




已阅读5页,还剩9页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
5660MW Unit of India APL Power PlantSHANDONG TIEJUN Electric Power engineering CO.LTDMundra ProjectNo.I&C DCS system power power supplyTotal 12 Pagesconstruction instruction Compile Auditing Approve ModificationAmenderAuditing/Approve12341. Documents1.1 The quality criterion of acceptance and assessing of electric power construction(I&C, 1998 edition)1.2The specification of erection and acceptance of electric power construction(Part4:I&C Instrumentation and control devicesDL/T5210.4-2009)1.3 Code of safety operation in power engineering construction(Part 1:Steam power plants DL.5009.1-2002)1.4 Northwest electric power design institutes drawings1.5 ISO14001 environment management system1.6 ISO9001 quality management system1.7 ISO10012 measure management system1.8 OHSMS 18000 occupation safety and health management system1.9 India Mundra independent power plant construction scheme2. SummarizeThe scope of DCS system power acceptance of India Mundra Power Plant 2660MW+3660MW Project include DCS power panel, DCS network panel, DCS control panel, DCS extension panel, engineer station, operator station, etc. equipment. This measure is used of DCS equipment power giving; preparing for the recover of DCS hardware & software and next step: adjusting; make sure the safety of body and equipment in the process of power giving. 3. Project QuantityThe sequence of DCS power acceptance: a. Electrical UPS supply the power to I&C DCS power distributed panel; b. DCS power distributed panel supply power to operator station, duty captain station, control room control platform etc. DCS control panel and DCS system panel; it send power to the whole DCS system. The segment from electric 240VAC to DCS power panel power giving should be after factory power reversal. It has no quantity of installation.4. Erection ConditionMain equipment delivery conditionAll the equipments affect DCS system power acceptance have been delivery to site on time. RemarkPreparative erection conditionGround, power: 1. DCS room achieve the condition of DCS system power acceptance. 2. Adjust personnel in their place. Environment: DCS room is clean, light and fire fighting are enough. OthersOther worker requirement: dont enter DCS room without permission.DateAccording the milestone plan of the project and the adjusting plan carry out the DCS power acceptance step by step; The plan date of No.5 unit DCS power acceptance is 15/03/2010.Manpower1 principal, 2 adjusting personnel, 2 construction personnel.MachinesnoneTools2 multimeter, 4 electric test pen, 2 electric iron, personal wiring tool 2 set. Materialsoldering tin, insulating tape, wire, caution sign etc.5. Erection Scheme5.1 construction working procedure flow chart:Electric UPS - DCS power distributed panel - DCS and control platform (detail is below).I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE18 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE19 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE20 POWER SUPPLYI&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE21 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE22 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE23 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE24 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE25 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE26 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE27 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE28 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE29 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE30 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE31 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE32 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE61 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS CABINET 5CWE62 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS PRINTER 5CWG01 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS PRINTER 5CWG02 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS PRINTER 5CWG03 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS PRINTER 5CWG04 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS PRINTER 5CWG05 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS PRINTER 5CWG06 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 PRECEDING POWER CABINET OF BOILER 5CWH23 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 PRECEDING POWER CABINET OF BOILER 5CWH24 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 PRECEDING POWER CABINET OF TURBINE 5CWH25 POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE01POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE02POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE03POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE04POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE05POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE06POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE07POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE08POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE09POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE10POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE11POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE12POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE13POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE14POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE15POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE16POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWE17POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS CABINET 5CWJ01POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 BOILER MFT CABINET 5CWE33POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS EWS 5CWD01POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS EWS 5CWD02POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS OPS 5CWC01/02POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 DCS OPS 5CWC03/04POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 BOP OPS CCWC11POWER SUPPLY.I&C DCS POWER CABINET 5CWH02 CCTV/SWITCHYARD OPS CCWC12 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 #1 DCS COMMON CABINET CCWE01 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 #2 DCS COMMON CABINET CCWE02 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 #3 DCS COMMON CABINET CCWE03 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 #4 DCS COMMON CABINET CCWE04 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 #5 DCS COMMON CABINET CCWE05 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 NETWORK CABINET CCWJ01 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 SHIFTOT STATION CCWB01 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 SHIFTOT STATION CCWB02 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 SHIFTOT STATION CCWB03 POWER SUPPLY.I&C DCS COMMON POWER CABINETCCWH01 SHIFTOT STATION CCWB04 POWER SUPPLY.I&C DCS POWER CABINET 5CWH01 DCS COMMON POWERCABINET CCWH01POWER SUPPLY.The segment from electric 240VAC safety part to DCS power panel power giving should be after factory power reversal; the flow is same. 5.2 Working Procedure CardDCS system power acceptance and power giving No. 01 1. Summarize: the preparation of power acceptance mostly include: the condition before power acceptance; the check after power acceptance; cabinet power giving and acceptance. 