动像博物馆 Word 文档.doc_第1页
动像博物馆 Word 文档.doc_第2页
动像博物馆 Word 文档.doc_第3页
动像博物馆 Word 文档.doc_第4页
动像博物馆 Word 文档.doc_第5页
已阅读5页,还剩3页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

动像博物馆 museum of moving image发布时间:2011-1-23关键词:建筑 公共 博物馆 美国 纽约 白色 数字 Leeser Architecture 非常感谢设计方Leeser Architecture将英文介绍和项目图片授权gooood发行。Appreciation towards Leeser Architecture for providing the following description: A complete redesign of the ground floor of Museum of the Moving Image, plus construction of a three-story addition and Courtyard Garden, will double the size of the existing building, enable growth and innovation in the Museums uniquely comprehensive presenation of screen culture in all its forms (film, television, and digital media) and welcome visitors into an experience in which architecture is seamlessly fused with the moving image. Major new program spaces include a 264-seat theater, 68-seat screen room, Video Screening Amphitheater, gallery for changing exhibitions, Education Center, on-site collection storage,caf, museum store and Courtyard Garden.LOCATION35 Avenue at 37 StreetAstoria, New YorkMUSEUM LEADERSHIPRochelle Solvin, DirectorHerbert S. Schlosser, Chairman of the Board of TrusteesARCHITECTThomas Leeser, Leeser ArchitectureMUSEUM LEADERSHIPRochelle Solvin, DirectorHerbert S. Schlosser, Chairman of the Board of TrusteesKEY DATESGroundbreaking: February 27,2008Public Opening: January 15, 2001SIZECurrent Museum Building: 50,000sq ftTotal New Contruction: 47,700sq ftIndoor 37,300sq ftTOTAL CAPITAL CAMPAIGN$67 million位于纽约的一个改建项目,将项目从花园到地下室通通改建一番,并增加与原有博物馆相同的面积。提供独特的文化面貌(电影,电视,数字媒体),并将其融合在建筑中,迎接每一位客人。新方案包括:264座的剧院,68座的放映室,画廊,教育中心,可变化的展示空间,仓储空间,咖啡馆,商店以及博物馆庭院花园。设计亮点很多,全投影技术与室内空间交融一体,大堂泛着凉爽的蓝光,倾斜的天花板形成了自然的聚会空间。264座的剧院非常科技化,墙面和天花由1136块三角板组成编织的纹样,配上活力的蓝光,动感十足。高清屏幕,舞台还可举办其他活动,也有空间放置配乐乐团演奏空间。小型展览区使用了最新科技,并提供互动。画廊的目的是用数字装置展示各类展览材料。三楼主要是研究人员空间。教育中心在地下,也占了三楼的部分,每年接待学校团体约6000名学生,还里一个小吃店。68座的放映厅一点也不逊色于大剧院,入口的红色和内部的灰色穿孔吸声墙面形成鲜明对比。这里体现亲密的尺度。室外庭院是学校团体入口,在夏天可以成为露天咖啡区和临时电影放映区。博物馆后侧的外立面是由1067块薄铝合金开放式组成的超轻前卫表皮。更多内容请看英文介绍。More:Leeser ArchitecturePeter Aaron/Esto. Courtesy of Museum of the Moving Image.DESIGN HIGHLIGHTSA relocated and redesigned entrance on 35 Avenue now presents visitors with a portal of mirrored and transparent glass with the words “Museum of the Moving Image” in letters three and a half feet tall. With its teasing play of lightmerging direct vision and reflection within a single planethe entrance is itself the first screen that visitors encounter at the Museum.As visitors move into the new lobby, across a polyester floor in a cool light blue, they pass along a 50-foot-long wall coated with screen paint, used as the surface for a seamless panorama of projected video, with works selected on a changing basis by the curatorial team. Lending a sense of dynamism to the visitors progression through the lobby, the projection wall is canted at an 83-degree angle. Toward the far end of the lobby, a new caf is located opposite a gathering space carved out beneath a sloping ceiling, whose angle follows the underside of the main theater.Visitors may turn to the right from the lobby and step up through either of two tunnels in Yves Klein blue into the new 264-seat theater: a space designed as a capsule for the imaginary voyage of moviegoing. The ceiling and walls are a woven felt surface of sensuous, vibrant Yves Klein blue, which slips under the stadium-rake seating to give the audience a sensation of floating. This wraparound surface is made of 1,136 triangular panels, fitted together with open joints with the lighting integrated within. Outfitted with an ample screen of classic proportions and projection equipment for formats from 16mm to 70mm and highdefinition digital 3-D, the theater will provide an unsurpassed filmgoing experience. A stage accommodates the Museums ongoing series of discussions and other live events, while a miniorchestra pit provides space for musical accompaniment of silent films.On the left side of the lobby, across from the entrance to the theater, stands the grand staircase.At the first landing, the staircase widens into a 1,700-square-foot