柱芯混凝土工程专项施工方案.doc_第1页
柱芯混凝土工程专项施工方案.doc_第2页
柱芯混凝土工程专项施工方案.doc_第3页
柱芯混凝土工程专项施工方案.doc_第4页
柱芯混凝土工程专项施工方案.doc_第5页
已阅读5页,还剩11页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

目 录1、编制依据22、施工部署63、施工方法73.1准备工作83.2施工顺序94、质量要求105、 预拌混凝土进场质量管理116、注意事项121、编制依据(1)施工图纸(2)主要规范规程(3)工程概况主楼柱子64根(含AZ12根),截面最大口800800,最小口500500,分段高度最高为14.45m。5层以上分段高度9.9m。裙楼12根,截面尺寸口500500。(4)各部位混凝土具体情况楼层柱编号标高范围长度截面尺寸单位砼体积数量体积总计起点终点(m)bh(m3)1Z1-0.200 4.650 4.850 8008003.104 412.416 Z2-0.200 4.650 4.850 6506502.049 4490.162 Z3-0.200 4.650 4.850 5505501.467 45.869 Z4-0.200 4.650 4.850 5005001.213 67.275 2Z14.650 9.450 4.800 7507502.700 410.800 Z24.650 9.450 4.800 6506502.028 4489.232 Z34.650 9.450 4.800 5505501.452 45.808 Z44.650 9.450 4.800 5005001.200 67.200 3Z19.450 14.250 4.800 7507502.700 410.800 Z29.450 14.250 4.800 6506502.028 4489.232 Z39.450 14.250 4.800 5505501.452 45.808 Z49.450 14.250 4.800 5005001.200 67.200 分段累计:341.801 4Z114.250 19.000 4.750 7507502.672 410.688 Z214.250 19.000 4.750 6506502.007 4488.303 Z314.250 19.000 4.750 5505501.437 45.748 Z414.250 19.000 4.750 5005001.188 67.125 5Z119.000 22.380 3.380 7007001.656 46.625 Z219.000 22.380 3.380 6506501.428 2434.273 Z319.000 22.380 3.380 6006001.217 2024.336 Z419.000 22.380 3.380 5505501.022 44.090 6Z122.380 25.680 3.300 7007001.617 46.468 Z222.380 25.680 3.300 6506501.394 2433.462 Z322.380 25.680 3.300 6006001.188 2023.760 Z422.380 25.680 3.300 5505500.998 43.993 分段累计:248.869 7Z125.680 28.980 3.300 7007001.617 46.468 Z225.680 28.980 3.300 6506501.394 2433.462 Z325.680 28.980 3.300 6006001.188 2023.760 Z425.680 28.980 3.300 5505500.998 43.993 8Z128.980 32.280 3.300 7007001.617 46.468 Z228.980 32.280 3.300 6506501.394 2433.462 Z328.980 32.280 3.300 6006001.188 2023.760 Z428.980 32.280 3.300 5505500.998 43.993 9Z132.280 35.580 3.300 6506501.394 45.577 Z232.280 35.580 3.300 6006001.188 2428.512 Z332.280 35.580 3.300 5505500.998 2423.958 分段累计:193.413 10Z135.580 38.880 3.300 6506501.394 45.577 Z235.580 38.880 3.300 6006001.188 2428.512 Z335.580 38.880 3.300 5505500.998 2423.958 11Z138.880 42.180 3.300 6506501.394 45.577 Z238.880 42.180 3.300 6006001.188 2428.512 Z338.880 42.180 3.300 5505500.998 