免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除QUALITY MANAGEMENT REVIEW管理评审报告Meeting Date : May-15, 2009Time : 2:00PM- 4:30PMVenue : DG office 5B conference roomChairperson : Attendees: MinutesThis management system review covers all XXXXXfunctions, including the Chemical-lab and Microbiological-lab. 1. Review the suitability and effectiveness of quality system A. External-Assessment Results The external assessments have not been conducted through CNAS until the application documents have been gone through and the laboratory audited by the CNAS auditors. CDLL chemical laboratory has been certified as ISO17025 requirement by SGS-CSTC Standards Technical Services Co., Ltd. from Dec-08, 08 to April-29, 09, training program of total 11 days divided to 11 sections including US / EU Standard Methods training, Laboratory staff technical training, ISO-17025 system set up and SOP documents written up, the meeting record referring to CDLL/A-13-02 of 程序文件.B. Internal Audit The internal-audit had been conducted by the CDLL laboratory Manager on April-30, 2009, the report has been summarized the control and set straight of Chemical Lab and Microbiological Lab running system per ISO-17025 criteria. All the correction actions is taking place and will be closed the end of May, 09. The audit focus on the following: 1. Corrective action on technical deficiency from staff were not trained and set back full skill on test methods compliance with ISO-17025 to fulfill the applied EU / US testing requirement from CNAS-AL-01-02 shown.2. Complete the 程序文件CDLL/A-(00-29)records for Chemical and Microbiological laboratory and make sure to continue assess from time being when necessary to keep record. The internal audit内审 was cooperated with SGS auditor, Henter Huang, throughout the above 11 sections set time and the corrective actions had been done in time and accept by auditors. The internal audit内审 report is referring to CDLL/A-11-03 of 程序文件CDLL/A-(00-29).C. Proficiency Test 能力认可and internal Correlation programsProficiency Test (PT): The lab had finished all the 2 rounds PT tests in 2009, including 2 major category EN71 and RoHS requirement that were organized by CNAS authorized _ organizations. The PT was highlighted and taken corrective action by P-lab. The action report No. is _ with report received on _ and the results were match and pass with their set data from their given samples. External-lab correlation testing (IQC):The lab had taken part in a lot of correlation tests including RoHS and 6 Phthalates during 2008-09. The results are satisfied (see the following summary): No.Name of RRTInitiatorEndLab listdescription1CDec 06RSTS Jan. 2007SZ, GZ, SH, total heavy metal content of fabric sample2Cadmium-001Guangzhou LabJan. 2007GZ, SZCadmium content in Rubber material. 3CANONJapan labJan. 2007SZ, GZ, HK, Pb/Ni+P in plating on Ni/SPCC sample4Inter-lab correlation exercise Jan 2007 - SoftlineRSTS HKMar,2007Phthalates & Azo dyes test in standard solution and samples 5SGS-BFR-PAT-011 RSTS TWApr.,2007PBBs&PBDEs in standard solution and samples6SGS-HM-PAT-012 (RoHS) / SGS-ELV-PAT-001 (ELV) RSTS E&E May, ,2007Heavy metal testing7Nintendo Round Robin Test Japan labJun. 