




已阅读5页,还剩14页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Inspection items for 3500T shaft system installation after launching 3500T散货船下水后轴系安装交验项目Note:1. Surveyor and owner can make some necessary increase or decrease for the inspection items according different requirement.2. definition for the mark in the forma) O: owner representative attend itemb) C: surveyor attend itemc) R: the test report should be submitted to surveyor and owner3. The data for bearing load jacking-up test should be approved by BERG说明:1. 本项目船检、船东可按不同要求对交验项目作必要的增减。2. 交验项目表中的符号解释a) O: 需船东代表参加的项目b) C:需验船参加的项目c) R: 需向验船师、船东代表提供的试验记录报告3. 轴承负荷顶升报检数据需向BERG认可no.Inspection Items 验收项目Inspection time 验收阶段CORRemark备注1The position of stern shaft and fore seal double-check 尾轴与首密封位置复查报检Before alignment inspection对中报检前 2Stern shaft and G/B shaft line alignment 尾轴与齿轮箱轴线对中报检Before drill hole钻孔前Drill the holes of G/B foundation, if the alignment data is ok.3M/E absorber foundation installation 主机减震器底座安装During construction施工中All bolts that torque required 所有有扭力要求的螺栓4Measuring the data of absorb block 减震块数据测量48hours after absorber loading 减震器加载48小时后5First jacking-up test 第一次轴承负荷顶升报检During construction施工中Only do at after peak TK full condition 只做尾压载舱满舱状态6Measure dimension of stern shaft coupling bolts 尾轴联轴节螺栓尺寸测量Before construction施工前7Measure dimension of G/B coupling reamed hole 齿轮箱联轴节铰孔尺寸测量After construction施工后8PT for G/B coupling reamed hole 齿轮箱联轴节铰孔着色探伤After construction施工后9Stern shaft and G/B coupling bolts installation 尾轴与齿轮箱联轴节螺栓安装报验During construction施工中10Stern shaft and G/B coupling bolts torque inspection 尾轴与齿轮箱联轴节螺栓扭力报检24hours after installation 安装24小时后11M/E and G/B shaft line alignment 主机与齿轮箱轴线对中报检Before drill hole钻孔前Drill the holes of M/E foundation, if the alignment data is ok.12Shaft gen. and G/B shaft line alignment 轴带发电机与齿轮箱轴线对中报检Before drill hole钻孔前Drill the holes of shaft generator foundation, if alignment is ok.13Cleaning inspection before casting resin 环氧树脂浇注前清洁报检Before construction施工前14M/E and G/B shaft line alignment double-check主机与齿轮箱轴线对中复检Before casting resin 环氧树脂浇注前15Shaft gen. and G/B shaft line alignment double-check 轴带发电机与齿轮箱轴线对中复检Before casting resin 环氧树脂浇注前16M/E,G/B, shaft gen. casting resin 主机齿轮箱轴发环氧树脂浇注During construction施工中17Check the hardness of sample after casting resin 环氧树脂浇注后试块硬度检验After construction施工后18M/E foundation bolts installation 主机底脚螺栓安装报检During construction施工中19Shaft gen. foundation bolts installation 轴带发电机底脚螺栓安装报检During construction施工中20G/B bolts stamp transfer 齿轮箱螺栓钢印转移Before machining加工前21G/B fitted bolts holes reaming inspection 齿轮箱绞制螺栓绞孔报验After construction施工后22Check the dimension of G/B bolts, fitted bolts 齿轮箱螺栓、绞制螺栓尺寸检验After