STEEL SDN. BHDIMP 1# Blast Furnace Stoppage Proposal Prepared by: Yu Yu FeVerified by: Zhe Ru, Che We FenApproved by: Wan She HuIMP7/10/2015 1. OrganizationCommander: Zh Deputy Commander: Chen W, Woo Wing Nan, and Wang TanMember: Chia Kay Kiat, Yu Feng, Wu Shi, Zha Tie, Li Gu Mi, Liu Qing Jiang, Yang Yu Fe, Su We, Wan Ju We, Guo We Zho, Liu Hai Qing Gao X Do, Wan Zh, Re Xia M, Wa Ha Cu, Gu Yo Ga, Ca Mi Ze, Yan Su Li, To Zhi Ga.2. The shutdown time: 17 October 2015 (Estimated)3. The shutdown method: lowering charge level, or lowering stock line4. Shutdown Requirements1. Ensure the personnel safety, equipment, Co gas, operation of shutdown process to realize safe and smooth shutdown;2. Control of water and air flow, control the furnace temperature, tapping clean lowering stock line till tuyere height area, to shorten the process period. 5. Preparations for the shutdown1. Ensure a stable material, arrange short positions for each silo, fully empty material and coke bunker before blow off. (Responsible person: Yuan Yu Feng, Li Guang Ming, Wang Hai Cun)2. Two days before the shutdown, stop using lump ore, make sure 2 flow of Co gas is proper distribute the edges, use fluorite cleaning BF walls, reducing coke burden and the temperature control 0.6-0.8% , Basicity of slag control R2=1.00 0.05 But hearth temperature stability must be guaranteed. (Responsible person: Li Guang Ming)3. 2 Days before shutdown, increase the taphole angle (13 ), and let the tapping flow with suitable rate. (Responsibility people Zh, Li, Liu )4. Enhance BF cooling system checkup before the shutdown, especially the tuyere, and slag area. Promptly replaced if finding leaking, such as cooling wall leaking should be shut down immediately, strengthening the external water. (Responsible person: Rn)5. BF Top water sprays hose and sprays water methods, install 4 spray tube. Pipes according to requirement, with diameters 32mm pipe, long 4000mm, close to the wall 1000mm-stinging, with the remainder open diameter 3mm eye, 3 rows (60), Interval 60mm, furnace end-smashing tips welded shut, and testing ahead. (Responsible person: Zhain)6. Pre-ready BF top water devices, control water valves installed on the air platform region, four-way pipe double valve control, all water pressure water pressure not less than 0.90MPa, there is enough water, install a pressure gauge on each of the four pipe and flow meter. (Responsible person: Zhanin, and Li, and Gung)7. The temporary stock Rod installation projects (need to be able to reach 16m). (Responsible person: Zhaowei, and Wan, and Chai e)8. Check the lighting installed in every platform. (Responsible person: Che)9. During Lowering stock line period , all participants are required to become familiar with the process as a whole, the Division of responsibilities clearly, in particular water, air patrol, temperature detection focus must be clearly responsible and must advance the associated exercises and simulations to ensure implementation without any accidents. (Responsible person: Li, anxiang)10. Enhancing each equipment inspection and maintenance of equipment, reduce or eliminate risk caused by equipment failure to blow off. (Responsible person: Zhang Tiessfully)6. Blow off work (predicted)1. Assuming 10-12 hours blow off (for reference only).2. Stopping the use of materials and time schedule.IMP calculated the blow off material, shut down material and covering coke: Coke 5500kg, 9 batch; adds covered face, empty stock line 78M to blow off, Blow off time 7:00pm start blow on (and take charge of blow off material determined by the 1# blast furnace based on speed.(Responsible person: Lduty)3. Pre blow off stop charging material, emptied all bunker, and emptied all the weighing Hopper, Concentrate hopper.(Responsible person: Yuan YuCun)4. Removing grease and insulating material around the BF top, stop BF top lubrication oil; to prevent BF top caught fire during lowered stock line process. (Responsible person: Yaiang)5. Inspection of instruments, on top of thermocouples, pressure gauges and display instrument for comprehensive proof, including temperature and direction, in order to ensure accurate temperature during the empty stock line. (Responsible person: Chae)6. The installation of water pipes and adjusted correctly. (Responsible person: Zhannmin)7. Install soft sounding rod and proofread zero installation, adjusted normal. (Responsible person: Zha Waaicun)8. Inspect examination of cooling equipment; ensure there is no leaking in BF during lowering stock line process. (Responsible person: Rein)9. Deduster collector and the effective partition of blast furnace (sand), connected with the atmosphere, close the dust collector manhole and N2, a gas pipeline shut the valve. (Responsible person: Wag)10. Other safety precautions works:1) Blast furnace bleeding valve removed after pre-blow off (Res Li)2) associated company coal of stakeholders, monitoring personnel to the scene, pull up a security cordon, contact fire trucks, ambulances on standby (Responsible person: Wan)3) Blast furnace chutes