新津项目工作周报宿舍楼7月第1周 时间:2013年7月1日2013年7月7日一、本周工作总结(Summary of the work week)1、 安全方面(Security):对存在安全隐患的问题坚决整改,着重对4号楼脚手架基础沉降进行了全面的处理,拆除脚手架8000多平方米,重新浇筑基础垫层及加固,对5号楼沉降部分基础也进行了加固处理,发生总费用约15万;On the existence of security risks and resolutely rectify the problem, focusing on the four basic building scaffolding for a comprehensive settlement of the processing, dismantling scaffolding over 8000 square meters, re-pouring base cushion and reinforcement, part of the basis for the settlement, Building 5, also carried out reinforcement , the occurrence of a total cost of about 150,000;新增加专职安全人员1名,着重加强学习和执行SSOE安全管理规定,针对目前施工现场存在的安全隐患和施工作业人员违反安全管理规定的现象,对违规违章不服从安全管理的人员重处重罚决不手软,严重违反安全管理规定者清理出场。Added a full-time security staff, focus on strengthening the implementation SSOE learning and safety regulations, the construction site for the current existence of safety hazards and construction workers violated safety regulations of the phenomenon of illegal violation of safety management personnel disobedience heavy penalties at lenience, serious violations of safety regulations by cleaning up appearances.2、 质量方面(Quality):项目部7月1日下午4点进行全面安全质量大检查,对存在质量问题的柱子根部漏浆情况,楼梯踏步漏浆情况要求了明确的整改方法及整改时间,杜绝下一步出现类似质量问题。Project Department at 16:00 on July 1st to conduct a comprehensive safety and quality inspection, quality problems of the pillars on the roots of plasma leakage situation staircase plasma leakage situation requires a clear rectification method and rectification time, the next step to eliminate a similar quality problems.3、 进度方面(Progress of):本周2#楼按进度要求完成,3#楼北楼按计划完成,3#楼(南楼)基础回填因地梁砼强度未达到75%,梁底模不能拆除;中部连廊基础因连续下雨开挖没有按计划完成,4#楼板层楼面达到进度要求,5#楼5层完成5层楼面模板安装,达到进度要求;厂区北段围墙因当地村民阻止施工,致使围墙施工全面停止。This week 2# building completed on schedule, 3# building completed according to plan, 3# building (South) based backfill due to beam concrete strength did not reach 75%, beam bottom mould cannot be removed; the central corridor foundation excavation due to continuous rain has not completed as planned, 4# floor floor to achieve progress requirements, 5# building 5 layer completion of the 5 floor installation of formwork, achieve progress requirements; thenorth wall for local villagers to stop the construction, resulting in the wall construction full stop. 二、本周工作成果1、2#楼地梁、基础短柱浇筑完成;2 # building ground beam foundation stud pouring completed;2、3#楼(北)基础梁浇筑及回填完成;3 # building (North) foundation beams pouring and backfilling completed;3、3#楼(南)地梁浇筑完成;3 # building (South) ground beams pouring completed;4、4#楼四层柱、五层梁板混凝土浇筑完成,外脚手架拆除,脚手架基础处理,外脚手架搭设完成;4 # building four columns, slab concrete pouring five complete removal of external scaffolding, scaffolding foundation treatment, external scaffolding erection to complete;5、5#楼三层柱、四层梁、板模板完成,柱筋完成100%,梁筋完成60%。外脚手架地基下沉处理完成,三层梁板模板拆除完成;5 # building three-column, four-beam, plate template completed, column reinforcement 100% complete, 60% complete beam tendons. External scaffolding ground subsidence process is completed, three slab formwork is removed to complete;6、 宿舍区东段围墙石材、铁花栏杆完成; Quarters eastern wall stone, iron ornamental railings completed;7、 安全质量大检查一次,日常工地安全、工程质量的巡检巡查等工作。 Safety and quality inspection once daily site safety, engineering quality inspection inspections and other work.三、问题及建议(Problems and Suggestions)1、 建议所有往来文件(含邮件),均为中英双语格式;Recommended for all exchanges documents (including e-mail), are bilingual format;2、 常规性报表建议统一格式,有特殊性要求的表格应有填表指南;Regular reports suggest a unified format, there are special requirements form should fill in a form guide;3、 请业主及时协调西侧农民拆迁安置问题,根本就不让我们施工;Please landlords timely coordination west resettlement farmers problems simply do not let the construction;4、 明确各专业、各工作安排及收发文件相关对口的人员与权限,明确下达工作任务与命令的人员。Clear every professional and work schedule, and send and receive files related counterpart personnel with authority, clear tasks and orders. 四、下周工作计划1、2#楼完成基础验收及土方回埋;2 # building complete acceptance and earthwork buried; 2、3#楼(北)一层结构浇筑完成;3 # floor (north) a layer structure of casting is complete; 3、3#楼(南)土方回填并夯实完成,一层模板脚手架完成;3 # floor (south) earthwork backfilling and compaction is completed, a layer of template scaffold is complete; 4、3#楼中部(连廊)基础开挖完成,基础垫层完成;3# floor central (gallery) foundation excavation, foundation padfinish; 4、4#楼六层楼面结构梁板钢筋模板施工完成,具备浇筑条件。一层结构梁板后浇带完成,二层楼面清理及砖砌体施工前的准备工作完成;4 # building six floor structure slab formwork construction steel finish, with the pouring conditions. Floor structure slab poured with complete second-floor cleaning, and brickwork construction preparation work is completed;5、5#楼六层楼面结构梁板钢筋模板施工完成60%;5 # building six-floor structure slab steel formwork construction 60% complete;6、 钢筋料场硬化,木工加棚搭设,新设吸烟区设置的完善,2#楼、3#楼施工道路的硬化本周内完成; Hardened steel stockyard, carpentry plus shed erection, the new smoking area set perfect, Building 2, 3 # Building construction road hardening completed within the week;7、 劳务全体现场施工作业人员使用的安全防护用品排查,不合格的安全防护用品全部更换完毕; All on-site construction workers labo
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年制造业成本控制工程师竞聘面试题详解
- 2025年有机硅、有机硅橡胶项目发展计划
- 拇外翻角度测量课件
- 护士半年度个人总结课件
- 2025年复配色粉项目建议书
- 2025年低温储运应用设备合作协议书
- 抛光安全培训目的及意义
- 2025年精密过滤输液器合作协议书
- 辽宁省名校联盟2026届高三上学期9月份联合考试数学试卷(含解析)
- 2025年新型高性能低合金钢、合金钢材料项目合作计划书
- 烧结基础知识课件
- 高中生物第一课-(共24张)课件
- 皮肤科质量控制指标
- 新教师跟岗学习实施方案
- 2022年高考全国甲卷:写作指导及范文课件16张
- 郭锡良《古代汉语》讲稿(不仔细看别后悔哦)
- 新媒体文案创作与传播精品课件(完整版)
- 合肥工业大学推免生综合评价加分细则
- (完整PPT)半导体物理与器件物理课件
- 保洁员的岗位职责景点保洁员岗位职责.doc
- 齿轮制造工艺手册
评论
0/150
提交评论