machining加工后23Magnetic particle test of G/B bolts, fitted bolts 齿轮箱螺栓、绞制螺栓磁粉探伤After machining加工后24G/B bolts, fitted bolts installation 齿轮箱螺栓、绞制螺栓安装报验During construction施工中25G/B fitted bolts torque inspection 齿轮箱绞制螺栓扭力报验24hours after installation 安装24小时后26M/E and G/B shaft line alignment double-check主机与齿轮箱轴线对中复检After G/B foundation bolts fixed齿轮箱底脚螺栓固定后Whether can be cancelled能否取消27Shaft gen. and G/B shaft line alignment double-check 轴带发电机与齿轮箱轴线对中复检After G/B foundation bolts fixed齿轮箱底脚螺栓固定后28Second jacking-up test 第二次轴承负荷顶升报检During construction施工中Only do at after peak TK full condition 只做尾压载舱满舱状态29M/E resilient coupling installation 主机弹性联轴节安装报验During construction施工中30Shaft gen. resilient coupling installation 轴带发电机弹性联轴节安装报验During construction施工中31G/B thrust block inspection 齿轮箱侧推块报验After construction施工后32M/E crank shaft deflection measure 主机曲轴差测量 After finish 完工后Cold state33M/E crank shaft deflection measure 主机曲轴差测量 After sea trial 试航后Hot stateTolerance requirement for items of 3500T shaft system installation after launching3500T散货船下水后轴系安装项目的公差要求序号No.公差要求tolerance requirement1艏密封前端面距衬套距离:155-158 mmDistance between fore end of fore seal and bush: 155-158 mm左右偏差SAG:SAG=0.05mmleft and right sag: sag=0.05mm上下偏差SAG:SAG=-0.10.05mmtop and bottom sag: sag =-0.10.05mm2a. 尾轴和齿轮箱之间的上下开口GAP:GAP=0.05mm 。a. between stern shaft and G/B, top and bottom gap: gap=0.05mm.b. 尾轴和齿轮箱之间的上下偏差SAG:SAG=-1.66(-0.03)0.05mm(尾轴端高)。b. between stern shaft and G/B, top and bottom sag: sag=-1.66(-0.03) 0.05mm(stern shaft end high)c. 尾轴和齿轮箱之间的左右开口GAP:GAP=0.05mm 。c. between stern shaft and G/B, left and right gap: gap=0.05mmd. 尾轴和齿轮箱之间的左右偏差SAG:SAG=0.05mm 。d. between stern shaft and G/B left and right sag: sag=0.05mm.3拧紧力矩650Nm+50Nm、1000 Nm、350Nm+30Nm、400NmTightening torque650Nm+50Nm、1000 Nm、350Nm+30Nm、400Nm4测量6个减震块四角的数据,单个减震块本身的数据误差不大于0.5 mm.所有减震块四角的数据在平均值1 mm内即为合格。Measure the data of 6 resilient support, the error of each resilient support should be no more than 0.5mm. Its qualified if the data of all resilient support is within average 1mm5P/P在0.8-1.2之间即为合格,具体由BERG认可。Its qualified if P/Pbetween 0.8-1.2, details to be approved by BERG6BERG提供,超差由BERG认可 BERG provide, out of tolerance should be approved by BERG738.0-38.025 mm8由检测公司认可 approved by measuring company9冷冻安装、清洁螺栓、清洁螺孔并涂二硫化钼 Frozen install, cleaning bolts and bolt holes, covered by molybdenum disulfide10拧紧力矩1420Nm5%Tightening torque1420Nm5%11高弹联轴节的后端面距主机测量端面的距离为6220.8mm。the distance between aft surface of flexible coupling and M/E measuring terminal is 6220.8mm.a. 主机和齿轮箱之间的上下开口GAP:GAP=0.50mm/m 。a. between M/E and G/B top and bottom gap: GAP=0.50mm/mb. 主机和齿轮箱之间的上下偏差SAGSAG=(100.97、200.81、300.69) +0.20mm。