技术交底记录表 编号:HYPEC-PCT-JSJD-01G-01-02-06-001作业项目名称1#炉水压试验交底时间施工单位湖北二建施工负责人交底地点交底内容一、水压试验目的:Objective of hydrostatic test锅炉受热面安装完毕后,为了在冷态下检验系统内承压部件焊口、母材、阀门等部件的严密性及强度,按设备技术文件的要求对锅炉本体及附属管道进行水压试验。After finishing installation of boiler heating surface, in order to test tightness and strength of compressive parts like welding joint, parent metal and valve of the system in cold state, hydrostatic test has been done for boiler proper and its auxiliary piping according to requirements of technical documentation of the equipment.二、水压试验范围:Scope of hydrostatic test本次锅炉水压试验分一次汽(过热汽)系统和二次汽(再热汽)系统两部分进行:一次汽:1、锅炉一次汽系统水压试验范围包括锅炉本体受热面系统内的锅筒、水冷壁、省煤器、过热器、减温器及连接管道。从高压给水操作台到高温过热器出口水压试验堵阀止。2、锅炉本体范围内过热器管道系统:过热器减温、紧急放水、再循环、放气、加药、疏水、反冲洗、连排、定排、取样、充氮、水位计管道、邻炉加热等附属管道一次门内,水位计只参加工作压力试验。3、热工仪表:压力取样、锅筒液位计等一次门内。二次汽:锅炉二次汽系统水压试验范围包括壁式再热器、中温再热器、高温再热器及再热器减温器、再热器导管。从冷段到再热器出口水压试验堵阀止。锅炉本体范围内再热器管道系统:再热器减温、放汽、疏水、取样等管道一次门内。三、系统流程:System flow一次汽:高压主给水管道省煤器入口导管省煤器进口集箱省煤器蛇形管组省煤器悬吊出口集箱连接管锅筒集中下降管下水连接管水冷壁进口集箱水冷壁管屏水冷壁出口集箱汽水连接管锅筒饱和蒸汽连接管顶棚进口集箱蒸汽连接管两侧包墙进口集箱包墙管排包墙环形集箱低温过蛇形管低过出口集箱导管全大屏进口集箱全大屏管排全大屏出口集箱导管后屏过热器进口集箱后屏管排后屏出口集箱导管高温过热器进口集箱高温过热器管排高温过热器出口高温过热器出口导管高温过热器出口水压试验堵阀 顶棚进口集箱顶棚管顶棚出口集箱集箱连接管延伸侧包墙进口集箱延伸包墙管排延伸包墙下集箱连接管包墙环形集箱(同上)吹灰器源站Main feed water piping of high pressure conduit at entrance of economizer entrance header of economizer serpentine tube set of economizer hanging exit header of economizer connecting pipe steam drum centralized downcomer sewage connecting tube water wall tube entrance header panelized-tube-wallsection water wall tube exit header steam-water connecting tube steam drum saturated vapor connecting tube ceiling entrance header steam connecting tube both side wall enclosure entrance header wall enclosure tube bundle ring header of wall enclosure pass serpentine tube in low temperature pass exit header in low temperature conduit entrance header of full big platen tube bundle of full big platen exit header of full big platen conduit entrance header of rear platen superheater tube bundle of rear platen exit header of rear platen conduit entrance header of high temperature superheater tube bundle of high temperature superheater exit of high temperature superheater exit conduit of high temperature superheater plugged valve for hydrostatic test at exit of high temperature superheaterCeiling entrance header ceiling tube ceiling exit header header connecting tube wall enclosure entrance header at extended side tube bundle of extended wall enclosure header below extended wall enclosure connecting tube ring header of wall enclosure (same as above)Source station of soot blower二次汽:汽机冷段壁式再热器进口集箱壁式再热器管排壁式再热器出口集箱再热器减温器中温再热器进口集箱中温再热器管排高温再热器管排高温再热器出口集箱高温再热器出口导管高温再热器出口水压试验堵阀Cool zone of turbine entrance header of wall reheater tube bundle of wall reheater exit header of wall reheater attemperator of reheater entrance header of mid temperature reheater tube bundle of mid temperature reheater tube bundle of high temperature reheater exit header of high temperature reheater exit conduit of high temperature reheater plugged valve for hydrostatic test at exit of high temperature reheater四、水压试验压力:Pressure of hydrostatic test一次汽工作压力为:18.59Mpa,超压压力为:23.24Mpa。