项目密闭空间作业流程_第1页
项目密闭空间作业流程_第2页
项目密闭空间作业流程_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

项目密闭空间作业流程项目密闭空间作业流程 1 箱体内动气 动火 油漆作业必须审批手续齐全 措施完善 专人监护 制度 必须落实到位 严禁明火与涂装同时作业 2 箱体内作业必须两人以上 要求互相监护 每隔一个小时要出箱体作短暂休息 3 任何部门 施工队在进入箱体作业前必须用测爆仪对箱体内的可燃气体浓度进 行测爆 确认无误后再设置通风设备和其它防护措施 各级相关负责人到位监 护 方可进入作业 测爆员填写好测爆单 并报部门 安全办备案 4 测爆员必须经过专业培训持证上岗 测爆要按规定进行操作 要有记录 具体 测爆规定如下 施工队测爆员测爆 填写测爆记录单 将测爆单分别送部门和 安全办备案 部门和安全办根据测爆单进出抽查测爆并做好记录 测爆单上必 须有测爆人签名和施工队老板或部门负责人的签字确认 5 380V 220V 鼓风机金属外壳必须有接地 照明行灯必须使用低压电源 进入 箱体内的电源线必须完好 绝缘 不得随意摆放 要整齐规范 接头最多不能 超过二个 并且要包扎完好 经测验保证绝缘 6 作业时必须戴好防护器具 箱体内作业人员不能太多 要保持适当距离 以免 伤到他人 7 作业人员必须随身佩戴测电笔 随时测量使用的电源线 如有漏电现象 立即 采取补救措施 及时更换 8 定期对进入箱体作业的氧 乙炔皮管接头进行漏气检查 要有详细记录 氧 乙炔皮管必须随人进出 确保作业安全 Safety Rules for Confined Space CFS Entry on Project 1 Works such as using gas lines hot works or painting activities must under an authorized Permit with all safety measures in place and designated standby person Never commence painting while with open flames around 2 Not less than 2 people are required working inside the CFS as to watch for each other and must get out the CFS every one hour for a short break 3 Perform air test 1st for any potential flammable gas existing inside the CFS and confirm it s in the safe condition before entry After that manual ventilation and other safety measures with standby person shall be considered and put in place The test results shall be properly filed and report to relevant department 4 The designated people who are responsible for the Air Test shall be trained before work and shall comply with all procedures as required The Test Result shall be documented accordingly Here are the steps for Air Test Air Test fill the test report send the test report to relevant department and safety department for filing double check occasionally by safety department and recorded The test report shall be signed by the people conducted the test team leader or the responsible people of the relevant division 5 The fans 380V or 220V must be grounded and use safe and low voltage illumination inside the CFS with intact and well insulated powers cables Less than two cable connections shall be ensured with intact insulations 6 Personal Protective Equipment shall be used properly during the operation with limited people inside the CFS and keep proper distance in between the workers to avoid the hurt to the others 7 The entrants shall bring test pencil with them to detect any potential ground fault leakage Any cable damage or current leakage shall be reported and corrected immediately 8 All the joints on the oxygen and acetylene hoses shall be inspected occasional

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论