齿轮箱高b. between M/E and G/B top and bottom sag: sag=(100.97、200.81、300.69) +0.20mm。G/B highc. 主机和齿轮箱之间的左右开口GAP:GAP=0.50mm/m 。c. between M/E and G/B left and right gap: gap=0.50mm/md. 主机和齿轮箱之间的左右偏差SAG:SAG=0.20mm 。d. between M/E and G/B left and right sag: sag=0.20mm12轴带发电机弹性联轴器宽度: 381.3+0.50. 5mmWidth of S/G flexible coupling: 381.3+0.50. 5mma. 轴带发电机和齿轮箱之间的上下开口GAP:GAP=0.105mma. between shaft generator and G/B top and bottom gap: GAP=0.105 mmb. 轴带发电机和齿轮箱之间的上下偏差SAG:SAG=0.25mm 。b. between shaft generator and G/B top and bottom sag: SAG=0.25mmc. 轴带发电机和齿轮箱之间的左右开口GAP:GAP=0.105mmc. between shaft generator and G/B left and right gap: GAP=0.105 mmd. 轴带发电机和齿轮箱之间的左右偏差SAG:SAG=0.25mm 。d. between shaft generator and G/B left and right sag: SAG=0.25mm1314同上 same as above 15同上 same as above161718拧紧力矩350 NmTightening torque 350Nm19拧紧力矩350 NmTightening torque 350Nm202135.5-38.5 mm2236H7/k623由检测公司认可 approved by measuring company24冷冻安装、清洁螺栓、清洁螺孔并涂二硫化钼Frozen install, cleaning bolts and bolt holes, covered by molybdenum disulfide25拧紧力矩550 NmTightening torque550Nm26同上 same as above27同上 same as above28P/P在0.8-1.2之间即为合格,具体由BERG认可。Its qualified if P/Pbetween 0.8-1.2, details to be approved by BERG29pos.20350.0+40.0Nmpos.28350.0+40.0Nmpos.36960.0+110.0Nmpos.28165.0+20.0Nm30pos. 9180.0+20.0Nm pos.10110.0+15.0Nmpos.12180.0+20.0Nm pos.18110.0+12.0Nm31用0.05mm塞尺检查,插入深度不超过10mm。Check by 0.05mm feeler gauge, the insert depth should no more than 10mm32由MAK认可 approved by MAK33由MAK认可 approved by MAK浙江合兴船厂HXCC试验和检验记录Test & inspection recordSheet: 1船 名ship name:3500T4# 试验日期test date:检验或试验项目 尾轴与艏密封位置记录Insp &test item Stern shaft and fore seal position records 机舱温度E/R Temperature: 艏密封前端面距衬套距离: mmDistance between fore end of fore seal and bush: mm 尾轴位置示意图Stern shaft position sketch map 验船师Surveyor: 船东Owner: 检验员Inspector:浙江合兴船厂HXCC试验和检验记录Test & inspection recordSheet: 1船 名ship name:3500T4# 试验日期test date:检验或试验项目 尾轴与齿轮箱轴线对中报检Insp &test item stern shaft and G/B alignment inspection 机舱温度E/R Temperature: 艏吃水fore draft: m艉吃水aft draft : m尾轴与齿轮箱对中记录表格Stern shaft and G./B alignment record table 单位unit:mm项目Item测点measure point百分表读数dial indicator偏移sag公差tolerance偏移SAG上 top1.66(-0.03)0.05mm下bottom左 left0.05mm右right项目Item测点measure point百分表读数dial indicator曲折gap公差tolerance曲折GAP上 top0.05mm下bottom左 left0.05mm右right备注remark:齿轮箱比尾轴低 mm G/B is mm lower than Stern shaft验船师Surveyor: 船东Owner: 检验员Inspector:浙江合兴船厂HXCC试验和检验记录Test & inspection recordSheet: 1船 名ship name:3500T4# 试验日期test date:检验或试验项目 轴承负荷顶升报检Insp &test item bearing load lift-up inspection 机舱温度E/R Temperature: 艏吃水fore draft: m艉吃水aft draft: m 635mm lift-up record table活塞直径diameter of piston: 30 mm额定压力rated pressure: 5551 N活塞面积area of piston: 707 mm最大顶升压强max Pressure: 