石油工程科技英语写作.docx_第1页
石油工程科技英语写作.docx_第2页
石油工程科技英语写作.docx_第3页
石油工程科技英语写作.docx_第4页
石油工程科技英语写作.docx_第5页
已阅读5页,还剩3页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

石油工程科技英语写作Title1. An analysis of a new production method and its effect on oil recovery2. Analysis of production history for unconventional gas reservoir with statistic3. Experiments/Theoretical study of in with method4. Simulation (study) of in with method5. A (new) analytical solution of in with 6.New and improved methods for analysis in .7.Numerical-Simulationinvestigation of the effect of on in .8.Influence of on the prediction / performance of 9.Field application of approach for .10. Successful application of approach /method/technique for11.A statistical/well test/experimental/theoretical/numerical analysis case study/feasibility study/sensitivity study.Abstract常用句式一、重要性1. _are useful in _ because_2. _is an undeniable demand in _3. _is one of the most effective tools for _4. Nowadays _plays an important role in _5._have/has a significant impact on _6. Most _of _in _are based on the _ approach, which use _function.7. _are essential in _8. _is commonly applied in_9. A great deal of attention is paid to_10. _has long been regarded as one of the base tools of_11. _is one of the most _ for _ in _12. _provides powerful tools for _13. _is critical_14. _are widely used _ applied to _15. Horizontal wells have been known to reduce the water coning today.二、转折、引出1. Although various techniques have been proposed for _, one needs to be aware of strengths and weakness of each techniques attempting to apply(use) them.2. However, _is too _ (expensive/complicate)to _be used in (applied to) _3. However, _is not capable of solving the problem of _4. However, if _the approaches are most suitable for _.5. Failure to do _can lead to a significant error in the calculation of _6. However, the principal drawback in attempting to use _to describe the _ is that _ the pressure for which the equation is applicable is still far below the normal range of reservoirprocession.7. Use of _, would produce an error of _in calculated oil production rates.8. _is valid in the pressure range between 20003000psi. But it is less acceptable at pressure range between 40005000psi.9. _ assumes that _ and neglects the effect of _.10. The existing methods for _ are restricted by assumptions of _, They are not suitable for _.11. However, _ may not be directly applicable to any real porous media due to _.12. Even though numerous studies had been focused on _, to our best knowledge none of them considers the effect of _.13. But the effect of _ on _ is not presented in existing correlation. Therefore, it cannot be applied in _.14. However sometimes it is not economically viable to _ by _.15. It is noted that these methods have their own limitation _. Thus their reliabilities cannot be guaranteed.16. But when it comes to _, they cannot be applied.三、引出论题的常用表达1. Therefore this is turn yields more-accurate results, compared with that of _.2.To tackle the problem, .处理3.This paper extends the concept to application.4.Morereliable equationshave been derived in this study.5.It is, thereforeimportant to enable a reliable model to be built.6.Therefore new method needs to be found. 7.Therefore more accurate solution/experiment can be obtained using method.8.The correlation is valid to predict .9. can beused to account for 10.offers a new approach to .Literature review主动:1.(somebody)derived (something).某人推导了2. develope a theory/expression/corrlation .3. applied method to (什么范围)。把方法应用到4.used method to solve .5. claimed .某人宣称发明了6. extended to (新范围) .被动:1.(something) interducedby (somebody) .2.(something) presented/proposed/solved by . .3. assumption made by .(assumption made是固定用法)实验类:1. observed that .发现了实验现象2. found that .3. applied (原来) experiments to (新范围).某人将某一实验方法应用于4. reported form their experiments that .5.evaluated result of .6. patented a (技术) .(technique)7. conducted experimental/theoretical study. 进行了实验/理论研究8. includes the effect of .9. investigated the mechanism of .10. conducted that .11. studied .12. evaluated performance.13. recommended that . 