全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
The construction contract of special boothContract Number: 20150402Place: Shanghai Pudong New AreaDate: April 2, 2015Party A: (hereinafter referred to as Party A)Contact:Tel:Fax:Cell phone:Party B: (hereinafter referred to as Party B)Contact:Tel:Fax:Cell phone:Accordance with the Peoples Republic of China Contract Law and the relevant laws and regulations, combined with construction features of special booth, both parties based in equality, voluntariness, consensus, for the 2015, the Shanghai New International Expo Center - (- -) which the special booth planning, production, stand construction, decoration, stand dismantling works and services etc. reached the following agreements:I. Project OverviewProject Name:Project time:Location:Project Area: Project Progress:Party B shall begin stand construction work at 13:00 on June 25, 2015;Party B shall complete the stand construction work on June 27, 2015;Party B shall be responsible for dismantling work after the show closing on June 30, 2015 .II. Cost of the project:The total construction cost of the contracted project (including tax): (RMB );Notes: 1, charged exhibition space (Raw) management fee will be paid by the Party B, and the total cost above shall contain such fee.2, the electric box application and usage fees will be paid by the Party B, and the total cost above shall contain such fees.III. The project funds and payment date:Party A within three working days from signing the contract date shall pay the 70% contracted total cost (RMB ) as advance payment. When Party A accept the finished booth constructed by Party B, Party A will pay for the remaining 30% balance (RMB ) to Party B be in cash or bank transfer. After Party B receiving the balance, the full invoice shall be delivered to the Party A.Party B has the right to refuse to start the construction before receiving the prepayment.IV. The liability of Party A and Party BParty As responsibilities:1) fully pay to Party B on schedule;2) to provide standard files including LOGO vector files, pictures, inkjet and other image files (for AI format, vector file or other available formats) within the specified time.3) assist the Party B related coordination. (Eg: raw space management fee, apply and pay the electric box etc.)4) when stand construction completed, Party A shall cooperate with Party B to check and accept it and any doubt should be noted on the spot, or it will be considered acceptable.5) from the booth setup to move-out, any damages of venues, space, facilities (such as electrical boxes, stadium floor, etc.) caused by Party A which shall take in charge of the compensation in accordance with the provisions of venues.6) shall go to the factory of Party B to check booth producing progress and quality.Party Bs responsibilities:1) party b is responsible for the preliminary design, factory production, the production of art (not including photo, prints and other graphic image design), material transportation, field construction, electrical installation and exhibition move-in;2) to ensure the safety of the construction, security problems in the process of construction, or any improper construction safety problems should be undertaken by party b;3) the booth maintenance and cleaning work during the show;4) to ensure the engineering quality and engineering construction progress, if construction delay caused by party b, the overtime expenses shall be borne by party b and construction will be subject to confirmed by the party as renderings. Renderings and quotation are attached.5) from the booth setup to move-out, any damages of venues, space, facilities (such as electrical boxes, stadium floor, etc.) caused by Party B which shall take in charge of the compensation in accordance with the provisions of venues.V. design changeDuring the period of construction, the design change will be processed in the following way:The written file of the change of original design should be send to Party B at least 15 days before booth settlement.Regarding the change, both parties should negotiate and carry on the construction plan by the written final design, otherwise party B shall have the right to refuse to change.As a result of the change, the added expenditure and the already cost according to the original design scheme shall be borne by party A.VI. Negotiation for increasing the workIf party A request to increase quantity of work during engineering construction, the two sides can negotiate and sign “project negotiation records”. After signed by both sides responsible persons of the engineering, party A needs to pay the increased cost to party B then the added work can be incorporated into this contract and constructed at the same time.VII. Problem solvingWhen there is a dispute between both parties, the specific project problems can be amicably settled through negotiation by both parties. If such negotiations fail, can sue to this contract signed place Shanghai pudong new area peoples court for disputes resolution.1. After signing the contract, in addition to legal irresistible factors such as natural disasters, earthquakes, war, any party has no right to unilaterally terminate this contract, if any party cancel the contract unilaterally, it should compensate for the other party for 30% of the total contracted money.2. Due to party A or party B violates other clauses in the contract or other agreement, it shall born the corresponding legal responsibility and the related economic losses for the other party.VIII. The contract comes into force and termination1. Come into force as of the date of signing the contract;2. After party B finishing the engineeri
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 胆管狭窄的护理
- 雨课堂学堂在线学堂云《病理学(安徽医学高专 )》单元测试考核答案
- 2026重庆市面向复旦大学定向选调应届毕业生历年真题汇编带答案解析
- 2026宁夏面向湖南大学招录选调生历年真题汇编带答案解析
- 2026年设备监理师之设备监理合同考试题库含答案【轻巧夺冠】
- 浙江国企招聘-2025年度台州天台县县属国有企业公开招聘12人备考题库及答案解析(夺冠)
- 四川省第七地质大队关于2025年下半年公开考核招聘工作人员(17人)备考题库带答案解析
- 2026年(通讯维修工)理论知识考试题库附参考答案【达标题】
- 中国水利水电科学研究院水生态环境研究所招聘科研助理2人备考题库附答案
- 2025年甘肃省陇南市徽县中医医院招聘执业药师备考公基题库附答案解析
- 《光伏发电组件工艺》课件
- 【MOOC】新媒体设计之图形图像处理-福建师范大学 中国大学慕课MOOC答案
- 铁道运营专业职业生涯规划
- 黄工为什么走?案例分析
- 血脂管理指导
- 《卧式拉力试验机》
- (完整版)医学英语(阅读一分册)翻译及答案
- 胰岛干细胞分化和定向
- 心电图危急值的识别与处理
- 舞蹈疗法行业商业机会挖掘与战略布局策略研究报告
- 九年级上册(2024修订) 第六单元 23 范进中举 公开课一等奖创新教学设计
评论
0/150
提交评论