164 bar序号NO向上up向下down压强(bar)pressure压力(N)force距离(mm)distance压强(bar)pressure压力(N)force距离(mm)distance1107071641163022014141501060533021211409898440282813091915503535120848466042421107777770494910574248805656100707098560109567171090636390636311956717856010121007070805656131057424704949141107777604242151208484503535161309191402828171409898302121181501060520141419160113121070720164116300040mm lift-up record form 活塞直径diameter of piston: 30 mm额定压力rated pressure: 8229 N活塞面积area of piston: 707 mm最大顶升压强max Pressure: 223 barNO 向上up向下down压强(bar)pressure压力(N)force距离(mm)distance压强(bar)pressure压力(N)force距离(mm)distance1107072231574322014141901343334021211801272645028281701201956035351601131267042421501060578049491409898890636313091919100707012084841011077771107777111208484100707012130919190636313140989880565614150106057049491516011312604242161701201950353517180127264028281819013433201414192001414010707202231574300验船师Surveyor: 船东Owner: 检验员Inspector:浙江合兴船厂HXCC试验和检验记录Test & inspection recordSheet: 1船 名ship name:3500T4# 试验日期test date:检验或试验项目 主机与齿轮箱轴线对中报检Insp &test item M/E and G/B alignment inspection 机舱温度E/R Temperature: 艏吃水fore draft: m艉吃水aft draft : m主机与齿轮箱对中记录表格M/E and G/B alignment record form单位unit:mm项目Item测点measure point百分表读数dial indicator实际偏移actual sag公差tolerance偏移SAG上 top0.78-0.98mm下bottom左 left0.20mm右right项目Item测点measure point百分表读数dial indicator实际曲折actual gap公差tolerance曲折GAP上 top0.50mm/m下bottom左 left0.50mm/m右right主机弹性联轴器宽度Width of M/E flexible coupling6220.80 mm备注remark:主机比齿轮箱低 mm M/E is mm lower than G/B验船师Surveyor: 船东Owner: 检验员Inspector:浙江合兴船厂HXCC试验和检验记录Test & inspection recordSheet: 1船 名ship name:3500T4# 试验日期test date:检验或试验项目 轴发与齿轮箱轴线对中报检Insp &test item Shaft generator and G/B alignment inspection 机舱温度E/R Temperature: 艏吃水fore draft: m艉吃水aft draft : m轴带发电机与齿轮箱对中记录表格Shaft generator and G/B alignmen
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025福建宁德市三都澳大酒店有限公司秋季公开招聘2名工作人员笔试历年参考题库附带答案详解
- 2025山东人才发展集团有限公司社会招聘2人笔试历年参考题库附带答案详解
- 2025年长春中医药大学附属医院二道医院(院区)招聘(1号)(含专项招聘高校毕业生)(220人)模拟试卷及答案详解(易错题)
- 2025广东湛江市生态环境局坡头分局招聘1人考前自测高频考点模拟试题及答案详解(各地真题)
- 2025年九江市江汇物流供应链有限公司第二次公开招聘派遣制工作人员的模拟试卷及答案详解(各地真题)
- 2025年宿州市中医医院招聘卫生专业技术人员36人考前自测高频考点模拟试题及一套答案详解
- 2025年第二季度(第一次)贵州黔东南州天柱县招聘全日制城镇公益性岗位8人模拟试卷及答案详解(各地真题)
- 2025年三亚市直属学校赴高校面向2025年应届毕业生招聘81人考前自测高频考点模拟试题及一套完整答案详解
- 2025湖北咸宁市通山县政金融资担保有限公司招聘工作人员3人考前自测高频考点模拟试题及参考答案详解一套
- 2025年4月深圳市深汕特别合作区招聘事务员38人考前自测高频考点模拟试题(含答案详解)
- 2025中考语文名著《红岩》重点知识讲解及高频考点梳理+练习(学生版+解析版)
- 音乐节舞台搭建及拆除施工方案
- 2025年江苏省农业融资担保有限责任公司招聘笔试参考题库附带答案详解
- 《慢性硬膜下血肿》课件
- PRP治疗注意事项
- 2025年泰和县工投建设集团有限公司及子公司招聘笔试参考题库含答案解析
- 企业事业部制信息化与数字化转型
- GB 5009.229-2025食品安全国家标准食品中酸价的测定
- 高支模工程监理细则
- 环氧乙烷应急救援预案
- 2024-2025学年高中数学 第三章 函数的概念与性质 3.1.1 函数的概念教学设计 新人教A版必修第一册
评论
0/150
提交评论