陈泓宇价G周报告2013-06-07.doc_第1页
陈泓宇价G周报告2013-06-07.doc_第2页
陈泓宇价G周报告2013-06-07.doc_第3页
陈泓宇价G周报告2013-06-07.doc_第4页
陈泓宇价G周报告2013-06-07.doc_第5页
已阅读5页,还剩4页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

WILIBOX and Huizhou (factory) WIFI teamweekly activities overiewWeek 23, 2013 (May 31 June 07)Table of ContentsRunning product changes overview2Project overview2JetPalm series - low cost Atheros based CPE3APC Sputnik 5 extremely long range AP/CPE with offset dish4LigoPTP 5-30 30dBi dish antenna with integrated radio for wireless bridge (PTP) applications5Atheros based PCBA548Vin PoE 802.3af injector612-24Vin PoE 802.3af injector (outsourced product)6Software team activities overview7WILIBOX and Huizhou (factory) WIFI team weekly activities overiewRunning product changes overviewBrandChangeAssigneeStatus updateDeliberant2M-14/5M-12/5M-18/5M-90 antenna change (#2391 and (#1967)YaXiongWaiting to for 2GHz sector antenna FPR results. All other antenna ECR finished. Deliberant/LigowaveNew PTP enclosure packing (#1079)BensonSamples sent to US for reviewing. Waiting for Intelbras approval.Deliberant/LigowaveNew QIG for product with PTP enclosureBiruteNew version done. Only APC Mach 5 QIG need small changes. Starting ECR.LigowaveNew Product label design for PTP PRO and PTP UNITY (#2325, #2586)Henry XuFinal artwork done. Waiting for Henry Xu to review. Next step ECR.LigowaveNew surge PCBA design for PTP PRO and PTP UNITY (#2631)YaXiongPCBA SMT done. Waiting for surge test results.Project overviewBrandModelPhaseProject codeStatus updateNo brandJetPalm 2M (Dirol 2)EPR9G30110On holdNo brandJetPalm 5M (Dirol 5)FPR9G30210PCBA FPR done, analysis in progress. Enclosure T2 samples done. Need minor changed. Preparing samples for FCC/CE testing.DeliberantAPC SputnikFPRWG22410PCBA FPR finished. Enclosure mold testing/fixing in progress.DeliberantAPC Electrobug (Managed PoE Switch)Prototype-Prototype PCBA received. Software development in progress.DeliberantAPC 2M-9LFPRWG21910FCC/IC draft report received. CE in progress.Ligowave LigoPTP 5-30Prototype-Ordering dish part for testing. Transmitter part design in progress.Ligowave48Vin PoE 802.3af injectorPrototype-Prototype finished. Further product development on hold.Ligowave12-24Vin PoE 802.3af injector-OutsourcedProject finished. Waiting for updated quotation and samples.JetPalm series - low cost Atheros based CPERedmineAssigneeStatusNotesPCBA (Dirol enclosure)FWBD-26002.4GHz MIMO AR9341 low power-GediminasEPR1 testing on hold.FWBD-25005GHz MIMO AR9342 middle power#2606#2568YaXiongFPR testing in progress10 samples receive in LT. Testing in progress. Due to minor layout changes, RF components must be adjusted.EnclosureFWMA-81#2045BensonMold Open in progressT2 samples done. Need to fix minor defects.AntennaFWA 23 , 2GHzREADYAntenna design is ready (FWA-23). We will use same antenna as for FWBD-1900.FWA 31 , 5GHz#2382HermesREADYPoEPoE 24V#2488YaXiongREADYGRT-240050 24V/0,5A with label as in #2488PackingGift Box#2478BensonREADYProduct label#2624Jerry READYCertificationFCC/IC/CE#2446#2733WinPreparing samples for testing.Calibration softwareCalibration software for FWBD-2500#2753Vaidas S.READYProduction softwarePauliusIn progress.Estimated final date June 21st APC Sputnik 5 extremely long range AP/CPE with offset dishRedmineAssigneeStatusNotesPCBAFWBD-2400#2562YaXiongREADYHeatsink for PCBA#2503BensonREADYEnclosureDevice enclosure#2407Henry XuWaiting for waterproof testing Plastic wall/pole mounting #2406Henry XuREADY3D drawing changed, increasing holder diameter to 40mm on mold. Samples expected on 05/27.Offset dish mount#2486Henry XuOpening press & punch molds.Samples expecting before end of JuneAntennaIntegrated antenna CLP gerbers-Vaidas S.READYLatest version in Production DBIntegrated antenna foam part#2030Henry XuREADYOffset dish #2420Henry TaoREADYSamples reached Huizhou factory.PoEPoE 24VYaXiongREADYGRT-240050 24V/0,5A.PackingGift Box#2479EvaldasDesign done. Artwork design in progressDevice label#1433EvaldasUpdating designSmall changes done. Waiting for approval.QIG#2780BiruteIn progress.Preparing QIGCertificationFCC/IC/CE#2561WinIn progress.FCC draft report received.AU/ZE#2737WinPreparing for certification. Searching information about cost and quotation of Australia/New Zealand certification. Calibration softwareFWBD-2400 calibration software#2299MantasREADYLatest version in Production DBProduction softwareProduction scripts for factory#2628Paulius R.READYProduct file uploaded to Production DB.OtherAntenna assembly issues#2548YaXiongIssue has