2423.958 12Z142.180 45.480 3.300 6506501.394 45.577 Z242.180 45.480 3.300 6006001.188 2428.512 Z342.180 45.480 3.300 5505500.998 2423.958 分段累计:174.141 13Z145.480 48.780 3.300 6506501.394 45.577 Z245.480 48.780 3.300 6006001.188 2428.512 Z345.480 48.780 3.300 5505500.998 2423.958 14Z148.780 52.080 3.300 6506501.394 45.577 Z248.780 52.080 3.300 6006001.188 2428.512 Z348.780 52.080 3.300 5505500.998 2423.958 15Z152.080 55.980 3.900 6506501.648 46.591 Z252.080 55.980 3.900 6006001.404 2433.696 Z352.080 55.980 3.900 5505501.180 2428.314 分段累计:184.695 16Z155.980 59.280 3.300 6506501.394 45.577 Z255.980 59.280 3.300 6006001.188 2428.512 Z355.980 59.280 3.300 5505500.998 2423.958 17Z159.280 62.580 3.300 6006001.188 2833.264 Z359.280 62.580 3.300 5505000.907 2421.780 18Z162.580 65.880 3.300 6006001.188 2833.264 Z362.580 65.880 3.300 5505000.907 2421.780 分段累计:168.135 19Z165.880 69.180 3.300 6006001.188 2833.264 Z365.880 69.180 3.300 5505000.908 2421.780 20Z169.180 72.480 3.300 6006001.188 2833.264 Z369.180 72.480 3.300 5505000.907 2421.780 21Z172.480 75.780 3.300 5505500.998 2827.951 Z272.480 75.780 3.300 5505000.907 21.815 Z372.480 75.780 3.300 5005000.825 2218.150 分段累计:158.004 22Z175.780 79.080 3.300 5505500.998 2827.951 Z275.780 79.080 3.300 5505000.907 21.815 Z375.780 79.080 3.300 5005000.825 2218.150 23Z179.080 82.380 3.300 5505500.998 2827.951 Z279.080 82.380 3.300 5505000.907 21.815 Z379.080 82.380 3.300 5005000.825 2218.150 24Z182.380 85.680 3.300 5505500.998 2827.951 Z282.380 85.680 3.300 5505000.908 21.815 Z382.380 85.680 3.300 5005000.825 2218.150 分段累计:143.748 25Z185.680 88.980 3.300 5505500.998 2827.951 Z285.680 88.980 3.300 5505000.907 21.815 Z385.680 88.980 3.300 5005000.825 2218.150 26Z188.980 92.280 3.300 5505500.998 2827.951 Z288.980 92.280 3.300 5505000.907 21.815 Z388.980 92.280 3.300 5005000.825 2218.150 27Z192.280 95.580 3.300 5505500.998 2827.951 Z292.280 95.580 3.300 5505000.907 21.815 Z392.280 95.580 3.300 5005000.825 2218.150 分段累计:143.748 28Z195.580 98.880 3.300 5505500.998 2827.951 Z295.580 98.880 3.300 5505000.907 21.815 Z395.580 98.880 3.300 5005000.825 2218.150 29Z198.880 102.180 3.300 5505500.998 2827.951 Z298.880 102.180 3.300 5505000.908 21.815 Z398.880 102.180 3.300 5005000.825 2218.150 30Z1102.180 106.080 3.900 5505501.180 2833.033 Z2102.180 106.080 3.900 5505001.073 22.145 Z3102.180 106.080 3.900 5005000.975 2221.450 分段累计:152.460 总计:1909.014 PS:不含0.000以下柱芯混凝土及AZ混凝土。