2007phthalates content in pellet & powder by Nintendo method8EE/HL/SL 0708RSTSAug,2007phthalates9RRTP-0701Nov.2007Heavy metals (Pb, Cd, Hg, Cr)PBBs & PBDEsRoHS 6 items10Physical & Mechanical, Flammability Test SH-HGNov 2007HG,HKASTM F963-07,Canada Crc.931BS7272-1,2Internal Comparison Test from Technicians Comparison tests were completed and continue monthly according to the record on _ throughout year 2009 May. The reference standard _ were used as a correlation subject to be tested by 3 technicians in laboratory.D. Complaints & feedback from customers: In _ 2009, there was one complaint received from the client xxxx. The case was on that the laboratory report, which cannot meet with the clients requirement and the record is filed on CDLL/A-06-01.Our laboratory executive has taken relevant immediate corrective actions and the client end up accepted correction. To meet with our inner management requirement, corrective action was verified further through customer satisfactory survey which referring to the record on CDLL/A-06-02客户抱怨登记表and CDLL/A-23-01报告更改/补发申请表E. Corrective and preventive actions initiatedThe lab can taken corrective action for SGS raised external & internal audit, clients complaint / claim and unsatisfied results coming from comparison test in time. The individual 程序文件 regarding to preventive actions had been issued, and the preventive action plan need to be made in next lab meeting by 31st, May 2009.F. Inner Quality monitor resultsAll the lab quality monitors have been assigned and trained. The physical-lab and electrical-lab have issued the Inner Quality monitoring schedule and the relevant monitoring have been implemented according to the LQP021 in Jan 2008. But the chemical lab and C/S havent made the Inner Quality monitoring schedule, need to be followed up by early, 2008.2. Review current lab capacities and resources for future development/ New technology or equipment The lab shall applied for CMA accreditation for company future business development requirement. The lab technical colleagues title of relative professional engineer (English, computer exam, paper writing) should be followed up.3. Others:H. Training The quality system training shall be specified and strengthened with individual quality procedure implement to lab staff. The documents written method and the complaint /claim case etc. shall be trained in toys requirement. For the staff turnover rate is high, the new staff should be trained in technical in time. By 2010 year, the laboratory will increase headcount to 10 persons in total. Training program will be arranged the end of 2009 for the new staff and continuing education to old staffs. From time to time seminar hold by the third party that our staff are arranged to join for nourishing their technical knowledge.I. Household and safety: The safety training course for all lab staffs was conducted by QA coordinator in Feb 2007. The lab safety audit works were conducted by SGS global QA manager in June and by Shenzhen QA in Sep 2007 respectively. The Shenzhen HR and QA jointly checked the lab safety works in Nov 2007.4. Output / Improvement.Followed up: ItemsAction description Followed by Completed dateRemarkCorrective action for HOKLASThe customer satisfaction survey implemented according to LQP024 including response of phone etc.At early of March 2008Overall objectives &KPISome KPIs and objectives need to be redefined in 2008.At the end of Mar2008Preventive action Preventive action plan items raised At the end of Mar2008Training Document write e.g. SOP, WI and Claim/complaint case training courses shall be hel
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 手足癣的规范治疗与预防
- 眼科验光配镜技师考试试卷及答案
- 盐碱地改良工程师岗位招聘考试试卷及答案
- 研学旅行安全管控技师(初级)考试试卷及答案
- 烟田田间管理技师考试试卷及答案
- 2026年贵州省凯里市高二生物下册期末考试试卷【夺冠】附答案
- 2025年吉林省蛟河市高二生物下册期末考试测试卷(突破训练)附答案
- 2026年浙江省建德市高二生物下册期末考试试卷含答案(综合题)
- 2025年黑龙江省五大连池市高二生物下册期末考试模拟卷(考点梳理)附答案
- 2026年甘肃省临夏市高二生物下册期末考试测试卷及答案【夺冠系列】
- 2026年临床医师资格考试题
- 2026广西南宁市良庆区良庆镇人民政府招聘工作人员21人备考题库完整答案详解
- 2026年煤矿重大事故隐患判定标准题库(含答案)
- 2026年煤矿事故重大隐患考试题目及答案
- DB51T 2596-2019 公路梁式桥梁变刚度支座技术规程
- 北京工业大学《微机原理与应用》2023-2024学年期末试卷
- SF-T0095-2021人身损害与疾病因果关系判定指南
- AQ 1066-2008 煤层瓦斯含量井下直接测定方法(正式版)
- GB 1499.2-2024钢筋混凝土用钢第2部分:热轧带肋钢筋
- 《光伏发电工程预可行性研究报告编制规程》(NB/T32044-2018)中文版
- 2023急性中耳炎多学科团队救治中国专家共识(全文)
评论
0/150
提交评论