市政设施专项整修工程旅游路施工交通疏导方案.doc_第1页
市政设施专项整修工程旅游路施工交通疏导方案.doc_第2页
市政设施专项整修工程旅游路施工交通疏导方案.doc_第3页
市政设施专项整修工程旅游路施工交通疏导方案.doc_第4页
市政设施专项整修工程旅游路施工交通疏导方案.doc_第5页
已阅读5页,还剩51页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through compliance reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 points) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 million Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performance (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (since January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the development and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.52 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig industry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emergence of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Western bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements. Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, about 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .济南市历下区市政工程管理局2015年历下区市政设施专项整修工程旅游路施工 交通疏导方案秦皇岛市政建设集团有限公司2015年 7月21日4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .目录一、现场交通状况及施工对现状交通影响分析1二、济南市旅游路管道工程交通组织方案4(一)、社会环境及工程概况4(二)、施工组织方案及交通组织方案8(三)、交通标志牌设置、协警人员位置及分流方案14(四)、施工安全及文明施工措施18(五)、交通管理应急预案19三、济南市旅游路热再生工程交通疏导方案21(一)、热再生施工工艺21(三)、交通疏导部署及准备26(四)、交通疏导方案26(五)、交通管理应急预案43(六)、施工安全及文明保证措施45 秦皇岛市政建设集团有限公司 济南市历下区旅游路道路修复工程施工交通疏导方案一、现场交通状况及施工对现状交通影响分析1、工程概况旅游路是济南市市区向东延伸的一条重要通道,西起市区舜耕路,东至309国道杨家河立交桥,全长28.4公里,路面宽度25米,双向六车道,两侧为宽2.5米的慢行一体化道路,途经市中区、历下区、高新区和历城区,涉及五个办事处、三个镇,是经十路的一条“姊妹路”。 2、管道工程施工范围管道工程整修方案为:新建热力管线、燃气管线、给水管线。其施工范围为东起福地街,西至荆山东路。路段全长2500米,道路红线封闭宽度约2 米。 管线工程施工路段平面位置图 3、热再生工程施工范围就地热再生维修方式是对路面轻微龟裂、车辙路段进行处理。其施工范围为旅游路与千佛山南路交叉口路中到转山隧道西口,路段全长7095.3米,其中开元隧道长1491米,隧道路段不在本次热再生施工范围内,21米宽路段为578米,20米宽路段为5026.3米。 