been resolved Added arrow mark on foam part, to prevent assembly mistakes.Sputnik samples for CommunicAsia#2627BensonREADYPreparing two set of samples for exhibition in SingaporeTotal product FPR#2698BensonIn progress.FPR T1 samples expecting on 6/24.LigoPTP 5-30 30dBi dish antenna with integrated radio for wireless bridge (PTP) applicationsRedmineAssigneeStatusNotesEnclosureDish vendor search#2476EvaldasOrdering samplesDish samples for exhibition#2645BensonREADYSamples where sent to exhibition.Transmitter part design#2809Henry XuDesign in progressPCBAFWBD-1401YaXiongREADYAntennaFWA-33Vaidas S.Prototype testingTransmitter and dish part needed to finish testing.PoEGigabit 802.3af 48V PoEYaXiongREADYGreat VX-PI1000GB 48V Gigabit 802.3af PoEPackingPendingCertificationPendingCalibration softwarePendingProduction softwarePendingAtheros based PCBA for ODMRedmineAssigneeStatusNotesPCBA (2M-8/5M-12 enclosure)FWBD-19052.4GHz SISO AR9331 low power#2761YaXiongEPR1 in progressComponents from vendor sending to factory.FWBD-19062.4GHz SISO AR9331 high power#2762YaXiongEPR1 in progressComponents from vendor sending to factory. PCBA SMT could be done about 06/17.FWBD-1907#2764Henry TaoKey PCBA component purchase FWBD-11025GHz MIMO AR9342 middle power#2760YaXiongEPR1 in progressSMT be done before June 24.48Vin PoE 802.3af injectorRedmineAssigneeStatusNotesPCBAPrototype design#2633AidasPrototype designPrototype done. Further design on hold.EnclosurePendingPackingPendingCertificationPending12-24Vin PoE 802.3af injector (outsourced accessory)RedmineAssigneeStatusNotesEnclosureAdd ground connector and label#2329CarlaREADYPackingPacking and label#2425CarlaVibration/drop testingPurchasing GB samples for drop-vibration tests. CertificationFCC/CE test reports#2055WinTesting in progressReports should be ready before 6/17.OtherPoE cost, MOQ, L/T#2328CarlaREADYMOQ and final cost information received.Injector specification#2329CarlaREADYSpecification done. Samples for PoE approval-Samples sent to LTWaiting for samples receive in LT and US. Software team activities overviewDirol CPE 7.0: In progress: #2801, Reset button handling via GPIO#2800, Add JFFS2 / data aka persistent , 0.5MB max#2774, ELTOP brand GUI#2742, Wrong default configuration in Router mode#2707, Cant login after using old gui with flex The CGI was not CGI/1.1 compliant. #2669, User agreement: strange issue with selection#2557, Operational Country: support in GUI Needs further testing/verification: #2791, utilbox: add utility for ART partition (eeprom) dump#2730, Add checking when Saves changes task is completed#2705, Status displays security type incorrect#2665, SNMP support#2655, FW checking in WS and GUI#2654, FW checking in fwupdate#2653, Add FW checking before writing to flash#2641, incorrect file validation on Restore system config file#2639, Licence invalid - no config file#2637, SNMP: support in GUI#2556, Operational Country: support in luaconf#2550, Refactor collector.lua and toolbox#2430, u-boot: LED junginjimas#2786, iwscan2json do not show wep type Completed: #2806, Naktinis buildas neveikia: smth does not work#2805, FW upgrade: upload FW: upload dialog will disappear if you click on background#2751, Unify role names: from Capital letter#2749, Site Surve: remove focus from the Filter entryfield#2748, Pasimete indenai ant factoryd#2744, GUI: We should change Support symbol#2741, Rename labels#2740, Remove DNS server fields when Dynamic IP selected#2690, Implement Search SSID #2687, FW upgrade: missing info on upgrade process#2680, Implement Settings-System-Device settings in GUI#2569, Implement Run time GUI language change#2457, Product name change in production#2804, kernel: disable 14MB RAM pool reservation on boot.#2747, Max 802.11n data rate entry-field by default is empty#2739, Mockup: Remove DNS servers from DHCP IP fallback#2738, On system_stop are printing WARNING: at kernel/softirq.c:143 local_bh_enable+0x50/0xc8()#2724, unit gets IP from DHCP server only after reboot#2715, cannot change channel width#2696, Open Uboot console only after pressing ESC#2658, flash image utilities in utilbox#2592, factoryd support#2590, wxee support#2558, wpa_supplicant doesnt work in bridge#2471, CPE: Radio security: WPA/WPA2/TKIP/AES - maybe we need to remove this selection and leave just Auto WPA/WPA2?#2429, u-boot: clean up boot loader messages#2301, Enable system_stop/system_start#2232, IE doesnt display a placeholders in Username entryfield on Login page PQA/Calibration tools a

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论