



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
method may be more disadvantageous thanWork.Pass comprehensive analysis, we draw up to adopt well point in the deep well to lower an underground water table.5.2.2Well point in the deep well declines water construction1.because the engineerings underground water table is higher and water measure a little bit greatly, we draw up to adopt well point in the deep well to decline water.The deep well well ordersFollow an engineering radicle the pit around leave a side on good luck of ascent 0.5 ms1.5 ms, present a wreath form decoration;Wells ordering should go deep into to arrive deeply water layer 6 ms9 ms,Usually should also compare the depth of declining water needed deeply several rices, the well is apart from for the 10 ms15 ms.Measure a circumstance to go again according to water while starting construction assuranceThe well point measures.Become a bore adoption the impact drill and protect wall with the mud, the bore constitution protects a tube, in order to prevent the bore caves in, and atA side establishes to line up mire ditch, mud pit.The bore path should compare a big 150 mms of the well tube diameter each side250 mms.Well tube in the deep well sinks before puttingShould pure bore, generally wash well or use to mourn a tube with the compressed air to again and again and up and down take out a mire residue to wash well, or use compressed air and divingThe pump associately washes well.Moreover this engineering can also consider that the stake bore that make use of ground floor outer circle is parts of wells to order.2.The construction craft procedure is:The well orders to measure a fixed position dig a well and Anne to protect a tube drill a hole to take seat drill a hole returnFill the well bottom sand mat layer mourn to put a well tube return to the gravel percolation of filling the well tube and bore wall layer wash well inside the well tube descend establish waterThe pump, gearing pumps water to control electric circuit try to pump water decline water well normal work decline water to complete to pull out a well tube seal well.3.Start construction important point:When the well tube bottom puts, will in advance create a good well tube to lend a Yang with three wood towers the machine cent segment the bottom establish,The cent segment welds firm, keep descend arrive well bottom.The well tube emplacement should try hard for perpendicular and be located in well bore in the center;Take care of a coping ratio naturallyNoodles Gao 500 mm is or so.The well tube percolation part should place at contain water layer adequacy of inside the scope, well tube bottom after going into, in time atWell tube and soil wall fill gravel to filter to anticipate.The grain path is bigger than the bore path of filter net, generally a 3 mmsthe thin gravel with 8 mms.SandThe Li filters to anticipate to match class to go together with a request, design gravel specification up, descend a limit outside of grain Shai in addition to, the qualified rate wants greatly in90%, the impurities content is no bigger than 3%;Can not use to load machine direct filler, the application iron Qiao bottom anticipates, in order to prevent layering asymmetryAnd pound at a well tube, fill to filter to anticipate to want a next 1 m that is continuous to complete, fill mouth of a well from the bottom or so, the upper part adoption doesnt contain freestoneThe clay seals.Tubes around filling sand to after filtering anticipate install water should is by rule to clean first to filter well before the pump, blunt in addition to sink a residue.Generally adoptWash a well method with the compressed air.5.2.3The stake radicle starts constructionThis engineering stake radicle behavior work digs bore to infuse to note a stake.1.Main construction procedure:Dig section 1 stake bore sprinkle section 1 concrete to protect wall two hurl measure in protecting wallElevation and stake ten word stalk line install the movable well cover, the wood Lu Lu support, dismantle a stanza mold and pay section 2 mold and section 2Protect wall to sprinkle to build again and up work preface circulation until design depth the check hold a dint layer the juniors line expand bottom stake the bore is overallAcceptance clean up falsely soil, exclusion to accumulate water(flowing out water to once measure should adopted underwater concrete to sprinkle to build a method while being big) mourn to put reinforcing bar cageStake the radicle examination check and accept.2.Dig a bore method:Dig bore sequence to follow is faced west a row by the east, from in the center to periphery.Digging bore after digging bore first deeply is shallow,The partition jumps the principle for digging and dig bore from artificial from up pursue a layer to use Hao and Qiao to carry on to the bottom, meet strong and tough soil to use hammer and Han broken up.This engineering stake carries into to suffer a stroke to turn rock strata, the rock strata opens to dig the main consideration adoption breeze Hao to carry on.Dig soil order of sequence for dig first in the centerAfter the part surroundings, expand bottom to adopt to dig a body pillar body in the park first for cent, then press expand bottom size from up arrive next pare soil to fix expand a bottom form,Leave soil to pack to go into to live inside the bottom bucket(or basket).The perpendicular conveyance is used wood Lu Lu the thick hemp cordage promote and mourn into after the ground and use cartCarry into a cake of Be piled, then concentrate from from unload a car to carry into construction unit appointed location.While digging bore if meet groundwater, can dig to gather a pond in a side, eject water with the submersible pump, gather pond along with dig bore deepThe increment of the degree but deepen, also need to prepare drum breeze machine and illuminate an equipments.3.Measure a control:Stake stalk the line adopt on the ground to establish ten word control point(the basis orders)s and use first to mourn from the basis pointHemp cordage center and stake line in the bore center of bucket is consistent, with Be dig soil the rough control line is used, while digging into certain depth againFrom ten word basis the point is used to mourn a line hammer ball to make control in the center and sought a park with the Chinese foot pole for week, measure bore by basis point deep, with assurance stake,Bore deeply and cut noodles size exactitude.4.Will process good reinforcing bar to carry into homework noodles, on the spot weld to model, the reinforcing bar cage can be moved bottle gourd with the 1 t orThe 5 t light car takes seat, should keep flection and cage body of reinforcing bar from turning round while mourning to put.5.the concrete sprinkle to build:Stake after bore and reinforcing bar check to check and accept qualified, the square can carry on sprinkling of concrete to build.MixNing soil the match provide through the my unit examinat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- DB23-T2945-2021-相变沥青混合料路面设计与施工技术规范-黑龙江省
- DB23-T2878-2021-过伐林红松大径材单株抚育技术-黑龙江省
- DB23-T2842-2021-政务信息资源数据交换规范-黑龙江省
- 基层医院采购管理制度
- 工具集中采购管理制度
- 工程公司工地管理制度
- 商场收银收款管理制度
- 创业培训教师管理制度
- 创业期间公司管理制度
- 外贸汽车采购方案(3篇)
- 部编版四年级语文《我们家的男子汉》教学设计及反思
- “共享平台广告获利”平台广告获利共享商业计划书
- 2024年宠物营养师考试针对性的复习材料与试题及答案
- 第18课《井冈翠竹》课件-2024-2025学年统编版语文七年级下册
- 水利洞内清淤方案范本
- 升压站电气施工方案
- 主题班会-好好说话与爱同行【课件】共2
- 2024年全国高中数学联赛(浙江预赛)试题含参考答案
- 办公家具采购项目投标方案投标文件(技术方案)
- 2025年中考物理知识点归纳(挖空版)
- 硫化钾测试报告范文
评论
0/150
提交评论