热再生工程施工路段平面位置图 4、编制依据(1)道路交通标志和标线(GB5768-2009)(2)公路交通标志和示线设置规范(JTG D82-2009)(3)公路沥青路面施工技术规范(JTG F40-2004)(4)公路交通安全设施施工技术规范(JTG F71-2006)5、编制原则(1)运用科学的管理原则,杜绝在本工地内发生的任何交通事故,交通堵塞降到最低点。交通导改方案本着不断交的基础上,确保交通安全和施工安全,最大限度的减少施工与交通的相互干扰的疏导原则。(2)强化综合协调和管理,充分利用人力资源、机械设备、保质保量,缩短工期,尽快开放交通是本组织方案的思想考虑。(3)高质量的安全管理,积极采取有针对性措施,保证施工安全,实现文明施工。(4)施工中,根据施工线路平面位置,结合施工线路两侧沿线单位、店铺、居民区和相交道路的实际情况,合理安排施工工序、划分施工区段,分时段组织交通导流的方法组织施工。二、济南市旅游路管道工程交通组织方案(一)、 社会环境及工程概况 近年来,随着旅游路周边小区的快速发展,集中供热、供水、供气诉求呈逐年上升趋势。为此,热力、供水、燃气三家单位单位加大管网建设力度,努力满足新城区居民需求。将实施的旅游路管道工程,可为旅游路周围片区提供热源、水源和气源,为实现济南市绿色环保、节能减排目标、提高空气质量起到积极促进作用。管道工程施工方案为:新建热力管线、燃气管线、给水管线。其施工范围为东起福地街给水加压站,西至荆山东路与旅游路路口。施工路段全长2500米。热力管线施工路段为荆山东路与旅游路路口、洄龙山路与旅游路路口和转山西路与旅游路路口,南北向横穿旅游路。燃气管线施工范围为转山西路西侧辅道至福地街。给水管线施工分为两部分,第一部分施工范围为东起福地街给水加压站西至旅游路中井洪沟东侧,管线位置在旅游路北侧东向西最北侧快车道,第二部分为浆水泉路与旅游路路口、洄龙山路与旅游路路口,南北向横穿旅游路。工程内容包括沟槽开挖、垫层处理、管道焊接安装、沟槽回填、道路恢复,检查井砌筑等。工期:30天5 秦皇岛市政建设集团有限公司 济南市历下区旅游路道路修复工程施工交通疏导方案北燃气管线施工示意图北热力管线横穿施工示意图北给水管线施工示意图 秦皇岛市政建设集团有限公司 济南市历下区旅游路道路修复工程施工交通疏导方案 旅游路断面图 转山西路中井洪沟段南北旅游路(转山西路-中井洪沟)宽度25米人行道人行道3.25米3.25米3.25米3.25米3.25米3.25米 (二)、施工组织方案及交通组织方案1、工程内容包括沟槽开挖、垫层处理、管道焊接安装、沟槽回填、道路恢复,检查井砌筑等。2、旅游路为济南市东部东西向主干道,早高峰期为早七点至九点,车流方向为西向东方向,晚高峰期为晚十七点至十九点,车流方向主要为东向西方向。施工路段主要相交路口有转山西路、洪山路、洄龙山路、浆水泉路、荆山东路。工程范围内有131路、K139路、151路、K161路等公交线路,给水管线施工封闭道路中心线北侧第一条快车道转山西路至中井洪沟共630米,公交车行驶至该路段后延道路中心线北侧第二条快车道继续向西行驶至中井洪沟后恢复正常行驶线路。机动车道:半封闭施工,保证道路双向通行能力。封闭方案如下:(1)、旅游路(转山西路中井洪沟段): 封闭道路北侧第一条快车道,封闭范围东起转山西路与旅游路交叉口西侧至中井洪沟东侧,封闭宽度由道路北侧路沿石向南延伸2米,第二、第三条快车道和西向东三条快车道正常通行。路口两侧各预留50米(视交通流量随时变更)铺设钢板,作为导向车道。半 封 闭 施 工北人行道人行道南北旅游路(转山西路-中井洪沟)宽度25米人行道人行道沟槽宽度1.1米,封闭施工区2.15米3.25米3.25米3.25米3.25米3.25米1.1米旅游路施工封闭断面图根据旅游路早晚高峰的特点,在16时至19时将安排人员使用移动隔离椎导行,占用转山西路至中井洪沟段道路中心线南侧一排车道,将东向西方向变为三车道,增加通行能力,同时安排协勤人员指挥交通。半 封 闭 施 工北人行道人行道2、横穿路口,采取夜间分段施工,白天铺设钢板,保证车辆正常通行,施工时间为夜间22:00至次日5:00,其他时间用装满石粉的配重袋回填沟槽,并用钢板覆盖。施工时间包含施工准备和钢板铺设。