


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
ZPEB PROCEDURE FOR “HANGING OFF” BOTH THE TRAVELLING BLOCK AND VARCO TOP DRIVE SYSTEM IN THE DERRICK, THEN SLIPPING AND CUTTING THE DRILL LINE 1.SCOPEThis procedure is designed to enable the ZPEB Drilling Rig Manager to control and co-ordinate the task of slipping and cutting the drill line in a safe and proper manner with the required number of rig and wire line personnel. 2.OBJECTIVESTo have a procedure in place and to make sure all personnel involved are aware of their duties. This procedure will be discussed all personnel involved at a pre job safety meeting before the task / work starts. 3.APPLICATIONTo the following ZPEB rig areas; the drill line storage drum / derrick including the Varco Top Drive System / mast / drill floor area of the drilling rig with the cooperation of the Total Drilling Program, Total Company Man. 4.RESPONSIBILITIES AND DUTIESZPEB Rig Manager & Toolpusher will coordinate the preparation, moving and positioning of the necessary equipment to complete this task, with the full cooperation of the required numbers of ZPEB rig crew. The ZPEN Rig Manager on site, has full responsibility for all actions covering the following listed guideline instructions to slip and cut the drill line;1. Confirm with the Company Man the well is stable / safe and its safe to proceed with the task of rigging up the necessary equipment for drill line slip and cut operation2. All personnel involved must attend a pre job safety meeting to make sure everyone knows their duties and responsibilities. Good communications are essential by all parties involved in these drill line slip and cut operations 3. All parties on site to comply with Total Drillings relevant well design procedure and guideline information for drill line slip and cut operations. (Check and confirm all necessary wire ropes, slings, shackles, tools are prepared and ready for use for this task / operation and ANY tools required for the TDS location in the derrick can be safely tied off to prevent them falling below)4. With ONLY the required numbers of personnel in the rig floor area, proceed with the following guideline steps5. After getting PTW (permit to work) for the task (remembering it should cover the use of the man riding belt and tugger winch). Prepare to rig up slings and shackles to the crown block base and derrick area at the recommended point for “hanging off” the traveling block AND Varco (Tesco) TDS. Hoist the traveling block and TDS to the correct position then proceed to hang off BOTH units in the derrick on the 30 Ton sling suspended from the crown block baseAttention: due to the configuration on this rig ZPEB, BOTH the Traveling Block AND the VARCO (Tesc) TDS will be hung off together in the derrick6. After the traveling block AND the TDS are hung off and safely secured, stand by and prepare to lower the persons back to the drill floor. Then continue with the preparation work for the slip and cut operation7. After the necessary checks on the equipment are made inform the Toolpusher and proceed with the slip and cut operation (NOTE: at this time there should be a stand by man located at the drill line drum located at the rigs sub frame area with radio communications) 8. Tie off drill wire above / behind drawworks area9. Remove the wire from drawworks drum and coil / spool wire carefully on the rig floor10. Remove drill wire from fastening end point on drum and pass end down the V-door and on to catwalk for measuring and cutting operations11. After cut is made, fasten new end of drill wire to the drawworks drum and carefully spool drill wire back onto the drum, checking wire during this process12. In reverse order (as per the details in section 5 and 6) of this procedure, disconnect wires, slings and shackles (that are supporting the traveling block and TDS unit) in the derrick and reinstate the traveling block and TDS unit into service 13. Tidy up the work site, making sure ALL tools and equipment have been removed from the ALL work sites, that means, the crown block, the TDS unit, and the rig floor areas 14. Confirm with Company Man its safe for the rig to continue working operations PLEASE BE ADVISED: When carrying out the above drill line cut and slip procedure, if at any time there should ANY problems or concerns identified, the Total Company Man MUST be informed immediately. ITEMS FOR JOB / PREPARARTION CHECK LIST1. PLAN AND COORDINATION2. COMMUNICATION WITH ALL PARTIES3. PERMITS4. PRE JOB SAFETY MEETING5. ZPEB EQUIPMENT; MAN RIDING BELT, SAFETY HARNESS, SHEEVES, SLINGS, SHACKLES, CORRECT TOOLS WITH ROPE FOR TIEING OFF SAFELY 6. AS REQUIRED FUNCTION TE
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年智能养老服务驿站建设与社区治理创新研究
- 2025年水上乐园游乐设施市场竞争格局与品牌分析报告
- 2025年广播媒体融合传播中的媒体融合政策与监管研究报告
- 米面粮油采购合同范本
- 线上签署合同终止协议
- 济南铁路正式合同范本
- 酒店投资建设合同范本
- 银行双控账户合同范本
- 样品加工采购合同范本
- 法人之间借款合同范本
- 食品生产监管能力大比武理论考试题及答案
- 2024玻璃钢贮罐拆除解体施工合同
- 2022年中国居民膳食指南
- 2024-2030年中国病理检查市场专题研究及市场前景预测评估报告
- 第3章 即时定位与地图构建技术课件讲解
- 汽车用品采购合同
- P.E.T.父母效能训练
- 《研学旅行课程设计》课件-了解研学旅行概念
- 传统中医针灸技术操作规范
- 沅陵旅游宣传方案
- 个人防护用品使用和检查知识
评论
0/150
提交评论