三验厂2013年10月30日DongguanRongfeng Printing Ltd- CAP-Technical Audit @ ASL -20131030.doc_第1页
三验厂2013年10月30日DongguanRongfeng Printing Ltd- CAP-Technical Audit @ ASL -20131030.doc_第2页
三验厂2013年10月30日DongguanRongfeng Printing Ltd- CAP-Technical Audit @ ASL -20131030.doc_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

ASL Technical Audit Correction Action Plan (CAP)Quality Program ManagementSupplier Name 供应商名称Dongguan Rongfeng Printing LtdFactory Name 工厂名称Dongguan Rongfeng Printing LtdFactory Location工厂所在地No 5, Sixing Street, Sijia, Shijie Town, Dongguan, GuangdongAudit Date 评估日期30 October 2013Supplier / Factory Lead Contact 供应商/工厂主要联系人Janice HuContact Email / Phone 联系人电邮 / 电话 /ajor Products Manufactured by Factory工厂主要产品Gift BoxesAuditor评估组成员Tim Wang 7. 0 Audit Score Breakdown审核得分Audited Section(s)Full ScoreWeightageFull Weighted ScoreActual ScoreActual Weighted Score7.1. Design and Engineering175%0.850.000 7.2. Analytical Process105%0.50 0.000 7.3. Manufacturing Process3030%9.00 0.000 7.4. Quality Control and Management System6130%18.30.000 7.5. Equipment Management88%0.64 0.000 7.6. Supplier and Materials Management1912%2.28 0.000 7.7. Order Fulfillment and Business System 124%0.48 0.000 7.8. Personnel Training / Certification103%0.30 0.000 7.9. Customer Satisfaction83%0.240.000 Total175100%32.59 00.00 0.0%8.0 Technical Audit Summary 审核总结ASL Finding(s) / Observation(s)发现/观察到的不符合项目Priority Level优先级别Factory Response工厂反应1. No related records of product safety and regulatory requirement.12. No pre-production review meeting minutes provided for review. No related follow and validate actions.23. Some FAI is not placed in appropriate location for reference.24. Work Instructions (WI) is not visible at the correct lacations.25. Inadquate record for 100% checking on FG (Finished Goods) before packing.26. No defined quality targets regarding First Pass Yield (FPY) of product.27. Inadequate segregation and identification for inspected/not inspected, passed/failed products.28. No packing WI and sample of packed product placed at packing area for reference.29. Material not identified by different label (passed/reject/concession to accept).210. No process to apply for inspection of goods.111. Inedquate on-the-job training record for check, no training for QC.212. Inadquate customer satisfication records for check.213. No target regarding customers complaint / re

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论