二次汽工作压力为:3.8Mpa,超压压力为:5.7Mpa。五、水压试验的升压速度:升压应平稳缓慢,升压速度不超过0.294MPa/min。升压至超压压力的10%时,停止升压,对系统进行初步检查,若无异常情况继续升压;然后升压至锅筒工作压力18.59Mpa,停止升压,对系统进行全面检查,检查结束若无异常,方可进行超压试验。超压时升压速度一般不超过0.1MPa/min。Close outlet valve of water filling pump, start pressure testing pump to boost pressure. Pressure shall be boosted smoothly and slowly, and pressure boosting speed shall not exceed 0.294MPa/min。When boosting pressure to 2.4Mpa, stop boosting pressure, and make rough check for the system. If no abnormality found, continue boosting pressure until working pressure of boiler drum reaches 18.59Mpa, stop boosting pressure for full check to the system. If no abnormality found after the check, overpressure test may be done after directed for boosting pressure by test leader. When overpressuring, pressure boosting speed shall not exceed 0.1MPa/min.交底主持人:交底人:接受交底人:安全交底记录表 编号:HYPEC-PCT-AQJD-01G-01-02-06-001作业项目名称1#炉水压试验交底时间施工单位湖北二建施工负责人交底地点交底内容1. 参加水压试验的所有人员,必须参加水压试验技术安全交底,并办理交底手续。All personnel participating in hydrostatic test must take part in technical and safety disclosure of the test, and formality of disclosure shall be handled.2. 水压试验所用压力表的量程合格,经检验合格且在有效期内,水压试验时应同时投入两只以上表计。Range of pressure gauge used for the test must be qualified, or pass inspection and be within valid period. During hydrostatic test, more than 2 gauges shall be put into use at the same time.3. 水压试验时,检查人员不得站在焊接堵头正面或法兰的侧面。During the test, inspector is not allowed to stand in front of weld plug or at side of flange.4. 水压试验临时管道安装前,应进行清理,确保管内无杂物,按同等级管道的焊接要求进行焊接,并对焊缝按要求检查。Before installing temporary pipeline for the test, it shall be cleared to ensure there is no miscellany in pipeline. It shall be welded according to welding requirments of pipeline of the same class, and weld joint shall be inspected as per requirments.5. 水压试验的升降压的指挥应有专人负责,上水泵、升压泵、阀门操作应有专人负责,其他人员不得随意操作,负责人不得擅离岗位。Special person shall be assigned to be responsible for commanding pressure boosting and drop during hydrostatic test, and for operation of water filling pump, pressure boosting pump and valves, no other person is allowed to operate. Responsible person is not allowed to leave work post without permission.6. 在做超压试验前,施工负责人必须清点人数,待所有检查人员全部撤离,检查现场后,方可升压。Before starting overpressure test, construction leader must count number of workers. Pressure can not be boosted until all inspectors leave and site is checked.7. 水压试验时应停止锅炉范围内的一切工作,非作业人员不得进入试验范围,并及时拉警示绳并挂警告牌,并在各通道口设专人监护During hydrostatic test, all work in scope of boiler shall be stopped. Non-operating personnel is not allowed to enter test area. Warning rope and plate shall be set up timely and special person is assigned to guard at all passages.8. 严禁在承压管道和部件上引弧施焊或锤击承压部件。Arc striking for weld on compressive pipeline and part, or hammering compressive part, is strictly prohibited.9. 