全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
AFRICAN MINERALS LTD SWI 0455 Page 1 of 3 024 April 10First Issue Rev DateDescription of RevisionCheckedApproved SAFE WORK INSTRUCTION HERITAGE AND CULTURE Document Custodian Manager HSE Document Checked Document Approved TABLE OF CONTENTS 1 DISTRIBUTION2 2 SCOPE2 3 REFERENCE2 4 DEFINITIONS2 5 PROCEDURE2 5 1Identification of Archaeological Areas2 5 1 1Tender Stage Bidding for Works2 5 1 2Stage Letting Contracts2 5 1 3Award of Contract Stage3 5 2Planning and Monitoring3 5 3New Findings3 6 APPENDICES FORMS3 Nil SAFE WORK INSTRUCTIONSWI 0455 HERITAGE AND CULTURERevision 2 Page 2 AFRICAN MINERALS LTD 1 DISTRIBUTION There are no restrictions on the distribution of this procedure within the Company 2 SCOPE This procedure details the requirements covering the following archaeological and heritage issues Aboriginal sacred burial sites relics artefacts and Mabo style land rights claims Sites of archaeological significance Buildings and artefacts of heritage and cultural significance 3 REFERENCE Current applicable Standards 4 DEFINITIONS Nil 5 PROCEDURE 5 1Identification of Archaeological Areas 5 1 1Tender Stage Bidding for Works When developing a bid for project works the site will be assessed by the nominated Project Manager to determine the presence of any sites or issues of archaeological or heritage significance likely to impact on the project submission This is normally performed in conjunction with a site reconnaissance visit It may be appropriate to engage a specialist consultant to assist with this assessment if significant archaeological or heritage issues are anticipated Where archaeological or heritage issues are identified an appropriate management method shall be detailed in a site visit report and a cost included in the tender to deal with the issues 5 1 2Stage Letting Contracts Prior to tendering any site contracts the Project Manager will ensure that they are fully aware of regulatory requirements and archaeological and heritage issues pertinent to construction of the project It may be appropriate to engage a specialist consultant to assist with this assessment to ensure that the process is thoroughly covered Where archaeological or heritage issues are identified an appropriate management method shall be developed and included in the Project HSE Plan or Construction Environmental Management Plan The Project Manager will ensure that the Procurement Manager for the project is fully informed of any such archaeological or heritage issues The Procurement Manager shall refer to relevant archaeological or heritage issues and management requirements in all subcontract tender documents Contractors will be instructed to include the cost of managing these issues into their bid SAFE WORK INSTRUCTIONSWI 0455 HERITAGE AND CULTURERevision 2 Page 3 AFRICAN MINERALS LTD 5 1 3Award of Contract Stage The Project Manager or nominated delegate shall ensure that all archaeological and heritage issues are included in the HSE Plan or Project Management Plan and that the work instructions ITPs and checklists required to implement the management strategy are developed Prior to and during construction works The Construction Manager in conjunction with the respective Supervisor shall cordon off areas identified to be of archaeological or heritage significance using sign boards barrier tapes para webs or other approved markings 5 2Planning and Monitoring The Project Manager or nominated delegate shall develop documentation such as checklists for monitoring the control and administration of the archaeological and heritage sites The documentation shall address the following monitoring criteria frequency of monitoring The developed documentation shall be reviewed and authorised as specified in the Project HSE Plan or Construction EMP The Construction Manager shall ensure that the environmental practices required for archaeological and heritage sites are established by the project team Once established the monitoring of archaeological and heritage sites shall be performed and documented by the Construction Manager or nominated delegate in accordance with the Project HSE Plan or Construction EMP requirements 5 3New Findings Where new archaeological or heritage sites or issues are identified during the course of construction the Construction Manager shall Immediately and safely cease all works that could damage the site or artefacts detail the nature extent and significance of the discovery in a report to the Project Manager identify and cordon off the area Prevent any personnel from entering or disturbing the site Assist to develop a management strategy for the new find Only authorise subcontractors to recommence ceased works when approval to re start works has been gained from the Project Manager and relevant authority Ensure that any new management and monitoring strategies developed as a result of the find are implemented on recommencement of works On receipt of the report the Project Manager shall Inform the Manager HSE on the nature and extent of the issue Immediately inform the Client on the nature and extent of the issue Immediately inform the relevant statutory authority and seek their advice to develop an appropriate course of action to manage the new find in conjuncti
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年12月大学英语六级考试真题第1套(含答案)
- 老年性白内障常见症状及护理措施
- 痴呆症典型症状解读及护理建议
- 自主招生自我介绍模版
- 销售训练经典讲解
- 遂川县城控人力资源管理有限公司2025年公开招聘工作人员部分岗位要求调整及延期笔试考试参考题库及答案解析
- 2025贵州遵义余庆县招聘城镇公益性岗位人员12人考试笔试备考题库及答案解析
- 2025下半年四川轻化工大学考核招聘体育教师1人笔试考试备考试题及答案解析
- 2025北京九洲科瑞科技有限公司招聘技术工程师等岗位9人笔试考试参考题库及答案解析
- 2026国家粮食和物资储备局直属联系单位招聘应届毕业生28人笔试考试备考试题及答案解析
- 电大财务大数据分析编程作业3
- MOOC 大数据技术原理与应用-厦门大学 中国大学慕课答案
- 人教版七年级地理上册期中考试大题提分训练(附含参考答案)
- 烤肠工艺流程图
- 2023年广告制作验收报告(5篇)
- 《宠物疫病与公共卫生》期终考试试卷及参考答案
- 新版氨水安全技术说明书
- 青海省基本医疗保险门诊特殊病慢性病病种待遇认定表
- 幼儿园数字练习帖10
- YS/T 850-2012铝-钢复合过渡接头
- GB/T 9124.1-2019钢制管法兰第1部分:PN系列
评论
0/150
提交评论