2、施工部署本工程所有混凝土均采用当地混凝土搅拌厂生产的流态商品混凝土,混凝土搅拌运输车运输,混凝土输送泵车浇灌。当建筑高度超过泵送距离时,采取塔吊吊运漏斗浇筑混凝土。根据施工工序及工期安排,在平台施工完毕或者梁柱系统找正完毕后浇筑柱芯混凝土,每段连续浇筑不得留施工缝,必要时两边作业,设专人负责检查,同时做好协调工作。主要机具准备:规格单位数量单耗量(KW)总功率(KW)备注塔吊STT553台2ZN-50型振捣器台41.14.4铁锹把10吊灰斗个22m33、施工方法本工程采用立式高位抛落无振捣法。由于本工程需浇灌混凝土的箱型柱最小截面为500500,因此适用立式高位抛落无振捣法,而且可以大大缩短施工时间。在抛落高度不小于4m的情况下,利用混凝土高位抛落,无需振捣。对于抛落高度不足4m的区段,应用内部振捣器振实。由于钢柱与梁相接部位均有水平加劲肋,因此需将振动棒伸入加劲肋位置振捣,以保证钢柱内部混凝土密实度。混凝土浇灌示例图3.1准备工作3.1.1钢柱,钢梁系统检查合格后方可进行混凝土施工。 3.1.2由商品混凝土搅拌站试验室确定配合比及外加剂用量。3.1.3 混凝土施工前,应做好试验,在经过业主、监理、检验部门确认后方可进行施工。施工前认真组织做好技术交底,并由专人负责严格按照方案施工。3.1.4 在混凝土运输工序中,应控制混凝土运至浇筑地点后,不离析、不分层、组成成分不发生变化,并能保证施工所必须的稠度。运送混凝土的容器和管道,应不吸水、不漏浆,并保证卸料及输送通畅。容器和管道在冬夏季都要有保温或隔热措施。3.1.5 混凝土应以最少的转载次数和最短的时间,从搅拌地点运至浇筑地点。混凝土从搅拌机中卸出后到浇筑完毕的延续时间应符合下表的要求。 混凝土从搅拌机卸出到浇筑完毕的延续时间 汽温延续时间(min)采用搅拌车采用其它运输设备C30C30C30C30252512090906090607545注:掺有外加剂或采用快硬水泥时延续时间应通过试验确定。3.1.6 浇灌混凝土使用的平台,必须安全稳固,能够满足使用要求。 3.1.7 在混凝土浇筑期间,要保证水、电、照明不中断。3.1.8 加强气象预测预报的联系工作。在混凝土施工阶段应掌握天气的变化情况,特别在雷雨大风季节和寒流突然袭击之际,更应注意,以保证混凝土连续浇筑的顺利进行,确保混凝土质量。根据工程需要和季节施工特点,应准备好在浇筑过程中所必须的抽水设备和防雨、防暑、防寒等物资。3.2施工顺序3.2.1实验柱的准备与施工:实验柱将选用口5005002525,高度9.9m,其结构与正式柱结构相同。钢柱与梁接触面有上下两个水平加劲肋,给混凝土浇灌带来了较大难度。因此本工程将采用ZN-50型振捣器,振动棒选用12m棒。在浇灌混凝土前,将振动棒从加劲肋浇注孔穿过,垂直插入到柱段最深处,试棒完毕后进行浇灌,每浇灌500mm左右,振动棒提升500mm,依次反复作业,直至箱型柱顶部。3.2.2混凝土浇筑和振捣一般要求:(1)本工程流水施工,每一流水段内混凝土连续浇筑,如必须间歇,间歇时间尽量缩短,并在下层混凝土初凝前将上层混凝土浇筑完毕。(2)浇筑柱混凝土前,底部先填以30-50mm厚的同配比砂浆。(3)使用插入式振捣棒要快插慢拔。每一插点要掌握好振捣时间,过短不易捣实,过长可能引起混凝土产生离析现象。一般每点振捣时间为2030s,但应视混凝土表面呈水平不再显著下沉,不再出现气泡,表面泛浆为准。3.2.3混凝土浇筑完毕及浇筑过程中设专人清理落地灰及玷污成品上的混凝土颗粒。3.2.4试块制作:常温时制作28d标养试块及备用试块,同条件试块。同条件试块置于现场带篦加锁铁笼中做好标记同条件养护。4、质量要求4.1商品混凝土要有出厂合格证,混凝土所有的水泥、骨料、外加剂等必须符合规范及有关规定,使用前检查出厂合格证及有关试验报告。4.2混凝土运送至浇筑地点,如混凝土拌合物出现离析或分层现象,应对混凝土拌合物进行二次搅拌。4.3混凝土运至浇筑地点时,应检测其稠度,所测稠度值应符合设计和施工要求。其允许偏差值应符合有关标准的规定。4.4 混凝土拌合物运至浇筑地点时的温度,最高不宜超过35;最低不宜低于5。4.5混凝土的养护和施工缝处理必须符合施工规范规定及本方案的要求。4.6混凝土强度的试块取样、制作、养护和试验要符合规定。4.7浇筑前由生产部门经常注意天气变化,如有

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论