(1)Box beam bottom.doc_第1页
(1)Box beam bottom.doc_第2页
(1)Box beam bottom.doc_第3页
(1)Box beam bottom.doc_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

the mold and wing imitate to adopt the steel template inner pad bamboo gum plank construction craft, the application of the new craft ability bigRaises a box of beam external appearance quality.Its craft process is as follows:(Pay a scaffold) the steel pipe spreads the steel template spreads bamboo gum the plank(spread reinforcing bar) clean up(Sprinkle to build concrete).(2)Box beam crest the template adopt a light material template-Ling mold inside the magnesium.The Ling mold inside the magnesium belongs to permanent sex template,As well calling a time of template of consuming is a template dont tore down after the structure reaches a concrete to sprinkle to build, and constitute to reach a piece dont be subjected toThe dint constitutes part.3.the reinforcing bar process and build(slightly)4.the concrete sprinkle to buildBecause now sprinkle continuous box of beam concrete to measure a little bit greatly, this engineering adopts compulsive type concrete mixer from mix to mix NingSoil transports pump to pump the concrete into a mold with the concrete.Request to match with than should meet rules, the strength matches to establishAccount a request, sprinkle to build the sequence sprinkles to build to the Dun crest from acrossed, horizontal from hang arm plank to sprinkle to build to the Dun crest.The Jin Jin superhighway IV marks mutual communication type in the Chinese harbor highway to sign to hand over the organization design of starting constructionPage 20Figure 4-4 supports put together to packFigure 4-5 Ling molds inside the magnesium start construction in the box beam sketch mapA BThe Ling mold inside the magnesiumSprinkle a box of beam nowSteel pipe supportThe bowl buttons up a support120cm 120cm 90cmThe Jin Jin superhighway IV marks mutual communication type in the Chinese harbor highway to sign to hand over the organization design of starting constructionPage 21The square one sprinkles to build scaleboard, stomach plank, the second step sprinkles to build a plank and wing plank concrete.Request to in multiple layers flap Dao, notLeak to flap, however flap.Establish specially assigned to protect concrete, cover with the soil work cloth Shan tight, water in time, promise concreteThe surface is damp.5.sprinkle a continuous box of beam construction now flow chart(see figure 4-6)Figure 4-6 sprinkle a continuous box of beam construction now flow chart(Five)Prepare in response to the dint concrete casket beam construction craftThe construction preparesThe foundation handlesPut kind support positionProp up a box of room side moldThe support takes to establishBuild a bottom mold, side mold and brush to take off a moldTore down a box of room side templateThe reinforcing bar colligation freestone handlesSprinkle square one to mix NingMix blend conveyance to mix NingDo to tryPieceHealthBox room crest the film prop upColligation reinforcing barSprinkle to build the second step concreteHealthThe freestone handlesMix blend conveyance to mix NingExamineTore down a support to prop up a bottom moldDo to tryPiecePress to try a pieceThe Jin Jin superhighway IV marks mutual communication type in the Chinese harbor highway to sign to hand over the organization design of starting constructionPage 221.prepare Zhang La in response to the dintAfter preparing to make casket beam concrete strength to attain a norm request, square can Zhang La prepare to tie in response to the dint.(1)Zhang Las material and tool elucidation:The steel wrings line:Adopt j 15.2 high strengths low relax 270 class steels to wring line, standard strength BE:RbY=1860 MPas.The anchor man has and enclosure:Adopt OVM15 and BM15 series anchor man to have and kit anchor man plastic sheet and spiral Jin.The anchor man hasThe beard matches current prepare to have and link a machine to apply a technical specification with the anchor man in response to the dint Jin .Prepare to prepare to cover up a gold in response to the dint piping adoptionBelong to a ripples tube to become bore.Above all material beards can use through taking out to check qualified rear of second examinations.Zhang Las machine tool:The jack adopts 1200 kNs and 200 kNs two kinds of specifications.All pieces pulling an equipments are before usingHave to pass by to correct, and pay to authenticate a report, is a reference document for pulling.You Liu promises gastight oil, electricityThe luck turns as usual, the manometer shows a stability.(2)Zhang Las project:Preparing to sprinkle to build in response to the dint beam should the completion, each reinforcing bar net and framework all need colligation to make itBecoming is whole, and accurate the steel preparing to cover up just curved Ju tie a ripples tube.Preparing to pull in response to the dint bunch piece should at be a beam body concrete strengthAttain 100%, and can carry on at sprinkling to build at the back of the 14 d, Zhang La should press syrup in time after completing, the preface of Zhang La Gong BE:0(the beginning starts in response to the dint)0.1 Rs are 1.03 R(the anchor man is solid)s, prepare to pull to depend on in response to the dint bunch piece symmetry originalThen carry on, the cross section wrings line to break silk or slippery the silk tie one silk with should control each time.Prepare to tie an adoption double to control Zhang La in response to the dint,Control in response to the dint contingency double.Zhang La is operated as follows:Zhang La goes forward to go jack and manometer kit examination

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论