to the applicant within 2 days after shipment advising the contract number, name of commodity, quantity, invoice value, bill of loading, bill of loading date, the ETA date and shipping Co.CLAIMS:In case discrepancy on the quality or quantity (weight) of the goods is found by the buyer, after arrival of the goods at the port of destination, the buyer may, within 30 days and 15 days respectively after arrival of the goods at the port of destination, lodge with the seller a claim which should be supported by an Inspection Certificate issued by a public surveyor approved by the seller. The seller shall, on the merits of the claim, either make good the loss sustained by the buyer or reject their claim, it being agreed that the seller shall not be held responsible for any loss or losses due to natural cause failing within the responsibility of Shipowners of the Underwriters. The seller shall reply to the buyer within 30 days after receipt of the claim.LATE DELIVERY AND PENALTY:In case of late delivery, the Buyer shall have the right to cancel this contract, reject the goods and lodge a claim against the Seller. Except for Force Majeure, if late delivery occurs, the Seller must pay a penalty, and the Buyer shall have the right to lodge a claim against the Seller. The rate of penalty is charged at 0.5% for every 7 days, odd days less than 7 days should be counted as 7 days. The total penalty amount will not exceed 5% of the shipment value. The penalty shall be deducted by the paying bank or the Buyer from the payment.FORCE MAJEURE:The seller shall not held responsible if they, owing to Force Majeure cause or causes, fail to make delivery within the time stipulated in the Contract or cannot deliver the goods. However, in such a case, the seller shall inform the buyer immediately by cable and if it is requested by the buyer, the seller shall also deliver to buyer by registered letter, a certificate attesting the existence of such a cause or causes.ARBITRATION:All disputes in connection with this contract or the execution thereof shall be settled amicably by negotiation. In case no settlement can be reached, the case shall then be submitted to the China International Economic Trade Arbitration Commission for settlement by arbitration in accordance with the Commissions arbitration rules. The award rendered by the commission shall be final and binding on both parties. The fees for arbitration shall be borne by the losing party unless otherwise awarded.This contract is made in four original copies and becomes valid after signature, two copies to be held by each party. Signed by: THE SELLER: THE BUYER:SAMSUNG CORPORATION ZHEJIANG ALISON IMP. & EXP. CO., LTD. Peter White 王 伟ATTACH
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 政务专业求职路全方位了解面试策略
- 外包沟通专员员工沟通培训资料
- 小学教师面试必-备技能湖南地区面试技巧
- 店长员工激励方案
- 幼儿园学期工作计划与家园共育实施方案
- 2025年体育历年面试题及答案
- 小学美术教师职称面试儿童美术教育技巧探讨
- 2025重庆三峰环境集团股份有限公司招聘14人笔试历年参考题库附带答案详解
- 市场部年度营销活动策划方案及预算安排
- 2025湘科安全服务产业集团子公司招聘中层管理人员2人笔试历年参考题库附带答案详解
- GJB1406A-2021产品质量保证大纲要求
- 运动素质知到课后答案智慧树章节测试答案2025年春浙江大学
- 【MOOC】融合新闻:通往未来新闻之路-暨南大学 中国大学慕课MOOC答案
- JGJ376-2015 建筑外墙外保温系统修缮标准
- 下肢深静脉血栓护理业务学习
- 20212022(2)学期医用物理学学习通超星课后章节答案期末考试题库2023年
- 房地产管理-华中科技大学中国大学mooc课后章节答案期末考试题库2023年
- 中华碑帖精粹:赵孟頫胆巴碑
- 《绿色化学》教学大纲
- 教师职业道德与专业发展知到章节答案智慧树2023年山东师范大学
- 科研方法与论文写作
评论
0/150
提交评论