VS_Connection_Map_Icons.doc_第1页
VS_Connection_Map_Icons.doc_第2页
VS_Connection_Map_Icons.doc_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

此文档收集于网络,如有侵权,请联系网站删除Value Stream and Connection Mapping IconsMFG PROCESSIconRepresentsNotes1Manufacturing Process Label all processes. Also used for departments such as Production Control. Each box represents a flow.XYZ CORP2Outside SourcesUse to show customers, suppliers and outside manufacturing processes.# SHIFTSDATA BOXC/TC/O% SCRAP% UPTIME# PEOPLE3Data BoxUse to record relevant information concerning a manufacturing process, department, etc. Attach to the bottom of a Manufacturing Process or Outside Source box.4OperatorI300 pcs.1 day5InventoryNote count and time.6MarketplaceFollowing processes go to proceeding processes and withdrawal what they need when they need it. Controls production between flows and upstream production without scheduling.7Buffer or Safety StockNote Buffer or Safety Stock. Note count and time.Mon & Wed8Truck ShipmentNote frequency of shipments. Represent other models of transportation in a similar fashion.92 hrsFork Truck MovementNote frequency of movement.1030 minTugger MovementNote frequency of movement.116 wksBoat Movement/ShipmentNote frequency of movement.12Airplane Movement/ShipmentNote frequency of movement.13Movement of production material by PUSHIdentifies material movements that are pushed by the producer, not pulled by the customer (following process).14Movement of finished goods to the customerAlso shows movement of raw material and components from suppliers if they are not pushed.15Physical Pull Pull of material from a supermarket.16Manual Storage/RetrievalShows manual movement of material. Note frequency of movement.17FIFO DeviceIndicates FIFO continuous flow. Note maximum quantity.18Sequenced FlowIndicates FIFO and sequenced continuous flow. Note maximum quantity.19Manual Information FlowFor example: production schedule shipping schedule20Electronic Information FlowFor example: EDI faxWeekly Schedule21ScheduleDescribes an information flow.22Manifest or Sequential ScheduleDescribes a scheduling process that provides the sequence and time interval for production.OXOXO23Load LevelingTool to level the volume and mix of Kanban over a specific period.ACB24Load Leveling BoxTool to level the volume and mix of production Kanbans over a specified period of time. ACB25Kanban BoardPlace near production process where production Kanbans accumulate; e.g., Red-Green-Yellow Pull Board.26Kanban PostPlace where Kanbans are collected and held for conveyance.27Production KanbanTells a process how many of what can be produced and gives permission to do so. Dotted line indicates Kanban flow.28Lot Forming Production KanbanTells a process how many of what can be produced and gives permission to do so once required number of production Kanban signals are received. Dotted line indicates Kanban flow.29Withdrawal KanbanTells how many of what can be withdrawn and gives permission to do so. Dotted line indicates Kanban flow.30Signal KanbanProduction instruction that orders production from a batch process, e.g.: stamping.31A BC DPattern WheelProduction instruction that provides a pattern of production.32Go-See SchedulingScheduling based on someone looking and counting invento

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论