已阅读5页,还剩13页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
DR. Nabil Dmaidi,Concrete Structures,DR. Nabil Dmaidi,Units of Measure,Concrete:Cubic YardSteel:Lb or tonsFormwork:Square feet per contact area,DR. Nabil Dmaidi,Types of Concrete construction,1.Foundations2.Columns3.Slabs and beams,DR. Nabil Dmaidi,DR. Nabil Dmaidi,Shallow Foundation,DR. Nabil Dmaidi,Deep Foundation,Caissons,Piles,DR. Nabil Dmaidi,Columns,ShapesSquare - Rectangle - CircularOthersReinforcementOrdinary - Spiral,DR. Nabil Dmaidi,Slabs and Beams: One-Way slabs,One-Way Slab, Beam, and Girder,One-Way Slab, Supported by Beams or Walls,One-Way Joist Slab,DR. Nabil Dmaidi,Slabs and Beams: Two-Way Slabs,Flat Plate,Two-Way SlabSupported by Beams,Flat Slab,Waffle Slab,DR. Nabil Dmaidi,Estimating Issues,1.Formwork is the largest cost item that represents 40% to 60% of concrete structure cost.,Distribution of costs for cast-in-place concrete slab wall:,DR. Nabil Dmaidi,2.Waste allowance from 2% to 10% should be added for concrete and concrete formwork.,DR. Nabil Dmaidi,1. Center Line Method,Calculations:1.Length = 3010” - 16”= 294”2.Width = 4010” - 16”= 394”3.Perimeter = 294” + 294” + 394” +394”= 137”4”4.Volume of concrete = 137.33 x 1 x 1.5= 206 ft3,3010”,30,400”,4010”,Building size: 30 x 40,DR. Nabil Dmaidi,2. Sectional Method,Calculations:1.Length = 10.833+40.833= 81.672.Width = 27.833+27.833= 55.673.Perimeter = 81.67+55.67= 137.34 Total Linear ft4.Volume = 137.34x1x1.5= 206 Cubic feet5.volume in CY = 206/27= 7.6 Cubic Yards,3010”,2710”,4010”,DR. Nabil Dmaidi,COST OF OTHER COMPONENTS OF CONCRETE WORK,1.Reinforcement Steel2.Forms3.Concrete Mix4.Finishing5.Curing,DR. Nabil Dmaidi,Table 1.DIMENSIONS & WEIGHT OF WELDED WIRE FABRIC,DR. Nabil Dmaidi,Table 2SIZES & WEIGHTS OF REINFORCING BAR,DR. Nabil Dmaidi,EXAMPLE:,How many pounds of rebar are required for the concrete floor area below?,6” Concrete slab with #4 rebar 15” on center each way,20,60,40,30,DR. Nabil Dmaidi,Step #1: Calculate the total SF of area involved.200 X 300 = 600 SF300 X 400 = 1 200 SF Total= 1,800 SF floor areaStep #2: Calculate the pounds of rebar per SF of floor based on the unit spacing of the rebar at any point of intersection.Unit area:15 X 15 = 1.25 X 1.25 = 1.56 SFUnit rebar length: 1.25 + 1.25 = 2.5 LFLbs. of rebar/unit:= 2.5 LF X .668 lbs/ LF = 1.67 lbsIt is now known that there are 1. 67 lbs of rebar per 1.56
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 建筑装饰企业铣工日常检查安全操作规程
- 2026年时事政治热点题库考试试题库及参考答案
- 加油站纵火事件应急演练脚本
- 新生儿科血液透析管路蛋白沉积应急演练脚本演练方案
- 炼钢厂安全制度考试题及答案
- 2026年春广东省中职“3+证书”高职高考语文真题(含解析)
- 项目开工扬尘治理方案落实与监管手册
- 《房屋产权赠与登记管理手册》
- 2025-2026学年教学楼园林设计
- 2025-2026学年pep三上u5大单元教学设计
- 县政协机关会议制度
- 2025-2030布基纳法索农业产业化发展推动市场供需变化扶贫开发规划研究分析
- 25秋一上语文期末押题卷5套
- 抗肿瘤药物临床使用管理规范与实践
- GB/T 21402-2025农业灌溉设备灌溉首部
- GB/T 22838.3-2025卷烟和滤棒物理性能的测定第3部分:圆周非接触光学法
- 临床用血技术规范(2025年版)学习课件
- GB/T 176-2025水泥化学分析方法
- 殡仪馆消防安全教育培训
- 自然资源的价值与评估
- DB13∕T 5193-2020 普通干线公路路网监测点布设与建设技术规范
评论
0/150
提交评论