



全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
The quality acceptance of the airiness and the air condition son cent department engineering records.(defend, row smoke system)(6)The quality acceptance of the airiness and the air condition son cent department engineering records.(in addition to dust system)(7)The quality acceptance of the airiness and the air condition son cent department engineering records(air condition system).(8)The quality acceptance of the airiness and the air condition son cent department engineering records.(decontamination system)(9)Start construction diary.1.19.3The breeze tube system installs1.19.3.1Basic rules(1)The breeze tube system has to carry on a tight sex examination after installing, the qualified rear can consign the next work preface.The breeze takes care of tight sex examination with lord, stem tube is lord.While processing the premise that the craft gets assurance, the low-pressure breeze tube system can adopt to leak a light method examination.(2)The breeze tube system mourns, the support adoption inflation stud bolt when the bulge anchor man method is fixed, have to meet the rules that it corresponds a technique document.(3)Breeze tube and parts wear a wall, lead building plank or house noodles, should establish to reserve hole, size and position should match a design request.(4)Breeze tube and air handle the indoor, can not spread to establish electric wire, electric cable and transport poisonous and easy gas body or the piping of liquid.(5)Breeze tube and accessories can dismantle to unload of connect and regulate organization, can not equip in the wall or the building plank.(6)Before breeze tube and parts install, should clean up inside the outside miscellaneous articles or objects and the filth, and keep to sweep.(7)The line long breeze tube connects an oscular allocation, can not narrow it to effectively cut noodles.(8)Should carry on a , hanger in time when breeze took care of to install of fix and adjust, its position exactitude, be subjected to dint should even.Being adjustable to separate to flap a pulling of, hanger to stretch or compress quantity should press to design to request adjustment.1.19.3.2The construction prepares1.19.3.2.1The technique prepares(1)Install breeze before the tube, should carry on diagram paper and construction to check on the scene, the check can press elevation and position of design to carry on gearing.The check pays, the spreading of hanger establish, equipments foundation and reserve if the hole meets a request.(2)The check has already created good breeze tube and parts:The breeze tube should not have already transform, distort, opened crack and hole, the method orchid sheds off;The method orchid opens Han, leak Han and leak blemishes like a dozen of stud bolts bore,etc.(3)Have perfect breeze tube the gearing start construction project, and carried on to record to say to hand over bottom.(4)The gearing is used a work machine tool and calculated tool in readiness, and check to use function intact.1.19.3.2.2The material requests(1)Various gearing material product should have a factory to admit certificate or quality consultation document.(2)The type steel(include flat steel, angle steel, slot steel and circle steel) should carry on acceptance according to the national current relevant standard.(3)Stud bolt, Luo mother, washer, the inflation stud bolt, rivet, pull a rivet, asbestos rope, rubber plank and seal completely gum, and electric welding Han.etc. should meet a product quality request, can not exist the blemish of influence gearing quality.1.19.3.2.3Main machine tool(1)In common use tool:The wrench(the head wrench, set tube wrench of the movable wrench, double, plum flower wrench) changes an awl(a word change awl, ten words to change an awl), hand electric drill, impact electric drill, the set drills and shoots to nail a gun, dubs out machine and hands over, subsidiary current electric welding machine(move a type), pour a chain(include to lengthen a chainPour a chain), wood hammer, clap plank, hemp cordage etc.(2)Measure tool:The spirit level, steel keeps a Chinese foot, steel tape measure and level instrument, the line falls to(the line of magnetic force falls to), Cape Chinese foot.1.19.3.2.4Homework condition(1)The gearing of well ventilated piping is proper to round to protect a structure construction to complete in the building, installing the stumbling block of part has been already cleaned up, ground without carry on under the condition of miscellaneous articles or objects;Purify system gearing, proper work well in the ground that the building inner part installs part, the wall noodles puts on ash to complete, the indoor has no dust to float in the sky or has the condition of dust palliative measure under carry on.(2)The craft prepares to install to complete or the equipments foundation have been already made sure, the directionses like conjunction tube,etc of equipments has been explicit.(3)The structure prepares to cover up an iron piece and reserve the position, size of hole to meet a design request.(4)The homework location should have homologous assistance facilities, like ladder, shelf, the ambulation platform, the power, and fire fight device.etc.1.19.3.3Material and quality important point1.19.3.3.1The material key requests(1)The breeze takes care of a method orchid the mat anticipates of the material, specification and thickness meet a design request, flexibility good, the thickness is even.(2)The size, specification and form of place with a draughts meeting is request, the surface is neat and didnt transform, from take to regulate part should vivid, have no the card Be puckery and loose to move.The surface sprays place with a draught in response to color even, have no color to differ, the surface didnt row a scar.(3)Breeze tube can not when the orchid link adopt a method orchid to put the specification, thickness and strength that and spring coil clip should ability Liu foot design and use request.(4)Breeze valve, gentle short tube and breeze hat and eliminate a machine adoption method orchid to link, its method orchid the specification should take care of a method orchid with breeze specification to mutually match.1.19.3.3.2The technique key requests(1)The breeze tube pays, the constitution of hanger should according to the spot the circumstance and standard diagram gather to carry on choice, as far as possible establish in the concrete wall, the building parts, such as plank and pillar.etc.Pay, of hanger be apart from have to be bigger than this standard of relevant request.(2)Pay a hanger gearing front, take care of the gearing position of design and play Chu the breeze tube line in the center according to the breeze, and depend on to first make sure that each one pays the concrete gearing position of hanger.1.19.3.3.3The quality ke
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 颜宁课件介绍
- 援建非洲合同
- 颜体书法课件
- 电路板焊工入门知识培训课件
- 购买古董合同
- 电视购物专业知识培训课件
- 门面装修工程施工合同试卷教案(2025-2026学年)
- 工商执法办案人员应知应会知识教案(2025-2026学年)
- 电网设施知识培训总结课件
- 2025年产品销售合同补充协议
- 2025mba考试科目真题及答案解析
- 应急知识技能与能力培训课件
- 2025中级注册安全工程师《专业实务-道路运输安全》案例 50 问
- 2025湖北襄阳老河口市清源供水有限公司招聘5人考试模拟试题及答案解析
- 2025年河南省文化旅游投资集团有限公司权属企业社会招聘52人笔试参考题库附答案解析
- 2025云南昆明元朔建设发展有限公司第一批收费员招聘20人考试参考试题及答案解析
- 2025年中华人民共和国治安管理处罚法知识竞赛题库及答案
- 智能化设备在板材加工中的应用-洞察及研究
- 第9课《天上有颗“南仁东星”》 课件 2025-2026学年统编版语文八年级上册
- DB44-T 2723-2025 水库汛末运行水位动态控制方案编制导则
- 《山水相逢》课件2025-2026学年人美版(2024)八年级美术上册
评论
0/150
提交评论