建议14. was the first to consider to the effect of .15. performed studies.16. reported failed application.17. analyzed using method.关于解析解method: mathematical model /assumption1. model2. boundary condition3. assumption4. equation(s)图:1. Fig. _ illustrates a model of _ 2. The _ model is illustrated in Fig. _3. The well is located/placed at the top of the reservoir.At a distance _ away from the top of the reservoir.As shown in Fig._ , the reservoir contains _ horizontal/vertical wells.the drainage volume has a heighth, length a and width b .边界条件Transient condition瞬态条件Boundary conditionSemi-steady state condition拟稳定条件Steady state condition稳定条件The boundary effect is not be felt and the reservoir is considered to be infinite. (infinite acting reservoir)考虑到无限大油藏,边界条件无影响。The reservoir has a completely open outer boundary. The region for flow is bounded by _ above/below. 上下边界Assumptions假设条件:The major assumptions and approximations are as follows:主要假设和近似如下:1. _2. _3. _The assumptions are made in deriving the _ equation are _1. The reservoir is homogenous and isotropic/anisotropic.油藏均质,各向同性/各向异性。2. Fluids are immiscible and incompressible. 流体不混溶,不可压缩。3. The fluid has a constant viscosity , a small and constant compressibility. 流体粘度恒定,有较小的恒定的压缩性。4. There is a sharp interface between the water and oil-the transition zone/capillary pressure transition zone is neglected.油水界面明显,忽略过渡带(毛管压力过渡带)。5. The end-point values of relative permeability are used.使用相渗曲线上的端点值。作者排序:1. alphabetically2. head of laboratory terminal spot -prestige3. in order of importance Numerical Modeling数值模型numerical model schematics 数值模型的图1. The numerical model is a black oil model developed by CMG.2. A well is located3. The grid block size is _ at vertical direction.4. The grid block size is _ at horizontal direction.5. with 1000 blocks vertically/horizontally.6. The vertical/horizontal grid size is _.Boundary condition边界条件1. The model has a constant potential outer boundary obtained by attaching a infinitely large aquifer.模型存在一个由无限大蓄水层提供的恒定的潜在的外边界条件。2. The rock and fluid properties are listed in table _. 岩石和流体的物性参数列于表实验类provide enough detail, can repeat the experiment.The model was _wide, _high, _ thicks with five side made of _.Results and Discussion illustrations. clarification/simplificationphotos照片graphs : x-y plot, semi-log plot, log-log plotline art :chart: pie, bar/ histograms扇形图,柱状图/直方图tablestructure map 构造图 cross-section剖面图productionrecoverytemperaturewater cutproduction profile/historycooling profile for sampletemperature as a function of timeLocation of fieldprocess flow diagram for the systemmeasured datamodel(simulation)distribution of .modeling pressure responsepressure as a function of time, history mathPressureRwReRwRe1-SorSwcpressure distribution as a function of distance between=pressure profile betweenwater saturation distribution as a function of distance between=water saturation profile between关于公式1. The pressure can be defined by the equation2. The pressure at any depth can be calculated as p=0.35D+14.73. The pressure can be determined using equation4. p=0.35D+14.7 expressed as equationPV=ZnRT(1.1) (1.2)Solving equation 1.1 for V gives 从公式1.1中解出公式1.2 (1.3)The derivative of which 1.2 with respect to pressure is 1.3.公式1.2对P求导得公式1.3。 (1.4)and substituting these two expression (1.2,1.3) in equation(1.4) gives/becomes:The relation between Bgand E is The equation for C is derived as C由下式推导而得到ei(x) can be approximated as ei(x)近似等于/约等于which can be rearranged as Discussion:RwReThe pressure increase logarithmically with respect to the radius/distance shown in Fig._.The pressure drop is much more severe close to the well than towards the outer boundary.PressureTThe viscosity can be reduced by increasing the temperatureThere is a initial surge in the production followed by a steady decline as the temperature is reduced.The steam soak production rate in comparison to the unstimulated rate is shown in Fig._.When the production rate declines towards the unstimulated rate, the cycle is repeated.Oil RateTimeThe linear extrapolation of this line to t=0 gives the value of p=3000psi.直线外推到t=0时得到p=3000psip=3000psiTimePressurea

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论