



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
IMOGUIDELINES FOR THE OPERATION, INSPECTION AND MAINTENANCE OF SHIP SEWAGE SYSTEMS1 The Maritime Safety Committee, at its sixty-first session (7-11 December 1992), instructed the Sub-Committee on Ship Design and Equipment to include an item on standards for the design and construction of sewage systems on ships in the Sub-Committees work programme.2 This follows an incident on a passenger vehicle ferry which led to the tragic loss of life of two children. The investigation into this incident revealed several unsatisfactory aspects and highlighted the potential dangers associated with the operation of sewage systems on board ships if they are not installed, operated and maintained properly.3 The installation, operation and maintenance of sewage systems on ships is not currently provided for in any of the international conventions. Against this background and in consideration of the action taken by the Irish and the United Kingdom Governments, the Sub-Committee on Ship Design and Equipment, at its thirty-seventh session, developed guidelines to promote uniform standards in relation to the examination of the installation, routine inspection and regular maintenance of these systems, to ensure safe operation at all times. The Maritime Safety Committee, at its sixty-third session (16 to 25 May 1994), approved the guidelines, set out at annex to the present circular.4 The attention of Administrations and the industry is drawn to the recommendations contained in the guidelines and Member Governments are invited to apply them on all ships flying the flag of their State.ANNEXGUIDELINES FOR THE OPERATION, INSPECTION AND MAINTENANCE OF SHIP SEWAGE SYSTEMSIntroduction1 These guidelines apply to all ships. It is recommended that shipowners, masters and crew members should examine the sewage systems installed in their vessels, to consider the potential risks of sewage gases gaining access to working and living spaces.Background2 Different systems for the disposal of sewage may be found on ships and the following is e brief summary of the systems likely to be found on board:.1 Discharges from the toilet bowls into common sewage mains which are led to the ships side and overboard through storm valves.2 Discharges to collecting and storage tanks, with or without aeration facilities, in which the sewage is retained for disposal ashore or at sea.3 Sewage treatment systems incorporating a combination of collecting and treatment tanks, with processes designed to break down the sewage into effluent suitable for discharge into the sea without harmful effects.4 Vacuum collecting systems where sewage, air and water are drawn through piping to the holding/treatment tanks.3 Sewage flushed from the toilet bowls enters the sewage mains and storage tanks where it is broken down by naturally occurring bacteria. This is an aerobic process which strips oxygen from the water. producing more water. carbon dioxide and new bacteria. If insufficient oxygen is present, alternative bacteria become dominant and the process becomes anaerobic with the production of gases, including hydrogen sulphide, methane, ammonia, etc. These gases have highly toxic and flammable properties, in particular hydrogen sulphide is toxic to humans in concentrations as low as 10 parts per million and its flammable vapours are heavier than air so that potentially lethal pockets of gas may accumulate in enclosed spaces.Safety parameters4 The generation of toxic and explosive gases in the event of anaerobic conditions is present to varying degrees in each system. It is evident from the foregoing that anaerobic conditions in sewage systems leading to the production of toxic and flammable gases is an unacceptable hazard within the confined boundaries of a ship.5 In general sewage systems should be of a design which will avoid the problems outlined in these guidelines. The primary safety features should be incorporated in the design and operation of a sewage system and the barriers between the sewage gases such as water traps of the toilet bowls, ventilation of the pipework and tanks should only be considered a secondary means of protection, The primary objective should be the prevention of the production of hazardous gases within the systems.Storage and treatment tanks6 Sewage may be collected into storage tanks, either for holding prior to transfer to a treatment unit, or for later discharge. Any tank used for holding sewage is a potential source of anaerobic activity, and the resultant production of toxic and flammable gas. The design of a tank may include features to maintain an adequate oxygen level in the liquid, thereby eliminating anaerobic conditions. This may be achieved by direct air injection, or by air entrainment into the liquid whilst pumping through an ejector nozzle, etc.7 When not equipped with an active aeration feature, the conditions within the storage tanks should be especially monitored. These tanks should be completely emptied and flushed through at intervals which will ensure that satisfactory conditions are maintained. The design and configuration of such tanks should be such as to facilitate the effective drainage and flushing of the tanks.8 Treatment systems may use the aerobic digestion process, or may use other means to purify the effluent. The manufacturers recommendations for the operation and maintenance should be followed to ensure satisfactory operation at all times. All tanks and associated systems should be subjected to a thorough inspection at least every year or whenever unsatisfactory conditions are detected. Such inspections