在升压过程中,应有专人负责监视上、下压力表读数,并随时校对压力表读数,防止压力表损坏引起实际压力超过试验压力。During pressure boosting, special person shall be provided for monitoring readings of upper and lower pressure gauge, and checking the readings to prevent pressure gauge damaging and that actual pressure exceeds test pressure as a result.10. 一次汽系统进行水压试验时,应将再热器系统上的空气门打开,防止二次汽系统超压。气压试验结束后,须将气压系统与水压系统断开。When hydrostatic test is done for primary steam system, air valve of reheater system shall be opened to prevent overpressuring of secondary steam system. After finish of pneumatic test, pneumatic system shall be cut off from water pressure system.11. 所有阀门应编号挂牌,由专人负责操作。水压试验检查时应分组由专人负责检查,进入炉内检查的人员不得单人进行,必须二人以上,且炉外有专人监护,检查后出来清点人数后临时关闭人孔门。All valves shall be numbered and marked with sign plate, and operated by special person. During check of hydrostatic test, it shall be grouped and in charge by special person. Single inspector is not allowed to enter furnace for inspection, at least 2 persons together can do so, besides, special person is provided at outside of furnace for guarding. After inspection, number of persons out shall be counted again before manhole is closed temporarily.12. 加入防腐保护药品时,操作人员应正确配戴防护用品,药品及操作人员周围严禁明火和吸烟。When dosing anti-corrosion protective agent, operator should be equipped with correct protection products. No open fire and smoking are allowed nearby the agent and operator.13. 在检查过程中,如发现有渗漏现象,应作好标记,及时向指挥组报告,不得擅自处理,检查人员应远离渗漏点。During inspection, if any seepage or leakage is found, it shall be marked, and reported to commanding group timely. No personal handling can be done, and inspector shall stay away from leakage spot.14. 水压试验检查需要搭设的脚手架应牢固,符合规定要求,且经验收合格。Falsework needed for inspection shall be erected soundly up to specified requirments, and pass acceptance.15. 水压升压管路要固定牢靠,防止升压时管路震动导致危险。Water pressure boosting line shall be fixed soundly, to prevent danger from pipe shaking during pressure boosting.16. 炉内布置的照明应充足,电源线应完好,并有漏电保护装置。Lighting arranged in furnce shall be proper, with good and complete power line, and protection device for electric leakage.17. 水压试验时应配备足够通迅工具(对讲机),检查完好,电池充满电并准备备用电池,保证通讯联络畅通。Enough communication tool (intercom) shall be provided during hydrostatice test, checked in good condition, fully charged with spare battery, to ensure good c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 IEC 60652:2002 FR-D Loading tests on overhead line structures
- 【正版授权】 IEC 60794-1-119:2025 EN Optical fibre cables - Part 1-119: Generic specification - Basic optical cable test procedures - Mechanical tests methods - Aeolian vibration,Method
- emft考试试题及答案
- 建筑电工试题及答案
- 休克抢救面试题及答案
- 外科上学期考试题及答案
- 廉洁为民面试题及答案
- 产后饮食考试题及答案
- 小猪障碍测试题及答案
- 危运装卸员试题及答案
- 妇产科中医护理应用
- 2025至2030中国轮椅行业项目调研及市场前景预测评估报告
- 2025-2030中国注射用硝普钠行业市场发展分析及发展趋势与投资方向研究报告
- DB31/T 618-2022电网电能计量装置配置技术规范
- 2025年杀菌藻剂项目市场调查研究报告
- 2025四川农商银行社会招聘笔试历年典型考题及考点剖析附带答案详解
- 健身数据分析与管理平台企业制定与实施新质生产力战略研究报告
- 小学与初中科学课程衔接策略
- (完整版)西门子ARCADICOrbic3D三维C型臂培训
- 检验科免疫室工作制度
- 《智能感知技术》课件
评论
0/150
提交评论