以洪山路与旅游路路口横穿为例53第一阶段:封闭旅游路北侧两条快车道,因夜间施工,不影响公交车通行如下图所示:绿化隔离带绿化隔离带旅游路旅游路洪 山 路第一阶段慢行一体慢行一体慢行一体慢行一体慢行一体慢行一体北绿化隔离带绿化隔离带封 闭 施 工封 闭 施 工第二阶段:封闭旅游路道路中心线北侧一条快车道和南侧一条快车道,如下图所示:绿化隔离带绿化隔离带旅游路旅游路洪 山 路第二阶段慢行一体慢行一体慢行一体慢行一体慢行一体慢行一体北绿化隔离带绿化隔离带封 闭 施 工封 闭 施 工第三阶段:封闭旅游路南侧两条快车道及慢行一体,如下图所示:绿化隔离带绿化隔离带旅游路旅游路洪 山 路第三阶段慢行一体慢行一体慢行一体慢行一体慢行一体慢行一体北绿化隔离带绿化隔离带封 闭 施 工封 闭 施 工3、路口施工组织方案及交通组织方案工程内容包括沟槽开挖、垫层处理、管道焊接安装、沟槽回填、道路恢复,检查井砌筑等。交通保障方案如下:1、路口施工时间为夜间22:00至次日5:00,其他时间用装满石粉的配重袋回填沟槽,并用钢板(厚300mm,2.5m*5m)覆盖,钢板上表面与路面平行。施工时间包含施工准备和钢板铺设。 2、施工期间,沟槽施工范围四面围挡,围挡上设反光警示带,四角及每五米设落地标示牌、闪烁警示灯;沟槽东侧设置警示车辆。施工范围内照明充足醒目、机具放置整齐有序。沟槽东西端各设灭火器一个。 3、通行期间,施工范围内围挡、机具全部清理,只保留钢板。并安排两名协勤人员,负责疏导交通,检查看护钢板防止出现缝隙。 4、项目部人员和各施工负责人保持通讯畅通,确保能够及时协调处理突发情况。 5、路口转向车道范围内的钢板正面斜向焊接12#螺纹钢筋,以防滑。(三)、交通标志牌设置、协警人员位置及分流方案1、交通分流方案及协警人员示意图因为旅游路二环东路以东路段是济南最南边的一条东西向主干道,除经十路外无其他可绕行主干道,只有部分次干道及小区内市政道路可供绕行。如下图所示。2、交通标志牌设置及示意图在洪山路与云驰路路口西、北侧、转山西路与云驰路路口西、北侧、旅游路与转山西路路口北侧、洪山路与旅游路路口南、北侧、旅游路与福地街路口南、北侧安装施工绕行标志牌,内容为:“旅游路管道施工,过往车辆注意绕行”。如下图所示:交通分流方案及协勤人员、绕行标志位置图图 例协勤人员位置绕行标志位置旅游路 管线 施 工 1、道路施工指示牌: (悬挂)1.5米1米2、落地标示牌:前 方 道 路 管 线 施 工车 辆 减 速 慢 行 2米1.5米(四)、施工安全及文明施工措施1、路口安排交通协勤人员,交通疏导人员应穿戴专用反光衣帽,交通高峰期视交通情况增加协勤人员。2个路口,每班2人两班倒,共4人。2、施工现场周边采用围挡(1.8*2m)进行封闭式围护,并设置交通导行图、前方施工减速慢行等交通标志牌,同时设置减速带、交通隔离柱等进行导行,确保现场的施工和交通安全交通标志牌、车辆导行灯3、夜间施工按规定设置夜间交通的安全措施,隔离设施张贴反光条,保证夜间施工安全。4、在各路口及单位门口,铺设钢板形成临时便道并加装护栏,并安排协勤人员指挥交通,确保出行人员的人身安全。5、为能更好的得到群众的谅解与支持,在道路封闭施工前以发告知信、悬挂横幅等方式告知当地居民与沿线单位,减少施工造成的不便。6、为保持施工现场整洁、美观,每天冲洗围挡两次,早5:006:00一次;中午13:0014:00一次。7、为不影响车辆行人正常通行,在交通高峰期时段采取暂时停工措施。8、加强与各部门的沟通,并积极配合做好交通管理工作及环境保护工作。9、建立与交警部门联系的直通道,及时反馈现场交通状况。在交通高峰期必要时请交警到现场协助指挥。当严重塞车时请交警到现场指挥并按应急方案进行分流。10、根据工程分段施工及现场的布置情况,施工场地合理安排进出车道,做到各行其道。工程车严格按照指示和交通指挥员指挥行驶,礼让其他车辆,通道上禁止白天占道装卸施工材料。11、交通疏导小组每天必须对管理范围内的路段进行巡查,发现有阻碍交通的障碍物或道路损坏,及时处理。12、施工范围内车行道和人行道按规定设置夜间警示灯,确保车辆、行人道通行安全。13、施工完毕后及时清理干净现场,将剩余的材料,施工机械及时运出道路外,现场清扫干净,以利车辆的顺利通过。