should include the following:.1 Removal of tank inspection covers, and the cleaning out of any deposits, paying particular attention to areas behind internal tank divisions.2 Inspections of the tank structure, internal divisions, pipework, etc.3 Checking of sensing instruments, level measuring devices and valves.4 Confirmation that air distribution systems are free from leaks and any nozzles or diffuser elements used to introduce air are in satisfactory condition.5 Checking that any internal systems used to transfer tank contents are in a satisfactory condition.6 Inspecting air blowers to check discharge pressure is within allowable limits.7 It is recommended that any alarms fitted to air blower systems operate on sensing of unsatisfactory air pressure rather than only monitoring the fans and their prime movers.Tank ventilation arrangements9 Ventilation pipes to collection, storage and treatment tanks should be in good condition, clear from internal obstruction, and of adequate size to minimize pressure drop and to ensure satisfactory clearance of gases. The size of the vent pipes should also be sufficient to vent any air from blowers or from vacuum collection system discharges. Ventilation pipes should be arranged to be self-draining at all angles of heel and trim, to eliminate any water traps that may otherwise form and cause blockage. Such pipes should not terminate in areas to which personnel have frequent access and should be clear of any sources of ignition. Any flame gauze or other fittings on the vent terminal should be checked for cleanliness.Toilets showers, washbasins, etc.10 Check all drain pipes for satisfactory water/gas tightness and adequate water seals and traps to prevent backflow of sewage gases into the toilet compartments. Check that all sanitary fittings are securely fastened to prevent relative movement at pipe joints. Toilet bowls incorporate a water trap and are often fitted with vacuum breaking arrangements at the back of the trap such as individual air pipes or patented backflow prevention valves. Such items should be checked for satisfactory condition and operation. There should be an adequate supply of flushing water to clear the toilet bowl and to replenish the water seal.Drainage and ventilation pipe systems11 Check that drains and their air vents are clear of obstruction and are in sound water/gas tight condition throughout their length and are self-draining at all expected angles of heel or trim. Adequate air vents should be fitted to the piping network, paying special attention to the extremities of the system. These should ensure an adequate supply of air and obviate any tendency for plugs of water to form within the system, tending to syphon or create vacuums thus removing water seals, when moving through the pipes especially under the action of violent rolling or pitching.Accommodation ventilation arrangements12 Particular attention should be paid to the exhaust and supply systems in toilet and washing areas. Ventilation systems to all compartments of a ship should be designed, installed and balanced to ensure satisfactory distribution of air. They should be maintained in a clean and efficient condition to achieve the designed air changes throughout the service life of the vessel. In general, attention should be paid to the following,.1 Examination of extraction grills, louvres, ducts, etc., in order to ensure that they are clear an-d free of accumulations of dirt, fluff, etc.2 Checking the adjustment of extraction louvres or cones to ensure an even extraction rate from all spaces. However, when satisfactorily adjusted, there should be no interference with these units as the adjustment of one unit can seriously affect the rate of extraction through other units. The design of these fittings should be such that they are not capable of manual adjustment without the use of special tools or equipment. Ensure that extraction units are never blocked off for any reason.3 Ensuring that air extraction from alleyways is operating efficiently and that essential air-gaps under cabin doors, etc., have not been blocked off.4 Ensuring that the forced ventilation of cabin spaces is operating efficiently.5 Inspecting the associated elements of ventilation systems, including:.5.1 Fans: Checking the direction of rotation, condition of impellers, etc.5.2 Flaps and dampers: Ensuring that they have not become detached from the operating mechanisms and that they are actually open when indicating open.5.3 Goosenecks and vents: Ensuring that they are clear of any obstructions, that grilles or meshes are not painted over, etc.5.4 Piping or ducting: Ensuring that these are intact and free from leaks throughout their length, especially where they pass through accommodation areas.Operational aspects13 The use of large quantities of disinfectant toilet cleaners may destroy the bacteria which are essential to the operation of aerobic sewage treatment plants. The manufacturers r
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 IEC 60335-2-50:2021/AMD1:2025 EN Amendment 1 - Household and similar electrical appliances - Safety - Part 2-50: Particular requirements for commercial electric bains-marie
- T/TSIA 007-2023软件企业核心竞争力评价规范
- JJF(石化)072-2023热分解原子吸收光度法测汞仪校准规范
- 重庆的山课件
- 暑假预习:质谱仪与回旋加速器 -2025人教版新高二物理暑假专项提升
- 老年人的压力课件
- 《创业与就业指导》课程简介与教学大纲
- 重力与弹力课件
- 老年人生理特点
- 老年人更换开襟上衣课件
- 2025年高考英语新课标Ⅱ卷点评及2026备考方向 课件
- 2025年学宪法、讲宪法知识竞赛题库及答案
- 2025广西专业技术人员公需科目培训考试答案
- 大中型企业安全生产标准化管理体系要求解读2025
- 【MOOC】《中国马克思主义与当代》(北京科技大学)中国大学MOOC慕课答案
- 画法几何授课计划-供参考
- 新人教版部编本四年级上册语文全册教材分析与教学建议(课堂PPT)
- 典范英语5a_01
- 常见急危重症的快速识别要点与处理技巧
- (完整版)GHS标识(高清)
- 混凝土结构设计原理教案(参考)
评论
0/150
提交评论