2. Operation process:Sequence / ProcessMethod and Operation RequirementQuality Requirement2.1 The condition of power acceptance and power giving2.1.1 The wire connection of DCS room and CCR system is finished; electric power reversal system cable shield is good; power supply and other wire connection is correct. 2.1.2 All the I&C panel and station etc. need to power giving wire connection is finished; earthing construction is finished; inside equipment assembled completely. 2.1.3 DCS system joint network is finished. 2.1.4 DCS principal station and operator station installation fill its shoes.2.1.5 DCS power panel to apiece user power circle and electric power reversal are finished. 2.1.6The cable from electric UPS to DCS power panel laying finished and wire connection acceptance is eligible.2.1.7 Light in DCS room and CCR is using; Clean and firefight equipment is using. 2.1.8 Checking the type, specification and capacitance of electric equipment in the panel for power acceptance accord design and the load in fact; recording the item fall short of requirement. 1. Wire connection correctly; marked clearly and intact.2. The type, specification and capacitance of electric equipment in the panel for power acceptance accord design and the load in fact. 3. Before the circuitry checking, cut off the power switch in sequence.4. Wire connection correctly; marked clearly and intact.2.2 Checking before working2.2.1 Before working, must study the technique instruction and safety instruction.2.2.2 Checking the environment of panel, platform and cabinet in DCS room and CCR. 2.2.3Checking the relational control circle and measure circle; ensure circle and signal circle insulating (the work should finished ahead of schedule); checking and switch off the entire switch and make the record. 2.2.4 Checking the electrification equipment and the equipment without power circle and connection.2.2.5 Checking the signal of communication tools. 2.2.6 All the examination is ok, then contacted power giving. 1. Study instruction carefully and completely; Be familiar with the whole process and signature.2. Ground is cleaned; light is using; aeration is good; firefight equipment is all ready. 3. Panel, platform and cabinet are clear; indicator and protective socket are good; equipment No. are clear; mark are in evidence.4. All the electric circle is correct; insulation accord with design.5. Adopt isolated measure.2.3 The distributed panel power acceptance from electric UPS to DCS panel2.3.1 When power acceptance, electric segment and DCS panel every side need 2 person; one operator and one ward person; keep in touch with each other; before electric UPS operate, inform DCS person. 2.3.2 Checking electric UPS voltage is 240VAC or not; the voltage is steady or not. 2.3.3 Switch on the UPS power panel switch; measure the voltage with multimeter; observing the equipments is normal or not.2.3.4 Measure the input voltage of DCS distributed panel; Is it240VAC? IS the switch normal? 2.3.5 When electric power reversal is finished, measure the input voltage of DCS distributed panel; Is it240VAC? IS the switch normal?2.3.6 The power switch must be operated by electrical personnel; dont let other personnel operate. 2.3.7 Make the card: ”power on, NO OPERATION” after switch on the power switch.1. Power switch capacitance accord with design. 2. Make sure 240VAC voltage steadily.3. The equipment for power acceptance is normal.2.4 power giving from I&C DCS power panel to operator station 2.4.1 This segment must be operate by DCS factory personnel and I&C personnel. 2.4.2 Checking the DCS distributed panel is normal or not; Turn on the main switch; Observe the switches; are they normal. 2.4.3 Check the switch cabinet of operator station; turn on the power switch. 2.4.4 Check the operator station power, joint network connection; turn on the switches of host computer and display; start the computers.2.4.5 Observing the host computer and display in operator station is normal or not. 1. Power switch capacitance accord with design. 2. Make sure 240VAC voltage steadily.2. The equipment for power acceptance is normal.2.5 power supply from DCS power panel to DCS control panel GPS 2.5.1 Checking DCS power panel power switch equipment input voltage is normal or not; DCS control panel and GPS connection is normal or not. 2.5.2 Turning on the power switch; checking DCS control panel and GPS input voltage. 1. Checking and affirming the voltage 240VAC is steady.2. The equipment for power acceptance is normal.2.6 Acceptance2.6.1 Power cable wire connection correct rate is 100%; power switch capacitance accord with design. 2.6.2 Test record clearly, data correctly and completely. 1. The insulation of electrical source loop1M. 2. Signal cable shield earthing is good.6.QA check planCheck item descriptioncheckerresultdate/signatureEAOCable wiring is correct or not; cable nameplate is correct or not.Insulating resistance accord with requirementCapacitance of switch accord with design Cable wiring fastnessFireproofing and cover & block accord with design The voltage accord with standard E: Section engineer; A: Chair engineer; O: Employer7. Safety and civilization erection and environment management7.1 Safety measures7.1.1 All the personnel for power giving must obey command, club together; dont leave or operate at will. 7.1.2 All the personnel for power acceptance and power giving should be familiar with equipment and measure; preparation well for the work. The personnel are familiar with operation, measure, checking method and work step.7.1.3 In the process of power acceptance and power giving, enhance the equipment patrol, avoid contingency. 7.1.4 Check the location for power acceptance; disallow the personnel not relate to work entry the site.7.1.5 Hang the caution card when the equipment is power on; Setting up necessary safety barrier.7.1.6 When the working personnel finish operating, measuring and custody, report in time; if you found abnormity, report it at once. 7.1.7 Dont use the intercom at will in order to ensure the communication is good.7.1.8 Dont operator or measure at side only yourself. 7.1.9 The equipment for firefighting is enough at site. 7.1.10 Command correctly; operation carefully; measure rapidly and safety. 7.2 Environment safeguard7
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025服装店员工劳动合同协议书
- 2025贷款担保抵押合同
- 农村代理记账合同范本
- 怎么写赠与合同范本
- 承包绿化劳务合同范本
- 从+“心”+出发遇见更好的自己-开学第一课暨心理健康教育主题班会-2025-2026学年高中主题班会
- 合作沙场合同范本
- 托管机构合伙合同范本
- 施工经理聘用合同范本
- 债务划清责任合同范本
- 枣庄学院《图学基础与计算机绘图》2024-2025学年第一学期期末试卷
- GB 46031-2025可燃粉尘工艺系统防爆技术规范
- 养老护理员培训班课件
- 2025-2030城市矿产开发利用政策支持与商业模式创新报告
- 产品线库存管理与补货预测系统
- 2025年高考(山东卷)历史真题及答案
- 医学减重管理体系
- 初中历史教师培训讲座
- 2025年新营运损失费赔偿协议书
- 手术部运用PDCA循环提高手术室术后设备器材定位归还率品管圈
- 传统丧事流程安排方案
评论
0/150
提交评论