(五)、交通管理应急预案为加强恶劣天气和突发情况的道路交通安全管理,保障施工范围内道路交通安全畅通,最大限度的减少和遏制道路交通事故的发生,最大限度保障沿线人民出行平安,减少国家、集体和人民的生命财产损失,为人民群众营造良好的道路交通环境,根据中华人民共和国安全生产法、中华人民共和国道路交通安全法等有关法律法规规定,结合工程现场实际,制定本预案:1、适用范围(1)雾天能见度小于50米。(2)冰、雪、暴雨、大风等恶劣天气影响道路行车安全。(3)其他突发情况。2、处理措施(1)及时掌握恶劣天气和突发情况道路交通信息,快速排险保畅。(2)快速处置、疏导交通。遇到雨、雾、雪、冰冻天气时,要合理安排人员快速道路面,科学组织交通管理,提醒过往驾驶人加速、慢行,落实疏导牌、指路牌、疏导分流标志牌等设施,做好引导工作,确保道路交通安全畅通。(3)做好值班备勤工作。值班人员坚守岗位,认真履行值班职责。3、应急保障应急物资包括抢通物资和救援物资两类。抢通物资主要包括沥青、碎石、砂石、水泥、钢桥、钢板、木材、编织袋等;救援物资包括方便食品、饮水、防护衣物及装备、医药、照明、帐篷、及常用维修工具、应急救援车辆等。同时需储备一定数量的机械,如挖掘机、装载机、平地机、汽车起重机、平板拖车、发电机等。三、济南市旅游路热再生工程交通疏导方案(一)、热再生施工工艺热再生工艺采包括三台加热机,一台加热铣刨机,一台加热复拌机,以及自卸车、摊铺机、两台压路机,一字排开进行施工。用三台加热机进行路面加热,加热到所需温度后,加热铣刨机进行路面铣刨,复拌机跟进对原路面进行复拌再生。后面紧跟摊铺机及压路机进行摊铺、碾压,等路面温度低于50后可开放交通。热再生工艺具有就地加热、铣刨、复拌、摊铺、整平功能,可一次成型新路面,旧路沥青混合料100%就地再生利用,具有节约资源、减少环境污染、作业时不封闭交通、经济和社会效益都非常显著等特点。 机组一字排开共150米长,铣刨宽度34米,行驶速度1015米每分钟,施工速度45米每分钟。 (二)、交通疏导组织机构及疏导设施数量1.本工程在施工期间成立社会交通疏导领导小组,领导小组将由项目经理任组长,技术负责人及施工员、安全员任副组长,确保交通疏导安全、顺利的进行。组长项目经理张彤186305660291人副组长技术负责人董焕增139303067001人施工员张哲150760266961人安全员张久斌139339553211人组员现场交通疏导人员16人组长:项目经理,总协调、总负责。副组长:技术负责人,负责交通组织方案的编制、报审,监督检查交通组织方案的执行;施工员,负责交通组织方案的落实,按方案摆放交通标志、搭设施工围挡、照明装置和警示装置,实施交通导改方案。安全员,负责日常交通安全事务检查、监督和管理。2.劳动力使用计划及设施数量表工种 人数备注疏导负责人2配合安全员进行日常工作检查专职协调员2及时汇总现场情况并向上级汇报疏导工12路口疏导交通导流设施数量表工程名称济南市历下区市政工程管理局2015年历下区市政设施专项整修工程旅游路施工交通疏导方案部位旅游路与千佛山南路交叉口路中到转山隧道西口 为配合工程施工,每个作业面具体交通导改工程量如下: 序号安全设施单位数量备注1前方施工300m块22左/右道封闭(立柱式)块23道路变窄块24道路施工块2530KM限速牌块16解除30KM限速牌块17左/右道封闭(支架式)块28线形诱导标块49安全彩旗面1010太阳能LED箭头灯套211太阳能警用爆闪灯套212太阳能旋转风扇灯套213路锥个50014反光背心个2015安全帽个2016指挥棒个517货车辆118清障车辆1 秦皇岛市政建设集团有限公司 济南市历下区旅游路道路修复工程施工交通疏导方案3.施工标志标牌样式、车辆导向灯及夜间施工警示落地标示牌:2米前 方 道 路 施 工车 辆 减 速 慢 行 工期:2015年 月 日至 月 日3米旅游路 道路 施 工 工期:2015年 月 日至 月 日道路施工指示牌: (悬挂)2米1米落地警示牌:前 方 路 口 施 工左 转 车 辆 请 绕 行1米2米(三)

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论