




全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
- . U-1, . (The tool) Drill String Pipe, tube BHA(Bottom Hole AssemblyKellyDrill BitCone rollerRock bit leg Drill Collar (DC)Drill Pipe (DP)Drilling Jar (Jar) Blade Stabilizer (Stab)NipplePin, Joint ()Tool JointCored Tubing Core catcher, core breakerTurbodrill (Volume)Total Hole Annulus Internal pipe volumeActive pits volume (Mud Pits)Active pits Trip tank Reserve pit Sump pitSlug pit (Cementing)CementingCementing unit Cementing head Check valve Tubing hanger Tubing spool Casing spool Dvtool Cement plug Stop ring ShoeW.O.C. (Waiting on cement)Tag (touch) cement on 456m 456 (Rig Job)DrillingReamingRIH (Run In Hole)POOH (Pool Out Of Hole)Fill well Circulation, ()Idle timeTransfer mud Back Reaming ( )Coring Flow check (Flow test) ()Cut/Slip Drill Line (/ )Wait MaintenanceWork pipe up and downBleed off gas to burn pit Bleed off pressure Pressure test-Tag Bottom Break Circulation Working the pipe up and downDisplace well to heavy-weight mud Pumping brine Squeezing Mud .Setting of packer Rig Repair Reverse circulation (Emergency worksol)Fishing tools Fishing Overshot Fishing socket Pipe cutterImpression blockFishing tap (Geophysics) Deviation SurveyWireline Logs (The personnelol)ToolpusherAssistant driller DerrickmenRoughneckRoustabout (BOP)BOP(blowout preventor)Test BOPc Discharge line X-tree Bonnet (adaptor spool)BPV(back pressure valve) ChokeFlare Line Flare (The drilling equipment)Monkey boardPipe rack Hoisting tackle Crown blockTraveling blockDrawworks Drilling Line Fast line ( )Dead line Vire line reeve string up Wire line clamp Shackle, bail Elevator LinksRotary tong Chain tong Bell Nipple Drilling Unit (:. , , )WinchSwivelDrum/BarrelFencingRig Floor Rotary tableRotary table busching Racking boardBlank, bull plug, blind flangeDerrick/mast/Doghouse- Entry guideEngineSledge-hammerNutMud pump Suction pipe, suction hose , , ()Mud hose , Discharge line , (-)ManifoldStand pipeSolid control system Mud settling trap pitShale ShakerHydrocycloneTraveling block position limiterLine guide ()Tong/wrench/spannerCellarBermsSubstructure Steel roughneck, power tong ()Cleanout Well To Completion Fluid . Drill Cement and/or Float Eqpt / F.I.T./L.O.T Hold Drill/Safety Meeting Hole Opening , ( ) Install and/or Test Xmas Tree Kill Well Land, Set and Test Completion Miscellaneous Mobilise/ Demobilise / Move/ Skid rig Nippel Up/ Nippel Down BOP Perforate Well Plug Back Production Wireline Work Program / Download MWD/ LWD . Pull Completion . Pull Suspension Plugs Pump Out Of Hole Rig Repier Rig Up and Tear Down Run Casing Run Completion Run Screens . Run/Pull Riser / Service Rig StimulationStuck Pipe Surface String Handling Suspend Well,Pull BOPs , Test equipment Test Well Tripping- Under reaming Wash Well Control Work Tubulars . Workstring Run .Co
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025江西省人民医院招聘康复治疗师助理2人考前自测高频考点模拟试题及答案详解参考
- 员工培训计划与跟进模板提升培训效果
- 2025年齐齐哈尔市富裕县富裕镇人民政府公开招聘公益性岗位人员10人模拟试卷附答案详解(模拟题)
- 2025黑龙江哈尔滨市松北区卫生健康局招聘乡村医生10人模拟试卷(含答案详解)
- 2025内蒙古首批事业单位“1+N”招聘2502名工作人员模拟试卷附答案详解(黄金题型)
- 租房销售知识培训总结课件
- 2025广西玉林市玉州区南江供销合作社招聘行政工作人员1人模拟试卷完整答案详解
- 2025贵州瓮安县“雁归兴瓮”人才引进考前自测高频考点模拟试题含答案详解
- 2025年威海荣成市卫生健康局所属事业单位公开招聘工作人员(57人)考前自测高频考点模拟试题及完整答案详解1套
- 2025广东茂名市化州市第二批就业见习岗位招聘42人考前自测高频考点模拟试题附答案详解(考试直接用)
- 2025年护理质控标准题库及答案
- 2025年农作物植保员岗位技术基础知识考试题库附含答案
- 2025年长宁储备人才真题及答案
- 光子嫩肤课件讲解
- 人力资源中薪酬管理案例分析题及答案
- 采购业务审计培训
- 2025-2026学年冀美版(2024)小学美术二年级上册(全册)教学设计(附目录P284)
- 服装色彩构成课件
- 化工仪表检修与维护课件
- 2025年华为软件开发工程师招聘面试题库及答案解析
- 程序化广告课件
评论
0/150
提交评论