Video Screening Amphitheater.The seats are an abstract landscape of built-in benches, while the wall above the staircase serves as the screen for changing exhibitions of moving-image works. Passing up the staircase to the second floor, visitors will find a small exhibition gallery, a secondary entrance to the main theater and an entrance to one of the two floors of the 15,000-square-foot core exhibition Behind the Screen, which has been completely refurbished with new monitors, computers, interactive software and lighting. At the top of the grand staircase, the new gallery for changing exhibitions on the third floor provides the Museum with its first completely flexible space for presenting cutting-edge new projects. With 4,100 square feet of unencumbered space, the gallery is designed to allow the Museum to present exhibition materials of every variety, from screen-culture artifacts to digital media installations. The new on-site space for collection storage, located on the third floor, serves an international community of researchers and scholars, offering unprecedented access to much of the Museums unparalleled collection of more than 130,000 objects. The new Ann and Andrew Tisch Education Center occupies the entire west side of the ground floor in both the addition and the existing building, as well as spaces on the third floor and the lower level. Enabling the Museum to accommodate twice as many school groups as in the past, to serve 60,000 students a year, the Education Center provides a dedicated group entry, the William Fox Amphitheater for student orientation, a flexible Digital Learning Suite with specially designed mobile computer workstations (divisible into two discrete media labs, or able to function as an open auditorium for up to 100 students), and the Nam June Paik Experimental Production Studio where students can record their own high-tech video works, finish them in a postproduction bay and distribute them to a world-wide audience via the Internet. A lunchroom will accommodate school groups that require this facility and previously could not benefit from tours of the Museum. Incorporated into the Education Center, but regularly used for public programs, is the new 68- seat film and digital Celeste and Armand Bartos Screening Room. Equal in excellence to the 264-seat main theater but presenting a striking design contrast, this secondary screening room has a hot pink entrance and features exposed loudspeakers and a grey, perforated acoustical wall surface, making it more of an exposed machine for the moving image. The space is ideal for more intimate screenings and presentations, as well as classroom and symposium use. The new, 10,370-square-foot landscaped Courtyard Garden incorporates the dedicated entrance for school groups. During summer months, it will provide space for an outdoor caf, and a large temporary screen may be installed for open-air movie showings.The new rear faade of the Museum is comprised of a surfacepattern of triangles like those in the main theater, but made in this case out of 1,067 thin aluminum panels, which are mounted on the support structure with open joints, so that every joint is a rain grate. Light blue in color, the panels look razorsharp but create the impression of a super-light floating skin dematerialized against the sky: another visual reference in the architecture to the infinite thinness of the moving image. In their pattern, the panels also bring to mind the lines of wireframe computer drawings. Because the triangular panels must fit together precisely to form the skin, the entirerear faade, which is approximately 200 feet long, is built to a tolerance of 3/16 of an inch.GREEN DESIGNThe project is being designed to achieve Silver LEED certification.ARCHITECTURAL TEAMLeeser Architecture, New YorkFounder and Principal: Thomas LeeserProject Manager: David LinehanDesign Team: Simon Arnold, Kate Burke, Sofia Castricone, Henry Grosman,Joseph HaberlCONSULTANTSOwners Representative: Levien & Company, Inc.Construction Manager: F.J. Sciame Constru

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论