已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
3584加一路扩展柜简易操作手册For 1 expansion frame MES:1, Power off base frame, Level base frame.2, Remove expansion frame right door, if exist.3, Remove base frame right door4, Remove base frame X-axis end stop5, Expansion frame, install upper X-axis guide rail, do not connect with base frame6, Expansion frame, install lower X-rail, not connect with base frame7, Loose expansion frame locknuts8, Place frame skate under the 2 leveling pads on the left side of expansion frame9, Raise left side of expansion frame, move toward base frame, alignment rod should be aligned with the hole in base frame10, Push alignment rod into hole11, Insert M8 bolt between base frame and expansion frame, should not be tight.12, Remove frame skates from left13, Use E-shaped tool to ensure the frames are correctly aligned one another14, If step 13 is ok, re-tighten 2 M8 bolts, just finger-tight.15, Place level of lower expansion frame X-rail, Raise expansion frame right side until X-rail is level.16, Align upper X-rails17, Put down left leveling pads, and tight manually, not too tight18, Install long T-nut19, Move expansion frame X-rail to base frame 20, Check alignment rod fully seated in base frame.21, Tight 2 M8 bolts22, Use alignment tool on the X-rails23, Hammer the alignment tool24, Tighten X-rail T-nuts25, Tighten the long T-nut26, Tighten upper X-rails27, Use clamp tool from left to right. Press rod in place28, Install X-rail right side end stop.29, Install frame spacers on base frame and expansion frame.30, Install frame-to-frame attachment brackets.31, If you just install 1 expansion frame, no need to change X-axis track cable. If not, install the cable32, In expansion frame, install X-axis cable cover33, Test X-axis cable movement34, Tighten all leveling pads35, Install right door36, Connect power cables J5 on expansion frame to J7 of Base frame. J5 to J5, J7 to J737, Connect interface signal cable from J6 of expansion to J8 of base frame38, Connect inter-frame EPO cable connectors P23 on Base frame39, Ensure Jumper of EPO cable is installed on last expansion frame 40, Remove J15 terminator of PIC cards on expansion frame41, Remove J16 terminator of PIC cards on base frame42, Check all J15,J16 terminator are fully installed. 43,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- HIE护理中的体温管理与环境调控
- Unit 4 Digital life 单元话题(数字生活)写作满分范文15篇(解析版)-2025-2026学年八年级英语上册(外研版)
- 内二科患者输液治疗中的留置针全程管理
- 山西财经大学《中国古代文学Ⅳ》2024-2025学年第一学期期末试卷
- 陕西理工大学《安全检测技术》2024-2025学年第一学期期末试卷
- 大疱性类天疱疮合并瘙痒个案护理
- 四川省成都龙泉第二中学2025-2026学年高一化学第一学期期中监测模拟试题含解析
- 浙江省磐安县二中2026届化学高一上期中质量跟踪监视试题含解析
- 上海市宝山区建峰附属高中2026届化学高一上期中联考模拟试题含解析
- 鞘膜脓肿护理
- 佳木斯大学招聘考试真题2024
- 老年医学进修汇报
- 税务风险培训课件
- 2025年广东选调考试真题
- 红酒酒会活动方案
- 国企人力笔试题目及答案
- 矿山恢复治理方案
- 中国南水北调集团东线有限公司招聘笔试题库2025
- 2025科级领导干部理论考试试题及答案
- GB/T 46278-2025个体工商户信用评价指标
- 光伏发电系统运维细则
评论
0/150
提交评论