


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
精品文档.PURCHASE CONTRACT- Base on the Commercial Law (laws of different countries)dated(time)adopted by (country,nation),effective from (time)- Base on the capability of PARTY B (the suppler name) and the demand of Partner;Today,. Parties:PARTY A (THE BUYER):Address:Telephone:Tax code :Represented by:Title:PARTY B (THE SUPPLIER):Address:Telephone :Tax code :Represented by:Title:Following the authorization letter no. 01/2019/UQ was signed on 04/01/2019 valid until 01/01/2020.Both Parties here by agree to enter the purchase contract with the terms and conditions as below :ARTICLE 1: PURCHASE ORDERAccording to every particular time, Party A will send purchase order to Party B, Party B then start to perform the product based on the requirement of Party A. Purchase order must have the primary content as below:- Specification, quantity, design, drawing or description indetail (dimension, material, quality required.)- Nomination of material (if any)- Delivery time- Any amendments or additional conditions must be accepted by Party B in writing- The purchase order and amendment (if any) are indispensable part of this contractARTICLE 2: TIME OF FABRICATIONAt a time of the official purchase order of Party A be received, Party B will start to perform the product based on the purchase order of Party A, delivery time is followed to the agreement of both Parties.ARTICLE 3: DELIVERY METHOD, MATERIAL, PRODUCTS:- Delivery method and delivery place are followed the agreement of two Parties on each purchase order.- Material is followed drawing or specified by Party A.- According to the agreement of both Parties for each purchase order, material will be supplied by Party A or Party B. In case of supplied by Party B, Party B has responsibility to provide certification of origin for Party A (if required).- No good (NG) product is the product that does not meet the requirement shown on drawing or sample product.ARTICLE 4: PRICE OF PRODUCTAccording to the price presented on quotation of Party B for each requirement of Party A and accepted by Party A.ARTICLE 5: PAYMENT METHOD- Pay by cash or bank transfer to Party Bs account within thirty (30) days from the invoice received date and goods received date. All the bank charges incurred on the payment shall be borne by the Buyer.- If Party A delays the payment, Party A shall pay a penalty to Party B with the amount of 0.05% of the total purchase order value for each delayed day.ARTICLE 6: RIGHTS AND RESPONSIBILITIES OF EACH PARTYParty A - Providing information of requirement, product, purchase order fully and correctly.- Complying with the contract.- Making payment to Party B according to ARTICLE 5 in this contract.- In case of NG product detected, Party A shall inform Party B within 05 working days from the goods received date.- Responsible to check and receive goods delivered by Party Bwith accurate quantity and value of the purchase order.Party B - Supplying product correctly and sufficiently according to the purchase order of Party A complying with the contract.- Ensuring the quantity and quality of products according to purchase order of Party A.- Solving problem of NG product (if any)ARTICLE 7: COMMITMENT AND VALIDITY OF CONTRACT- Both parties commit to fulfill the terms and conditions of this contract.- In the course of contract performance, any amendment or additional condition must be announced by document for each other. Neither party has the right to unilaterally amend this contract.- Any difficulty that may arise out shall be settled based on discussion and respect each others legitimate rights. In case of unable to negotiate, any breach will be judged at Economic Court of China ,The verdict announced by the Economic Court will be mandatory and binding for both parties. All related cost of the litigation will be paid by the party who lost the case.- Neither party will be liable for performance delay or non-performance caused by force majeure cases such as : strike, fire, flood, war or embargo of the competent authority and it is not limited to natural disasters or any other conditions beyond the reasonable non control of both
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024抚州职业技术学院辅导员招聘笔试真题
- 征求意见表2:文成县糯米山药种植与加工技术规程
- 2025年应急救生系统项目合作计划书
- Recycle 1(第1课时) 教案人教pep英语六年级上册
- 绘画语言及其在创作过程中的思想研究
- 6~9的加、减法第4课时 练一练 教案 2025人教版数学一年级上册
- 在班队活动中重塑“爱的教育”
- 2024年深圳市光明区水务局招聘专干真题
- 2025年江苏省第十届大学生就业创业知识竞赛考试练习题库(150题)【答案】
- 2025年江油市招聘属公费师范毕业生考试试题【答案】
- 2024版《供电营业规则》学习考试题库500题(含答案)
- 做自己的心理压力调节师智慧树知到期末考试答案章节答案2024年嘉兴大学
- 学术期刊推广方案
- 安检设备采购安装调试方案
- 2023年保定市蠡县教师招聘考试真题
- 实习生-OFFER正式通知函
- 市政临时占道施工方案
- 《分娩方式的选择》课件
- 《FABE销售法则》课件
- 直流屏培训课件
- 培训课件 -BBF品牌建设模型-
评论
0/150
提交评论