removed, lower sealing install blind flange. (Responsible person: Zhai Cun)7. Lowering stock line operation1. Lowering lines process personal arrangement by the production section and the 1# blast furnace site organization, equipment, Baowei, co2 gas section.2. During lowering stock line period during production section, safety section must monitoring site safety, checking, and validation work.3. Spray Water operations:1. Put in nitrogen into bf top during lowering stock line process.2. Pick up gas sample every 30 minutes during lowering stock line process for testing h2, and CO, o2, and CO2 content.3. Controls the atomizing water 1st valve opening of 80% (keep open), the 2nd valve according to the temperature control of water by the person responsible for the operation. (Responsible Person: Shift in charge)4. Open atomized water before spray water, according to bf top temperature spray water, shower valve operation operated by “Ren Xian min”.5. Operation strictly according to the temperature control requirements, such as full temperature exceeded the maximum limit, timely wind reduction in the furnace. (Shift in charge)4. Temperature control during lowering charge level: 250 400 , mainly by adjusting the top water and air volume control. 5. BF Top water is the key to stability, Water supply must be stable to prevent vapor explosions cause the lining collapsed, especially to eliminate risk top temperature is less than 100 . Small amount of water in the early, and gradually increase, while according to the temperature fluctuation trend, slow adjustment corresponding to the point of water in advance. The top temperature 300c progressively decreased; reduce water points in advance, and vice versa. As the line continues to reduce, air flow will automatically increase when water alone cannot control the temperature, must reduce air flow control, reduced air flow in order to reduce wind pressure 1020kPa/ . 6. Blow on after pre-blow off, if the stock line is above the furnace body, you can control the air flow in the air 80 90% about (150090% = 1350m3/h) 。 7. Stock line lowering to body, lower, control air volume around 60% 70% (150060% = 900 m3/h , 150070% = 1050 m3/h )。 8. When Stock Line down to furnaces at waist, wind 50% (150050% = 750m3/h ) And avoid volume too high may lead to stroke to pipeline. 9. When Stock Line down air signs: the Tuyere Coke disappeared, air inlet is dark red or hang slag. To ensure safety, the wind pressure shall not be less than 30kPa, shall not stop the water in the middle. 10. During lowering stock lines in the process, do not stop exhaust, wind, if it is necessary to exhaust, should immediately stop spray water.11. when the stock line close to the Tuyere level (15m), the last tapping opening angle of 13 , replace the big drill bit 70mm, let the tapping process go as far as possible to ensure iron slag is fully out.12. When iron slag is fully out, immediately stops BF Top spray water, nitrogen, and operates according to long term blow off.13. After blow off remove all tuyere pipeline inform coordinator(production department) and stop blower, cast house cleaning slag, when BF turn cold, Raking out in progress.14. After Tuyere fully removed notification water pump stopped 1 water pump, blast furnace body body, belly, belly, big sets, water 1/2, hearth, stove water normal. After 16 hours of blast furnace cooling water of air discharge line closed, after 24 hours of hearth and bottom water pressure to a minimum.15. During the shutdown process Main Control room must record and keep details every half hour of blast furnace parameters. Following by safety rules and technical practice for implementation.8. BF shutdown Safety considerationsShutdown BF is a serious job, for ensure safety, and put an end to personal equipment accident, safety education must be educated to participation during shutdown of, seriously implement security first, prevention of approach, all participate in shutdown process, personnel to comply with discipline, wear personal protection equipment, strictly implementation about safety procedures and shutdown proposal to make sure the shutdown going smoothly.Work task, do following safety work:1. The strengthening of rule of the safety and security, to prevent accidents from happening, assigned guard to the main channel 1# blast furnace, on authorizes person access only 2. All staff participating in the shutdown operations sticks to their jobs, to authority, and obey the command and strict implementation of the rules and regulations, an absolute ban on illegal operations, and other types of
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年安全员考试重点复习资料包及答案
- 课件中大括号的使用
- 2025年摄影测量员技能鉴定模拟题及解析
- 2025年管理咨询师职业资格考试试题及答案解析
- 小学生简笔画教学课件
- 2025年自动化控制工程师高级面试题
- 课件上传解析失败的原因
- 2025年美容整形咨询师初级培训课程与模拟题
- 课件、看书、诗歌、文案简短
- 2025年安全创新知识竞赛题及答案
- 招生代理授权合同范本
- 2025年广西玉林产业投资集团有限公司社会招聘5人笔试备考题库及答案解析
- 定额〔2025〕2号文-关于发布2020版电网技术改造及检修工程概预算定额2024年下半年价格
- 少先队辅导员工作记录表(共7页)
- 公开课教学评价表
- 消防验收规范标准(最新完整版)19844
- 教研工作手册
- 独树一帜的中国画(课堂PPT)
- 制钵机的设计(机械CAD图纸)
- 生产设备控制程序
- LCM不良命名规范
评论
0/150
提交评论